MONTHYEARInspection Manual Change Notice 24-034, Table of Contents for Inspection Manual Change Notice 24-0342024-10-31031 October 2024 Table of Contents for Inspection Manual Change Notice 24-034 Inspection Manual Change Notice 24-033, Table of Contents for Inspection Manual Change Notice 24-0332024-10-29029 October 2024 Table of Contents for Inspection Manual Change Notice 24-033 Inspection Manual Change Notice 24-031, Table of Contents for Inspection Manual Change Notice 24-0312024-10-25025 October 2024 Table of Contents for Inspection Manual Change Notice 24-031 Inspection Manual Change Notice 24-032, Table of Contents for Inspection Manual Change Notice 24-0322024-10-25025 October 2024 Table of Contents for Inspection Manual Change Notice 24-032 Inspection Manual Change Notice 24-030, Table of Contents for Inspection Manual Change Notice 24-0302024-10-23023 October 2024 Table of Contents for Inspection Manual Change Notice 24-030 ML24150A2392024-07-29029 July 2024 IMC 2562 Light-Water Reactor Inspection Program for Restart of Reactor Facilities Following Permanent Cessation of Power Operations Inspection Manual Change Notice 24-023, Table of Contents for Inspection Manual Change Notice 24-0232024-07-29029 July 2024 Table of Contents for Inspection Manual Change Notice 24-023 Inspection Manual Change Notice 24-022, Table of Contents for Inspection Manual Change Notice 24-0222024-07-26026 July 2024 Table of Contents for Inspection Manual Change Notice 24-022 Inspection Manual Change Notice 24-021, Table of Contents for Inspection Manual Change Notice 24-0212024-07-24024 July 2024 Table of Contents for Inspection Manual Change Notice 24-021 Inspection Manual Change Notice 24-018, Table of Contents for Inspection Manual Change Notice 24-0182024-07-0101 July 2024 Table of Contents for Inspection Manual Change Notice 24-018 Inspection Manual Change Notice 24-016, Table of Contents for Inspection Manual Change Notice 24-0162024-05-30030 May 2024 Table of Contents for Inspection Manual Change Notice 24-016 Inspection Manual Change Notice 24-015, Table of Contents for Inspection Manual Change Notice 24-0152024-05-16016 May 2024 Table of Contents for Inspection Manual Change Notice 24-015 ML24044A2152024-05-10010 May 2024 IMC 0306 Planning, Scheduling, Tracking, and Reporting of the Reactor Oversight Process (ROP) Inspection Manual Change Notice 24-014, Table of Contents for Inspection Manual Change Notice 24-0142024-05-10010 May 2024 Table of Contents for Inspection Manual Change Notice 24-014 ML24033A2992024-04-23023 April 2024 IMC 2562 Light-Water Reactor Inspection Program for Restart of Reactor Facilities Following Permanent Cessation of Power Operations Inspection Manual Change Notice 24-013, Table of Contents for Inspection Manual Change Notice 24-0132024-04-23023 April 2024 Table of Contents for Inspection Manual Change Notice 24-013 Inspection Manual Change Notice 24-012, Table of Contents for Inspection Manual Change Notice 24-0122024-04-22022 April 2024 Table of Contents for Inspection Manual Change Notice 24-012 Inspection Manual Change Notice 24-010, Table of Contents for Inspection Manual Change Notice 24-0102024-03-14014 March 2024 Table of Contents for Inspection Manual Change Notice 24-010 Inspection Manual Change Notice 24-009, Table of Contents for Inspection Manual Change Notice 24-0092024-03-0808 March 2024 Table of Contents for Inspection Manual Change Notice 24-009 Inspection Manual Change Notice 24-008, Table of Contents for Inspection Manual Change Notice 24-0082024-03-0404 March 2024 Table of Contents for Inspection Manual Change Notice 24-008 Inspection Manual Change Notice 24-007, Table of Contents for Inspection Manual Change Notice 24-0072024-02-12012 February 2024 Table of Contents for Inspection Manual Change Notice 24-007 Inspection Manual Change Notice 24-005, Table of Contents for Inspection Manual Change Notice 24-0052024-02-0707 February 2024 Table of Contents for Inspection Manual Change Notice 24-005 Inspection Manual Change Notice 24-006, Table of Contents for Inspection Manual Change Notice 24-0062024-02-0707 February 2024 Table of Contents for Inspection Manual Change Notice 24-006 ML23318A2002024-01-0909 January 2024 IMC 0307 Appendix D, Resident Inspector Retention and Recruitment Program Monitoring and Assessment Inspection Manual Change Notice 24-002, Table of Contents for Inspection Manual Change Notice 24-0022024-01-0909 January 2024 Table of Contents for Inspection Manual Change Notice 24-002 ML23307A0092024-01-0202 January 2024 IMC 2515 Appendix E, Inspection Program Modifications During Public Health Emergencies or Other Conditions Restricting Inspector Onsite Presence Inspection Manual Change Notice 24-001, Table of Contents for Inspection Manual Change Notice 24-0012024-01-0202 January 2024 Table of Contents for Inspection Manual Change Notice 24-001 Inspection Manual Change Notice 23-039, Table of Contents for Inspection Manual Change Notice 23-0392023-12-21021 December 2023 Table of Contents for Inspection Manual Change Notice 23-039 Inspection Manual Change Notice 23-037, Table of Contents for Inspection Manual Change Notice 23-0372023-12-15015 December 2023 Table of Contents for Inspection Manual Change Notice 23-037 ML23318A4262023-12-15015 December 2023 IP 71111.21N.04 Age-Related Degradation ML23234A1762023-12-14014 December 2023 IMC 0309 Reactive Inspection Decision Basis for Power Reactors Inspection Manual Change Notice 23-035, Table of Contents for Inspection Manual Change Notice 23-0352023-12-0606 December 2023 Table of Contents for Inspection Manual Change Notice 23-035 Inspection Manual Change Notice 23-034, Table of Contents for Inspection Manual Change Notice 23-0342023-11-15015 November 2023 Table of Contents for Inspection Manual Change Notice 23-034 Inspection Manual Change Notice 23-033, Table of Contents for Inspection Manual Change Notice 23-0332023-11-0606 November 2023 Table of Contents for Inspection Manual Change Notice 23-033 ML23214A3822023-10-31031 October 2023 IMC 0308, Attachment 2, Technical Basis for Inspection Program ML23222A1682023-10-31031 October 2023 IMC 0611 Appendix D Guidance for Problem Identification and Resolution Inspection Reports Inspection Manual Change Notice 23-032, Table of Contents for Inspection Manual Change Notice 23-0322023-10-31031 October 2023 Table of Contents for Inspection Manual Change Notice 23-032 ML23226A2232023-10-16016 October 2023 IP 71111.08 Inservice Inspection Activities Inspection Manual Change Notice 23-030, Table of Contents for Inspection Manual Change Notice 23-0302023-10-16016 October 2023 Table of Contents for Inspection Manual Change Notice 23-030 Inspection Manual Change Notice 23-028, Table of Contents for Inspection Manual Change Notice 23-0282023-09-19019 September 2023 Table of Contents for Inspection Manual Change Notice 23-028 Inspection Manual Change Notice 23-026, Table of Contents for Inspection Manual Change Notice 23-0262023-08-28028 August 2023 Table of Contents for Inspection Manual Change Notice 23-026 ML23191A5172023-08-18018 August 2023 IP 71111.07 Heat Exchanger/Sink Performance Inspection Manual Change Notice 23-024, Table of Contents for Inspection Manual Change Notice 23-0242023-08-17017 August 2023 Table of Contents for Inspection Manual Change Notice 23-024 Inspection Manual Change Notice 23-023, Table of Contents for Inspection Manual Change Notice 23-0232023-08-11011 August 2023 Table of Contents for Inspection Manual Change Notice 23-023 Inspection Manual Change Notice 23-021, Table of Contents for Inspection Manual Change Notice 23-0212023-07-27027 July 2023 Table of Contents for Inspection Manual Change Notice 23-021 Inspection Manual Change Notice 23-020, Table of Contents for Inspection Manual Change Notice 23-0202023-07-14014 July 2023 Table of Contents for Inspection Manual Change Notice 23-020 ML23192A8372023-07-12012 July 2023 IP 71111.21N.04 Age-Related Degradation ML23151A5462023-06-26026 June 2023 IMC 2515 Appendix C, Special and Infrequently Performed Inspections Inspection Manual Change Notice 23-018, Table of Contents for Inspection Manual Change Notice 23-0182023-06-26026 June 2023 Table of Contents for Inspection Manual Change Notice 23-018 ML23055B0532023-06-26026 June 2023 IMC 2515 Appendix E, Inspection Program Modifications During Public Health Emergencies or Other Conditions Restricting Inspector Onsite Presence 2024-07-29
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
NRC INSPECTION MANUAL DI
PART 9900: TECHNICAL GUIDANCE ASMEXIB.TG AMERICAN SOCIETY OF MECHANICAL ENGINEERS ASME, SECTION XI
A. PURPOSE To provide guidance on testing normally closed check valves specified in paragraph IWV-3520 of the ASME Code Section XI, 1983 Edition, as provided by an NRR memorandum dated April 18, 1985.
B. BACKGROUND There is no apparent requirement in Section XI of the ASME Code to verify closure of normally closed check valves that are classified Category C according to Subsection IWV. The majority of safety-related check valves are Category C valves. During evaluations of licensing actions related to pump and valve inservice inspection (ISI) programs, it was generally found that periodic closure testing is done only for containment isolation check valves and check valves that protect low pressure systems outside containment from reactor pressure. Consequently, Category C check valves could in many cases have the valve internals entirely missing and yet pass all preoperational and periodic tests now normally done.
In response to a Region III request, NRR has provided the following guidance concerning check valve testing.
C. DISCUSSION Region III made a statement to NRR that verification of the closure function of normally closed check valves is a generic safety concern to the extent that surveillance testing is usually not performed after plant construction to reverify the closure function. Guidance was requested for testing of normally closed check valves for (1) closure capability during preoperational testing and (2) closure capability during plant life.
The NRR position was that normally closed check valves, that have a safety function in the closed position, other than containment isolation valves (CIVs) and pressure isolation valv es (PIVs), should have the closure function verified both during preoperational
Issue Date: 05/12/86 9900 ASME Section XI testing and periodically throughout the plant life. In NRR's normal review of the inservice testing (IST) programs, whenever a valve of this type is identified, NRR verifies that closure verification testing is specified in the IST program, and if not, NRR either requires that the program
9900 ASME Section XI Issue Date: 05/12/86 be revised to so specify or NRR specifies in the IST SER that closure testing must be performed.
Even though that is the position that NRR has been implementing, NRR does believe that there is some ambiguity within ASME Section XI regarding closure verification testing of normally closed check valves. Check valve testing is specified in paragraph IWV-3520 of the 1983 Edition of Section XI. Paragraph IWV-3522, "Exercising Procedure," requires that check valves be periodically exercised to the position required to fulfill their function. Testing intervals required vary from a minimum of every three months to each cold shutdown (Earlier editions of Section XI are essentially the same).
The Code ambiguity arises from the fact that paragraph IWV-3522(b),
"Normally Closed Valves" discusses in detail the performance of tests for periodic verification of the valve opening function but does not specifically mention periodic closure verification tests.
In an attempt to have AS ME clarify the ambiguity in the Code paragraphs, NRR submitted a related inquiry to the ASME society; however, the response to the inquiry was inconclusive. The NRR inquiry was written in broad terms to cover both check and gate valves used in applic ations where the valve disk in the closed position was essential to the fulfillment of the valve's safety-related function. The inquiry asked whether such valves should be categorized as A or AC and leak tested in accordance with paragraph IWV-3420.
If the ASME response was "no" to the A or AC categorization and leak tests, it was hoped that the reply would confirm that the intent of IWV-3522 for check valves and IWV-3412 for gate valves was that some kind of closure verification test was to be performed. However, the response that was received concentrated on the categorization aspect of the inquiry and simply stated that categorization is the Owner's (licensee's) responsibility.
Nevertheless, NRR personnel that participate in ASME Section XI standards writing activities were present at some of the meetings when the inquiry was discussed. The impression re ceived at the meetings was that the intent of the Code for check valves and gate valves was that periodic verification of closure function is required for valves, whether normally open or closed, if they perform a safety function in the closed position. Verification also would be required during preoperational testing by paragraph IWV-3100, "Preservice Tests," which requires that all tests to be performed periodically during plant life per I WV-3000 also be performed after installation and prior to service.
One additional item that supports the requirement for periodic closure verification testing is that the latest draft of ANSI/ASME OM-10, "Inservice Testing of Valves," specifically requires that check valves be exercised or examined in a manner which verifies obturator travel to the closed, fully open, or partially open position required to fulfill its function. ANSI/ASME OM-10 is expected to be an eventual replacement for subsection IWV of ASME Section XI.
Issue Date: 05/12/86 9900 ASME Section XI D. CONCLUSION
The NRR position is that normally closed check valves, that have a safety function in the closed position, should have the closure function verified both during preoperational testing and periodically throughout the plant life.
E. REFERENCE The guidance provided in this direc tive was extracted from a memorandum from Hugh L. Thompson, Jr., Director, Division of Licensing, NRR, for Richard L. Spessard, Di rector, Division of Reactor Safety, Region III, dated April 18, 1985, subject: Closure Verification of Normally Closed Check Valves During Preoperational Testing at Callaway (TIA 83-117). The complete memorandum is in the Document Control System (DCS microfiche #67820-200).
END
9900 ASME Section XI Issue Date: 05/12/86