ML24046A257

From kanterella
Jump to navigation Jump to search
International, HI-STORM 100 Amendment 18 RAI Clarifications
ML24046A257
Person / Time
Site: Holtec
Issue date: 02/15/2024
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML24046A254 List:
References
5014978
Download: ML24046A257 (1)


Text

Attachment 2 to Holtec Letter 5014978 HI-STORM 100 Amd. 18 - Second Round RAI Clarifications Page 1 of 1

[

PROPRIETARY INFORMATION WITHHELD PER 10CFR2.390

]

RAI 8-1 (public): Provide updates to all references to the Holtec Report No. HI-2200343-A Topical Report.

Based on the resubmission of the Holtec Report No. HI-2200343-A Topical Report (TR) entitled, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems, ADAMS Package No. ML23338A300, all references to the TR in the technical specifications (TS) should be updated. An example includes, but is not limited to, TS Table 3-1a, note 9.

This information is needed to determine compliance with 10 CFR 72.236(b).

Holtec Response: Appendices A and B are revised to refer to Holtec Report No. HI-2200343-A.