February 2, 2024 LICENSEE:

Nebraska Public Power District FACILITY:

Cooper Nuclear Station

SUBJECT:

SUMMARY

OF DECEMBER 13, 2023, PRE-APPLICATION TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS LICENSE AMENDMENT TO ADJUST HIGH PRESSURE COOLANT INJECTION FLOW SETPOINTS FOR COOPER NUCLEAR STATION (EPID L-2023-LRM-0107)

On December 13, 2023, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Nebraska Public Power District (the licensee) via teleconference. The purpose of this meeting was to discuss the licensee's planned license amendment request (LAR) concerning a proposed change to Technical Specification (TS) table 3.3.5.1-1, Function 3.f, High Pressure Coolant Injection Pump Discharge Flow-Low (Bypass), allowable value for Cooper Nuclear Station. The meeting notice and agenda, dated December 4, 2023 are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23338A001. Enclosed is a list of attendees at the meeting.

The licensee presented information (ML23317A203) discussing the planned LAR. The licensees presentation detailed the proposed change and summarized the necessary reasons for the requested change. This meeting was mainly detailing the licensees plans to replace differential pressure indicating switch (DPIS) from Barton model 298A to Barton model 581A.

This change in the DPIS causes change in the licensees calculation model resulting in the proposed LAR.

The NRC staff queried the licensee throughout the presentation to enhance its understanding of the planned LAR, including the following:

1. The NRC staff asked the licensee to state if their setpoint methodology was an approved methodology. The licensee stated they will include information on its Setpoint Methodology in their submittal.
2. The NRC staff asked for the licensee to include their calculations for the new setpoint with their summary results when submitted. The licensee agreed to do so.
3. The NRC staff asked if this change to the setpoint value was solely prompted by the change in the Barton gauge model being used. The licensee stated that the change in the model, and due to its lower repeatability value, altered the calculated low-flow setpoint and acceptance value, thus requiring the change.

No regulatory decisions were made as a result of this teleconference. No Members of the public identified themselves on the teleconference. No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-3719, or by email at Thomas.Byrd@nrc.gov.

/RA/

Thomas Byrd, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

List of Attendees cc: Listserv

Enclosure LIST OF ATTENDEES DECEMBER 13, 2023, PRE-APPLICATION TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST TO REVISE TS TABLE 3.3.5.1-1, FUNCTION 3.F COOPER NUCLEAR STATION U.S. Nuclear Regulatory Commission Thomas Byrd NRR1/DORL2/LPL43/PM4 Jennie Rankin NRR/DORL/LPL4/Branch Chief Adakou Foli NRR/DEX5/EEEB6/Electrical Engineer Joseph Ashcraft NRR/DEX/EICB7/Electronics Engineer Matthew Hamm NRR/DSS8/STSB9/Safety and Plant Systems Engineer Summer Sun NRR/SNSB10/Senior Nuclear Engineer Kent Chambliss RGN IV11/DORS12/PBC13/SRI14 Cooper Nuclear Station Nebraska Public Power District Linda Dewhirst Regulatory Affairs Manager Dave Van Der Kamp Licensing Technical Specialist Eric Nelson Design Engineering Manager Alan Able Instrumentation and Controls Engineering Supervisor Ryan Durr Instrumentation and Controls Engineer Public None 1Office of Nuclear Reactor Regulation (NRR) 2Division of Operating Reactor Licensing (DORL) 3Plant Licensing Branch IV (LPL IV) 4Project Manager (PM) 5Division of Engineering and External Hazards (DEX) 6 Electrical Engineering Branch (EEEB) 7 Instrumentation and Controls Branch (EICB) 8 Division of Safety Systems (DSS) 9Technical Specifications Branch (STSB) 10Nuclear Systems, Performance Branch (SNSB) 11Region 4 (RGN IV) 12Division of Reactor Safety (DORS) 13Branch C (PBC) 14Senior Resident Inspector (SRI)

Meeting Notice: ML23338A001 Meeting Summary: ML24016A077 Meeting Slides: ML23317A203

  • by email OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA*

NRR/DEX/EEEB/BC*

NRR/DSS/STSB/BC(A)*

NAME TByrd PBlechman WMorton SMehta DATE 12/14/2023 1/17/2024 01/29/2023 01/29/2024 OFFICE NRR/DSS/SNSB NRR/DEX/EICB/BC*

NRR/DORL/LPL4/BC*

NRR/DORL/LPL4/PM*

NAME PSahd FSacko JRankin TByrd DATE 01/28/2024 01/29/2024 02/02/2024 02/02/2024