L-2024-002 10 CFR 55a(z)(2)
January 08, 2024 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D C 20555-0001 RE:
St. Lucie Nuclear Plant, Unit 2 Docket No. 50-389 Renewed Facility Operating License NPF-16 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME)
Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump
Reference:
- 1.
Florida Power & Light letter L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump. July 26, 2023 (ADAMS Accession No. ML23208A057)
- 2.
Response to Request for Additional Information Regarding Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME)
Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump, October 26, 2023 (ADAMS Accession No. ML23300A003 In Reference 1, Florida Power & Light Company (FPL) requested for St Lucie Nuclear Plant (St. Lucie) Unit 2, an alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM)
Code 2004/2006a, Subsection ISTB-6300, Systematic Error. The proposed alternative would provide on a one-time basis, relief from the ASME OM ISTB-6300 requirement to conduct a retest of the Auxiliary Feedwater (AFW) 2C Pump until plant conditions were appropriate to support a comprehensive pump test in accordance with ASME OM ISTB-3400. The requested relief followed the discovery of a test instrument employed during the prior AFW 2C pump comprehensive test that was subsequently determined to be outside the allowable calibration tolerance.
In Reference 2, FPL provided additional information deemed necessary to complete the NRCs review.
By this letter, FPL hereby withdraws Pump Relief Request 10 (PR-10) for St Lucie Unit 2. The withdrawal follows the satisfactory completion of an AFW 2C Pump comprehensive test on December 18, 2023.
Should you have any questions regarding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at 561-904-3635.
This letter contains no new or modified regulatory commitments.
Sincerely, Dianne Strand General Manager, Regulatory Affairs Florida Power & Light Company cc: