ML24008A099
From kanterella
Jump to navigation
Jump to search
Date released: 02/02/2024 | Download: ML24008A099 |
---|---|
Letter Sequence Request | |
---|---|
EPID:L-2023-CPS-0000, Us Fish and Wildlife Service Concurrence: Kairos Power, LLC Hermes Reactor at DOE Orr Ettp (Heritage Center) (Approved, Closed) | |
Initiation Administration Questions
Results Other: ML23268A446, ML23269A176, ML23276B399, ML23311A195, ML24024A226, ML24033A181, ML24043A217, ML24046A173, ML24057A387, ML24103A176, ML24103A178, ML24135A260, ML24135A263, ML24193A214, ML24193A244 | |
MONTHYEARML23036A0042023-01-27027 January 2023
[Table View]Us Fish and Wildlife Service Concurrence: Kairos Power, LLC Hermes Reactor at DOE Orr Ettp (Heritage Center) Project stage: Request ML23089A3862023-03-30030 March 2023, 31 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 Project stage: Request ML23075A1792023-05-0909 May 2023 International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI Project stage: Request ML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23178A0962023-06-23023 June 2023 Kairos Power, LLC - Supplemental Information for Environmental Report Project stage: Request ML23181A0422023-07-0606 July 2023 June 6 and 14, 2023 Summary of the Closed Meetings with Kairos Power Regarding Section 106 Consultations Project stage: Request ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit Project stage: Request ML23268A4462023-10-0303 October 2023 Hermes 2 General Audit Plan Project stage: Other ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan Project stage: Other ML23269A1762023-10-11011 October 2023 Kairos Hermes 2 Construction Permit Application Scheduling and Resource Letter Project stage: Other NUREG-2263, Official Exhibit - NRC-008-MA-CM01 - NUREG-2263, Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor (August 17, 2023)2023-10-12012 October 2023 Official Exhibit - NRC-008-MA-CM01 - NUREG-2263, Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor (August 17, 2023) Project stage: Request ML23304A2192023-10-31031 October 2023 Joint Proposed Transcript Corrections Project stage: Request ML23311A1952023-11-17017 November 2023 FRN: General Notice. Kairos Power LLC Hermes 2- Construction Permit Application; Opportunity to Request a Hearing and Petition for Leave to Intervene Project stage: Other ML23356A0782023-12-22022 December 2023 Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 Project stage: Other ML24008A0992024-01-31031 January 2024 Letter to Achp - Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Proposed Non-Power Test Reactors (Hermes 2) Construction Permit Project stage: Request ML24008A1482024-01-31031 January 2024 Letter to SHPO - Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Proposed Non-Power Test Reactors (Hermes 2) Construction Permit Project stage: Request ML24009A1072024-02-0202 February 2024 Kairos Hermes 2 CP Review - Request to Initiate Section 106 Consultation Project stage: Request ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Project stage: Other ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 Project stage: Other ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 Project stage: Other ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 Project stage: Other ML24065A1002024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report Project stage: Request ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR Project stage: Other ML24103A2432024-04-12012 April 2024 Kairos Power, LLC, Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 Project stage: Request ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 Project stage: Request ML24103A0022024-04-30030 April 2024 Environmental Assessment and Finding of No Significant Impact for the Construction Permits for the Kairos Hermes 2 Test Reactors: Draft for Comment Project stage: Request ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24138A2142024-05-16016 May 2024 Enclosure 2: Supplemental Information on Rupture Disk Design Code Evaluation (non-proprietary) Project stage: Request ML24144A0922024-05-23023 May 2024 Enclosure 1: Hermes 2 Preliminary Safety Analysis Report Project stage: Request ML24144A0942024-05-23023 May 2024 Enclosure 3: KP-TR-022-NP Hermes 2 Postulated Event Methodology Revision 1 Project stage: Request ML24193A2142024-07-11011 July 2024 Summary Report for the Regulatory Audit of the Kairos Power Hermes 2 Preliminary Safety Analysis Report - General Audit Project stage: Other ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24200A1152024-07-19019 July 2024 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes 2 Non-power Test Reactor Facility Project stage: Approval ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation Project stage: Approval 2023-09-11 |
ML24008A113 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 01/31/2024 |
From: | Doub J NRC/NMSS/DREFS |
To: | Nelson R US Advisory Council On Historic Preservation |
References | |
Download: ML24008A113 | |
Retrieved from "https://kanterella.com/w/index.php?title=ML24008A099&oldid=3651846"