ML23354A094

From kanterella
Jump to navigation Jump to search
Paragon Energy Solutions - 10CFR Part 21 Initial Notification: P21-12182023-IN, Rev. 0 - Defect with Detroit Diesel/Mtu Fuel Injectors Pn R5229660 Cat Id 0001390618
ML23354A094
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/19/2023
From: Knott R
Paragon Energy Solutions
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23354A094 (1)


Text

~A Paragon Date: 12/19/2023 To: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 10CFR Part 21 Initial Notification: P21-12182023-IN, Rev. 0

Subject:

Defect with Detroit Diesel/MTU Fuel Injectors PN R5229660 Cat ID# 0001390618 Paragon has identified a defect in the subject fuel injectors supplied as identified below.

Plant Client PO# Project Serial # QTY Number Braidwood 01389979 PR23000356 2302008, 16 2304001 thru 2304015 Byron 01384756 PR23000189 2302001 thru 2302016

  • 16
  • SN 2302008 was ultimately installed at Braidwood Pursuant to 10CFR Part 21 § 21.21(d)(3)(i) Paragon is providing initial notification of a defect associated with the Auxiliary Feedwater Pump Diesel Engine fuel injectors supplied to Constellation as noted in the table above. The injectors were provided to Paragon for refurbishment in accordance with the customer purchase orders referenced above. On November 17, 2023, Constellation provided Paragon with Constellation/Braidwood Root Cause Report associated with Issue Report # 4703982 and the associated failure analysis report documenting potential defects with some fuel injectors supplied to Braidwood. The deficiencies reported allowed excessive fuel oil leakage which resulted in diesel lubricating oil system contamination above specified limits. On December 18, 2023, Paragon concluded our evaluation which determined this condition if left uncorrected could contribute to a substantial safety hazard and is reportable in accordance with 10CFR Part 21.

The extent of condition is limited to the Constellation Braidwood and Byron plants.

Paragon has entered this condition in our corrective action program. Affected injectors from PO 01389979 have been removed from service and returned to Paragon. Paragon is coordinating with Byron on recommended actions and will follow up with our final notification on or before 1/17/2024.

Date of Discovery: 12/18/2023 Sincerely, y

Richard Ri R chard Knott Vice President Quality Assurance, Paragon Energy Solutions.

Paragon Energy Solutions 7410 Pebble Drive x Fort Worth, Texas x 76118 817-284-0077 x Fax 817-590-0484