January 9, 2024 MEMORANDUM TO:
Michelle W. Hayes, Chief Licensing and Infrastructure Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM:
William (Billy) Gleaves, Senior Project Manager /RA/
Licensing and Infrastructure Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF DECEMBER 12, 2023, PREAPPLICATION MEETINGS WITH WESTINGHOUSE ELECTRIC COMPANY ON AP300 SMR WHITE PAPER #2 LOCALIZED 1E POWER SYSTEM & SAFETY On December 12, 2023, at 9:00 a.m. Eastern Time (ET), the U.S. Nuclear Regulatory Commission (NRC) held a hybrid public meeting with representatives of Westinghouse Electric Company (WEC). The purpose of the preapplication meeting was to hear WECs general description of the AP300 Small Modular Reactor (SMR) 1E power system that will be discussed in greater detail in a white paper WEC plans to submit on Localized 1E Power System &
Safety, which may include feedback from this meeting. The AP300 design is largely based on the AP1000 certified design with changes that reflect the smaller power output, lessons learned from the AP1000 construction, and a simplification of features. The public presentation slides for this meeting may be found under Agencywide Documents and Access Management System (ADAMS) Accession No. ML23340A168). The meeting was divided into two sessions; a public session followed by a proprietary session.
WEC staff presented at both the public and proprietary sessions and during the proprietary session received staff feedback on the proprietary details of their plans and general design.
Preapplication engagements, including this meeting, provide an opportunity for the NRC staff to engage in early discussions with a prospective applicant to offer licensing guidance and to identify potential licensing issues early in the licensing process. No decisions or commitments were made during the preapplication meeting.
A list of attendees at the public session is enclosed. There were approximately 20 participants remotely including NRC staff, WEC staff, and four members of the public.
CONTACT: William (Billy) Gleaves 301-415-5848
M. Hayes When the public attendees were solicited for questions of the NRC staff, no questions were proffered. The public meeting ended at 9:16 am ET. The proprietary session started at 9:20 a.m.
and closed at 10:40 a.m. ET.
Docket No. 999-02111
Enclosures:
- 1. List of Attendees
- 2. Summary of Proprietary Session cc w/encls: Listserv
Pkg: ML23354A046 Memo: ML23354A047 : ML23354A048
- via email NRR-106 OFFICE NRR/DNRL/NLIB: PM NRR/DNRL/NLIB: LA NRR/DEX/EEEB NAME BGleaves SGreen*
WMorton VGoel for DATE 12/21/2023 12/21/2023 12/27/2023 OFFICE NRR/DRO/IOLB NRR/DNRL/NLIB: BC NAME MScheetz MHayes DATE 12/21/2023 1/9/2024
U.S. NUCLEAR REGUALTORY COMMISSION
SUMMARY
OF DECEMBER 12, 2023, PUBLIC PRESUBMITTAL MEETING WITH WESTINGHOUSE ELECTRIC COMPANY ON AP300 SMR WHITE PAPER #2 LOCALIZED 1E POWER SYSTEM & SAFETY LIST OF ATTENDEES Name Organization Billy Gleaves Jordan Glisan Vijay Goel Wendell Morton John Hughey Maurin Scheetz Sheila Ray Kayleh Hartage Antonios Zoulis Calvin Cheung Reinaldo Rodriguez NRC Rachel Christian Bryan Friedman Kevin May Keegan Foster Westinghouse and Contractors Jana Bergman, Curtiss Wright Lee Grzeck, Duke Energy Mary Miller, Dominion Energy Leigh Lloveras Kris Cummings Members of the Public