Letter Sequence Request |
---|
EPID:L-2023-LLA-0175, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) (Approved, Closed) |
|
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) Project stage: Request ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation Project stage: Acceptance Review ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 Project stage: Approval CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), Project stage: Supplement ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 Project stage: Other ML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 Project stage: RAI 2024-10-04
[Table View] |
|
---|
Category:Letter type:CNL
MONTHYEARCNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-005, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2023-12-26026 December 2023 Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, – Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 – Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-24
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24247A1752024-08-28028 August 2024 Enclosure 1: Description and Assessment of the Proposed Changes ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-043, – Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 – Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22115A0022022-05-17017 May 2022 Correction to Amendment No. 350 Regarding One-Time Change to Technical Specification3.4.12, Low Temperature Overpressure Protection System, CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-02-24024 February 2022 License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-003, Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010)2022-02-17017 February 2022 Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019)2021-09-29029 September 2021 Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML21202A2242021-07-0202 July 2021 Tennessee Valley Authority (TVA)- Watts Bar Nuclear Plant (WBN)- NPDES Permit No. TN0020168-Application Request for Permit Renewal CNL-21-038, Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (W2021-06-0101 June 2021 Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (WBN CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-013, Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06)2021-03-11011 March 2021 Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06) CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as2021-03-0303 March 2021 Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05)2021-03-0202 March 2021 License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID2021-01-26026 January 2021 Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024)2020-12-23023 December 2020 Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017)2020-12-15015 December 2020 Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) CNL-20-093, Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01)2020-12-15015 December 2020 Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01) CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp CNL-20-006, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01)2020-10-0202 October 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- 2024-08-28
[Table view] Category:Technical Specification
MONTHYEARCNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22145A1412022-05-16016 May 2022 Technical Specification Bases, Manual WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) CNL-19-072, Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03)2019-07-14014 July 2019 Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03) ML19151A5842019-05-31031 May 2019 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17333A4012017-11-29029 November 2017 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-16-011, Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01)2016-03-11011 March 2016 Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days (TS-SQN-16-01) CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 82015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 ML15176A6642015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 2024-04-04
[Table view] Category:Amendment
MONTHYEARCNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML11228A0472011-08-10010 August 2011 Technical Specifications (Developmental Revision F), Enclosure 1 ML11195A1172011-07-29029 July 2011 Issuance of Amendments Regarding the Cyber Security Plan (TS-09-06) (TACs ME4955 and ME4956) ML11129A1882011-05-0606 May 2011 TS 11-06, Emergency Technical Specification Change for One-Time Extension of Surveillance Requirements Associated with Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation ML1022900752010-08-16016 August 2010 Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies ML1005504532010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.4 - Reactor Coolant System ML1005504012010-02-0202 February 2010 Developmental Revision B - Technical Specifications 1.0 - Use and Application ML1005504412010-02-0202 February 2010 Developmental Revision B - Technical Specifications 2.0 - Safety Limits ML1005504472010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.0 - Limiting Condition for Operation (LCO) Applicability ML1005503672010-02-0202 February 2010 Developmental Revision B - Technical Specifications Table of Contents ML1005504642010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.9 - Refueling Operations ML1005504562010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.5 - Emergency Core Cooling Systems ML1005504582010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.6 - Containment Systems ML1005504612010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.7 - Plant Systems ML1005504622010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.8 - Electrical Power Systems ML1005504712010-02-0202 February 2010 Developmental Revision B - Technical Specifications 4.0 - Design Features ML1005504742010-02-0202 February 2010 Developmental Revision B - Technical Specifications 5.0 - Administrative Controls ML1005504512010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.3 - Instrumentation ML1005504502010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.2 - Power Distribution Limits 2024-04-04
[Table view] |
Text
1101 Market Street, Chattanooga, Tennessee 37402
CNL-23-036
December 18, 2023
10 CFR 50.90
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Application to Revise Function 5 of Technical Specification Table 3.3.2-1, "Engineered Safety Feature Actuation System Instrumentation," for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, Tennessee Valley Authority (TVA) is submitting a request for an amendment to Renewed Facility Operating License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Facility Operating License Nos. NPF-90 and NPF-96 for the Watts Bar Nuclear Plant (WBN), Units 1 and 2, respectively.
The proposed license amendment would add the following note to SQN Units 1 and 2 and WBN Units 1 and 2 Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Table 3.3.2-1, Functions 5a and 5b, Turbine Trip and Feedwater Isolation:
Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
The proposed change also revises Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b to be consistent with Note (i) of SQN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (j) of SQN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b and the corresponding Note and Table in Westinghouse Standard TS (NUREG-1431, Revision 5.0).
The enclosure to this submittal provides a description and assessment of the proposed change, a regulatory evaluation, and a discussion of environmental considerations. provides a marked-up version of the affected TS pages of SQN Units 1 and 2 U.S. Nuclear Regulatory Commission CNL-23-036 Page 2 December 18, 2023
showing the proposed changes. Attachment 2 provides a marked-up version of the affected TS pages of WBN Units 1 and 2 showing the proposed changes. Attachment 3 provides a marked-up version of the SQN Units 1 and 2 TS Bases. Attachment 4 provides a marked-up version of the WBN Units 1 and 2 TS Bases. Changes to the existing TS Bases are provided for information only and will be implemented under the Technical Specification Bases Control Program.
TVA requests approval of the proposed license a mendment within one year from the date of this submittal with implementation within 60 days of issuance of the amendment.
TVA has determined that there are no significant hazards cons iderations associated with the proposed change and that the TS change qualifies for a categorical exclusion from environmental review pursuant to the provision s of 10 CFR 51.22(c)(9). In accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and enclosure to the Tennessee State Department of Environment and Conservation.
There are no new regulatory commitments contained in this letter. Please address any questions regarding this request to Stuart L. Rymer, Senior Manager, Fleet Licensing, at slrymer@tva.gov.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 18th day of December 2023.
Respectfully,
Kimberly D. Hulvey Director, Nuclear Regulatory Affairs
Enclosure:
Description and Assessment of the Proposed Change
cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant Director, Division of Radiological Health - Tennessee Department of Environment and Conservation Enclosure
Description and Assessment of the Proposed Change
Subject:
Application to Revise Function 5 of Technical Specification Table 3.3.2-1, "Engineered Safety Feature Actuation System Instrumentation," for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)
CONTENTS
1.0
SUMMARY
DESCRIPTION............................................................................................... 1 2.0 DETAILED DESCRIPTION................................................................................................ 1 2.1 System Design and Operation........................................................................................ 1 2.2 Reason for the Proposed Change.................................................................................. 2 2.3 Description of the Proposed Change.............................................................................. 3
3.0 TECHNICAL EVALUATION
............................................................................................... 3
4.0 REGULATORY EVALUATION
........................................................................................... 3 4.1 Applicable Regulatory Requirements and Criteria.......................................................... 3 4.2 Precedent....................................................................................................................... 4 4.3 No Significant Hazards Consideration Determination Analysis...................................... 4 4.4 Conclusion...................................................................................................................... 6
5.0 ENVIRONMENTAL CONSIDERATION
............................................................................. 6
Attachments
- 1. Proposed TS Changes (Markups) for SQN Units 1 and 2
- 2. Proposed TS Changes (Markups) for WBN Units 1 and 2
- 3. Proposed TS Bases Changes (Markups) for SQN Units 1 and 2 (For Information Onl y)
- 4. Proposed TS Bases Changes (Markup) for WBN Units 1 and 2 (For Information Only)
CNL-23-036 Enclosure
Description and Assessment of the Proposed Change
1.0
SUMMARY
DESCRIPTION
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, Tennessee Valley Authority (TVA) is submitting a request for an amendment to Renewed Facility Operating License Nos. DPR-77 and DPR-79 for Sequoyah Nuclear Plant (SQN), Units 1 and 2, and Facility Operating License Nos. NPF-90 and NPF-96 for Watts Bar Nuclear Plant (WBN), Units 1 and 2.
The proposed license amendment would add the following note to SQN Units 1 and 2 and WBN Units 1 and 2 Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation:
Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
The proposed change also revises Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b to be consistent with Note (i) of SQN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (j) of SQN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b and the corresponding Note and Table in Westinghouse Standard TS (NUREG-1431, Revision 5.0).
2.0 DETAILED DESCRIPTION
2.1 System Design and Operation
The primary functions of the Turbine Trip and Feedwater Isolation signals are to prevent damage to the turbine due to water in the steam lines, and to stop the excessive flow of feedwater into the steam generators (SGs). These functions are necessary to mitigate the effects of a high water level in the SGs, which could result in carryover of water into the steam lines and excessive cooldown of the primary system. The SG high water level is due to excessive feedwater flows.
The Turbine Trip and Feedwater Isolation Function is actuated when the level in any SG exceeds the high setpoint, and per forms the following functions:
Trips the main turbine, Trips the main feedwater (MFW) pumps, Initiates feedwater isolation, and Shuts the MFW regulating valves and the bypass feedwater regulating valves.
This function is actuated by SG Water Level - High, or by a safety injection (SI) signal. The nominal trip setpoint and allowable value limits are a percentage of the narrow range instrument span for each steam generator. The reactor trip syst em (RTS) also initiates a turbine trip signal whenever a reactor trip (P-4) is generated. In the event of SI, the unit is taken offline and the turbine generator must be tripped. The MFW system is also taken out of operation and the auxiliary feedwater (AFW) system is automatically started.
CNL-23-036 E1 of 8 Enclosure
For WBN, an additional function of the Turbine Trip and Feedwater Isolation signal is to prevent submergence of safety related equipment in the main steam valve vault (MSVV) rooms in the event of a MFW line break.
Each of the two main steam chests includes two turbine stop valves and two turbine control valves. The steam lines are cross-connected upstr eam of the turbine stop valves. The turbine provides anticipatory trips to the reactor protection system from contacts which change position when the turbine stop valves close or when the emergency trip header pressure goes below its setpoint.
For a turbine trip, the reactor would be tripped directly (unless below approximately 50% power) from a signal derived from the turbine emergency trip header pressure or the turbine stop valve position. The turbine stop valves close on loss of emergency trip header pressure actuated by one of a number of possible turbine trip signals.
2.2 Reason for the Proposed Change
SQN and WBN TS Table 3.3.2-1, Function 5 requires two trains of the Turbine Trip Function to be operable in Mode 1 and in Modes 2 to 3 [except when all MFW isolation valves, MFW regulating valves (MFRV), and MFRV bypass valv es are closed or isolated by a closed manual valve]. This function requires the four main turbine stop valves to be capable of closing within the time limit prescribed in SQN Updated Final Safety Analysis Report (UFSAR) Table 7.3.1-4, Engineered Safety Features Response Times, and the WBN Units 1 and 2 Technical Requirements Manuals Table 3.3.2-1, Engineered Safety Actuations System Response Times.
However, SQN and WBN TS 3.3.2 does not provide any specific condition/action for the turbine stop valves. Therefore, if one or more of the turbine stop valves is inoperable (e.g., fails to meet the required closure time while in Mode 1 during a pre-planned turbine trip as part of normal startup sequence), then both trains of the Turbine Trip Function must be declared inoperable, which requires entry into SQN and WBN TS Limiting Condition for Operation (LCO) 3.0.3 due to two trains inoperable with no applicable TS required action.
However, entry into LCO 3.0.3 is unnecessary if the turbine stop valves or governor valves are already closed (in the required turbine trip condition) and are incapable of opening (i.e., turbine tripped). With the proposed change to SQN and WBN TS Table 3.3.2-1, Function 5, during startup testing if a valve were to fail its time response testing, but was closed with the turbine tripped, entry into 3.0.3 would not be required. This would preclude an unnecessary mode change that could challenge plant equipment and burden the operating crews.
The proposed changes to Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b are administrative in nature in that they are consistent with Note (i) of SQN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (j) of SQN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b and Note (k) of TS Table 3.3.2-1, Functions 5a and 5b of the Westinghouse Standard TS (NUREG-1431, Revision 5.0). The proposed changes do not change the technical content of Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b. The current verbiage of Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b is the same as the initial issuance of the WBN Unit 1 TS (NRC Accession Number ML052930169) and the WBN Unit 2 TS (NRC Accession Number ML15251A587).
CNL-23-036 E2 of 8 Enclosure
2.3 Description of the Proposed Change
The proposed license amendment would add the following note to SQN Units 1 and 2 and WBN Units 1 and 2 TS 3.3.2, Table 3.3.2-1, Functions 5a and 5b for Modes 1, 2, and 3:
Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
The remaining footnotes in TS 3.3.2, Table 3.3.2-1 are renumbered accordingly.
The proposed license amendment also revises Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b as follows:
Except when all MFIVs, MFRVs, and MFRV bypass valves are closed or isolated by a closed manual valve.
provides a marked-up version of the affected TS pages of SQN Units 1 and 2 showing the proposed changes. Attachment 2 provides a marked-up version of the affected TS pages of WBN Units 1 and 2 showing the proposed changes. Attachment 3 provides a marked-up version of the SQN Units 1 and 2 TS Bases. Attachment 4 provides a marked-up version of the WBN Units 1 and 2 TS Bases. Changes to the existing TS Bases are provided for information only and will be implemented under the Technical Specification Bases Control Program.
3.0 TECHNICAL EVALUATION
A turbine trip signal into the digital electric hydraulics (DEH) system (Figures 1 and 2) must be present for the turbine stop and governor valves to be closed and incapable of opening. While the turbine is in the tripped state the trip block solenoid valves will de-energize and remain open removing hydraulic fluid pressure needed for valve movement. The trip block solenoid valves will energize only when all turbine trips are clear and the turbine is latched. These actions will allow system pressure to build therefore enabling valve movement when demand is present.
Therefore, the proposed change provides an adequate level of safety for the change.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements and Criteria
General Design Criteria
SQN Units 1 and 2 were designed to meet the intent of the "Proposed General Design Criteria (GDC) for Nuclear Power Plant Construction Permits published in July 1967. The Sequoyah construction permit was issued in May 1970. The Updated Final Safety Analysis Report (UFSAR), however, addresses the NRC General Design Criteria (GDC) published as Appendix A to 10 CFR 50 in July 1971.
WBN Units 1 and 2 were designed to meet the intent of the "Proposed General Design Criteria for Nuclear Power Plant Construction Permits" published in July 1967. The WBN construction permit was issued in January 1973. The dual-unit UFSAR, however, addresses the Nuclear Regulatory Commission GDC published as Appendix A to 10 CFR 50 in July 1971.
CNL-23-036 E3 of 8 Enclosure
Each criterion listed below is followed by a discussion of the design features and procedures that meet the intent of the criteria.
Criterion 13 - Instrumentation and Control. Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems. Appropriate controls shall be provided to maintain these variables and systems within prescribed operating ranges.
Compliance
The proposed change will continue to provide monitoring of the Turbine Trip and Feedwater Isolation Function. No changes are proposed to the safety-related instrumentation (i.e., engineered safety features actuation system). Further compliance with GDC 13 is provided in SQN UFSAR Section 3.1.2 and WBN UFSAR Section 3.1.2.2.
Criterion 20 through 29, "Protection and Reactivity Control Systems," provides the expectations for protection systems associated with reactor operation.
Compliance
The proposed change does not alter the ability for the reactor trip functions to actuate. The proposed change is consistent with the SQN and WBN design and analysis and ensures proper actuation to satisfy the anticipatory trip function. Therefore, the recommendations of these GDC continue to be met with the proposed change. Further compliance with GDC 20 through 29 is provided in SQN UFSAR Section 3.1.2 and WBN UFSAR Section 3.1.2.3.
4.2 Precedent
There is no precedent for the proposed change.
4.3 No Significant Hazards Consideration Determination Analysis
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, Tennessee Valley Authority (TVA) is submitting a request for an amendment to Renewed Facility Operating License Nos. DPR-77 and DPR-79 for Sequoyah Nuclear Plant (SQN), Units 1 and 2, and Facility Operating License Nos. NPF-90 and NPF-96 for Watts Bar Nuclear Plant (WBN), Units 1 and 2.
The proposed license amendment would add the following note to SQN Units 1 and 2 and WBN Units 1 and 2 Technical Specification (TS) 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation:
Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
The proposed change also revises Note (f) of WBN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (h) of WBN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b to be consistent with
CNL-23-036 E4 of 8 Enclosure
Note (i) of SQN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (j) of SQN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b and the corresponding Note and Table in Westinghouse Standard TS (NUREG-1431, Revision 5.0).
TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendments by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below.
- 1. Does the proposed amendment involve a significant increase in the probability or consequence of an accident previously evaluated?
Response: No
The proposed change will not alter any plant components, systems, or processes and will provide a more appropriate value to assess operability of the associated pressure switches. Because the plant features and operating practices are not altered, the probability of an accident is not affected. This trip function is not directly credited in the SQN and WBN accident analysis. There is not a specific safety limit associated with the Turbine Trip and Feedwater Isolation function; therefore, the proposed change will not impact any previously evaluated design basis accidents.
The proposed change will continue to provide an acceptable anticipatory trip signal, and the offsite dose potential is not affected by this change.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change will not alter any plant equipment or operating practices that could create the possibility of a new or different kind of accident. The proposed change reflects that the turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening. This type of function does not have the ability to create an accident as its purpose and function is to mitigate events.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed change adds a note to SQN Units 1 and 2 and WBN Units 1 and 2 TS 3.3.2, Function 5 to indicate that the turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
The proposed change does not alter the ability of this trip function to operate when and as needed to mitigate accident conditions.
CNL-23-036 E5 of 8 Enclosure
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, TVA concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
4.4 Conclusion
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the elig ibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
CNL-23-036 E6 of 8 Enclosure
Figure 1
CNL-23-036 E7 of 8 Enclosure
Figure 2
CNL-23-036 E8 of 8 Enclosure
Attachment 1
Proposed Technical Specification Changes (Mark-Up) for SQN Units 1 and 2
CNL 036 ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page 4 of 9)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 5. Turbine Trip and Feedwater Isolation
- a. Automatic 1(j), 2(i)(j),3(i)(j) 2 trains H SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
- b. SG Water Level -1(j),2(i)(j),3(i)(j) 3 per SG D SR 3.3.2.1 81.7% 81%
High High (P-14) SR 3.3.2.4(b)(c)
SR 3.3.2.8(b)(c)
SR 3.3.2.9
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
- 6. Auxiliary Feedwater
- a. Automatic 1,2,3 2 trains H SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
(b) If the as-found channel setpoint is outside its predefined as -found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.
(c) The instrument channel setpoin t shall be reset to a value that is within the as -left tolerance around the Nominal Trip Setpoint (NTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the NTSP are acceptable pro vided that the as -found and as -left tolerances apply to the actual setpoint implemented in the Surveillance procedures (field setting) to confirm channel performance. The methodologies used to determine the as -found and as -left tolerances are specified in UFSAR, Section 7.1.2.
(i) Except when all MFIVs, MFRVs, and MFRV bypass valves are closed or isolated by a closed manual valve.
(j) Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
SEQUOYAH - UNIT 1 3.3.2-14 Amendment 334, ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page 7 of 9)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 6. Auxiliary Feedwater
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
- d. Loss of Offsite Power
(1) Voltage Sensors 1,2,3 3 per L,M SR 3.3.2.6 Refer to Function 1 of Table shutdown SR 3.3.2.8(b)(c) 3.3.5-1 for setpoints and board (jk) SR 3.3.2.9 allowable values.
(2) Load Shed Timer 1,2,3 1 per M SR 3.3.2.8(b)(c) Refer to Function 1 of Table shutdown SR 3.3.2.9 3.3.5-1 for setpoints and board(jk) allowable values.
- e. Trip of all Main 1,2(kl) 1 per N SR 3.3.2.7 NA NA Feedwater pump SR 3.3.2.9 Pumps
- f. Auxiliary1,2,3 3 per P SR 3.3.2.8(b)(c) 2.44 psig 3.21 psig Feedwater Pump pump (motor driven (motor driven Suction Transfer pump) pump) on Suction 12 psig 13.9 psig Pressure - Low (turbine driven (turbine driven pump) pump)
(b) If the as-found channel setpoint is outside its predefined as -found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.
(c) The instrument channel setpoint shall be reset to a value that is within the as -left tolerance around the Nominal Trip Setpoint (NTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the NTSP are acceptable provided that the as -found and as -left tolerances apply to the actual setpoint implemented in the Surveillance procedures (field setting) to confirm channel performance. The methodologies used to determine the as -found and as -left tolerances are specified in UFSAR, Section 7.1.2.
(jk ) Unit 1 shutdown boards only.
(kl ) When one or more Main Feedwat er Pump(s) are supplying feedwater to steam generators.
SEQUOYAH - UNIT 1 3.3.2-17 Amendment 334, 358, ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page 4 of 9)
Engineered Safe ty Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 5. Turbine Trip and Feedwater Isolation
- a. Automatic 1(j), 2(i)(j),3(i)(j) 2 trains H SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
- b. SG Water Level -1(j),2(i)(j),3(i)(j) 3 per SG D SR 3.3.2.1 81.7% 81%
High High (P-14) SR 3.3.2.4(b)(c)
SR 3.3.2.8(b)(c)
SR 3.3.2.9
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
- 6. Auxiliary Feedwater
- a. Automatic 1,2,3 2 trains H SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
(b) If the as-found channel setpoint is outside its predefined as -found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.
(c) The instrument channel setpoint shall be reset to a value that is within the as -left tolerance around the Nominal Trip Setpoint (NTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the NTSP are acceptabl e provided that the as -found and as -left tolerances apply to the actual setpoint implemented in the Surveillance procedures (field setting) to confirm channel performance. The methodologies used to determine the as -found and as -left tolerances are specifi ed i n UFSAR, Section 7.1.2.
(i) Except when all MFIVs, MFRVs, and MFRV bypass valves are closed or isolated by a closed manual valve.
(j) Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
SEQUOYAH - UNIT 2 3.3.2-14 Amendment 327, ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page 7 of 9)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 6. Auxiliary Feedwater
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
- d. Loss of Offsite Power
(1) Voltage Sensors 1,2,3 3 per L,M SR 3.3.2.6 Refer to Function 1 of Table shutdown SR 3.3.2.8(b)(c) 3.3.5-1 for setpoints and board(jk) SR 3.3.2.9 allowable values.
(2) Load Shed Timer 1,2,3 1 per M SR 3.3.2.8(b)(c) Refer to Function 1 of Table shutdown SR 3.3.2.9 3.3.5-1 for setpoints and board(jk) allowable values.
- e. Trip of all Main 1,2(kl) 1 per N SR 3.3.2.7 NA NA Feedwater pump SR 3.3.2.9 Pumps
- f. Auxiliary1,2,3 3 per P SR 3.3.2.8(b)(c) 2.44 psig 3.21 psig Feedwater Pump pump (motor driven (motor driven Suction Transfer pump) pump) on Suction 12 psig 13.9 psig Pressure - Low (turbine driven (turbine driven pump) pump)
(b) If the as-found channel setpoint is outside its predefined as -fo und tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.
(c) The instrument channel setpoint shall be reset to a value that is within the as -left tolerance around the Nominal Trip Setpoint (NTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the NTSP are acceptable provided that the as -found and as -left tolerances apply to the actual setpoint implemented in the Surveillance procedures (field setting) to confirm channel performance. The methodologies used to determine the as -found and as -le ft tolerances are specified in U FSAR, Section 7.1.2.
(j k) Unit 2 shutdown boards only.
(k l) When one or more M ain Feedwater Pump(s) are supplying feedwater to steam generators.
SEQUOYAH - UNIT 2 3.3.2-17 Amendment 327, 352, Enclosure
Attachment 2
Proposed Technical Specification Changes (Mark-Up) for WBN Units 1 and 2
CNL 036 ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page3 of 7)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES REQUIRED SURVEILLANCE ALLOW ABLE NOMINAL FUNCTION OR OTHER CHANNELS CONDITIONS REQUIREMENTS VALUE TRIP CONDITIONSSPECIFIED SETPOINT
- 4. Steam Line Isolation (continued)
- c. Containment 1, 2(c), 3(c) 4 E SR 3.3.2.1 9 psig 8 psig Pressu - SR 3.4 gh High SR 3.9 SR 3.
Seam Line se
) Low 1, 2(, 3) 3 per D SR 3.1 666 ( 675 ( ig se ig line SR 3.4 SR 3.9 SR.30
) Nive 3 ) 3 per D SR 3.1 5 ( i 100 ( i se e - line SR 3.4 gh SR 3.9 SR 3.
Tne Tr Fsai Aic 1 (i), 2((i), 3((i) 2 r H SR 3.2 Acuaion SR 3.3 c
an Acuai SR 3.5 R a SG 1 (i), 2((i), 3((i) 3 perG I SR 3.1 83. 82.
L -Hig SR 3.4 High(P-14) SR 3.9 SR 3.10 )
Sa RFcion 1 (Synjion)or allniiion Inji iseq rs.
Nh MSVaul 1, 2(( va O SR 3.6 5.hes 4h Room Room SR 3.9 Level - Hi uhSV ul 1, 2(( va O SR 3.6 hes 4h Room R oom SR 3.9 Level - Hi (coninue Above he P-11 (Pressuz Prslk.
Timcoas usn he lealorl are 1 50 seconds and t 2 5 seconds.
(c) Except when all MSIVs are closed and de-activated.
(d) Function automatically blocked above P -11 (Pressurizer Interlock) setpoint and is enabled below P-11 when safety injection on Steam Line Pressure Low is manually blocked.
(e) Time constants utilized in the rate/lag controller are t 3 and t4 50 seconds.
(f) Except when all MFIVs, MFRVs, and associated bypass valves are closed and de-ac tivated or isolated by a closed manual valve.Except when all MFIVs, MFRVs, and MFRV bypass valves are closed or isolated by a closed manual valve.
(g) MODE 2 if Turbine Driven Main Feed Pumps are operating.
(h) For the time period between February 23, 2000, and prior to turbine restart (following the next time the turbine is removed from service), the response time test requirement of SR 3.3.2.10 is not applicable for 1-FSV-47-027.
(i) Turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening.
Watts Bar-Unit 1 3.3-36 Amendment 23,
ESFAS Instrumentation 3.3.2
Table 3.3.2-1 (page5 of 7)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES NOMINAL OR OTHER REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS SPECIFIED CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 6. Auxiliary Feedwater (continued)
- c. Safety Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
Injection
- d. Loss of Offsite 1, 2,3 4 per bus F Refer to Function 4 of Table 3.3.5-1 for Power SRs and Allowable Values
- e. Trip of all Main Feedwater Pumps
(1) Turbine 1( ij ), 2 1 per p ump J SR 3.3.2.8 43.3 psig 50 psig Driven SR 3.3.2.9 Main SR 3.3.2.10 Feedwater Pumps
and
(2) Standby 1, 2 1 P SR 3.3.2.8 NA NA Main SR 3.3.2.10 Feedwater SR 3.3.2.12 Pump
- f. Auxiliary 1, 2, 3, 4(k) 3 B SR 3.3.2.6 A) 0.5 1.2 Feedwater SR 3.3.2.9 psig A) psig Pumps Train A SR 3.3.2.10 and B Suction B) 1.33 2.0 Transfer on psig B) psig Suction Pressure - Low
- 7. Automatic Switchover to Containment Sump
- a. Automatic 1, 2, 3, 4 2 trains C SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
(continued)
( ij ) Entry into Condition J may be suspended for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when placing a Turbine Driven Main Feedwater (TDMFW) Pump in service or removing a TDMFW pumpfrom service.
( j ) Deleted.
( k ) When steam generators are relied on for heat removal.
Watts Bar-Unit 1 3.3-38 Amend ment 1, 75, 104, 148,
154,
ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS (continued)
Table 3.3.2-1 (page 4 of 9)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 5. Turbine Trip and Feedwater Isolation
- a. Automatic 1(j), 2 (h)(j), 3 (h)(j) 2 trains H SR 3.3.2.2 NA NA Actuation Logic SR 3.3.2.3 and Actuation SR 3.3.2.5 Relays
- b. SG Water Level - 1(j), 2 (h)(j), 3 (h)(j) 3 per SG I SR 3.3.2.1 83. 82.
High High (P-14) SR 3 ) (c)
SR 3 ) (c)
SR 3.
- c. Syecti RcunctiSetyecti f alltiion functisrents.
NtMSsault (h i) 3 per l SR 3 is 4 is Room Wat vault room SR 3 Lev gh
South MSsault (h i) 3 per l SR 3 is 4 is Room vault room SR 3 Lev gh
(continued)
) If the as cpoi issits ri tanc tthe c sllevuatoifytts functionisre rethe covic
) Ttrentetpoihall be ret to a thatsitn the t tcound t NinalripetpoiNTSP) the comion ofvllc otherwise, the cll be dlnoperabl he mhodologisomine t fseftances f tTSP arecificSAR Sti T.2.
) ExceptlcIss, McRss,nd assiated bypass vv arcled and -activ ised by a closanualve. Except wlcIss, McRss, and McRs byss vv are cled orsed by a closed manual vve.
) Ml 2fne ariven Mn ceps aring.
) Trifunctis rred wl tne stop vv or a govnor vves arelos andre iapable ofng.
Watts Bar - Unit 2 3.3-37 Amendment 55,
ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS (continued)
Table 3.3.2-1 (page 6 of 9)
Engineered Safety Feature Actuation System Instrumentation
APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT
- 6. Auxiliary Feedwater (continued)
- d. Loss of Offsite 1, 2, 3 4 per bus F Refer to Function 4 of Table 3.3.5-1 for SRs and Power Allowable Values. Notes (b) and (c) are applicable to SR 3.3.5.2 for this function.
- e. Trip of all Main Feedwater Pumps
(1) Turbine 1 (jk), 2 1 per pump J SR 3.3.2.8 (b)(c) 43.3 ig ig Driven Main SR 3.
Feedwater SR 3.
Pumps
and
) Standby 1 P SR 3 M SR 3.
c SR 3.
P
Ailiy 2, 4 (m l) 3 B SR 3 5 ig 2 pg c SR 3 ) (c)
P SR 3. ig 0 pg Tin A and Stirsf tion Prs - Low
(contied)
) If the as cpoi issits ri tanc tthe c sllevuatoifytts functionisre rethe covic
) Ttrentetpoihall be ret to a thats witn the t tcound t NinalripetpoiNTSP) the comion ofvllc otherwise, the cll be dlnoperabl he mhodologisomine t fseftances f tTSP areci fied in cSARti 2.
(jk) Ery ioti may beus up to 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />sacing TrivnTaMcump isvice or ring a TaMcW pumps fr svice.
) aed.
(m l) tms are bei ried on f heat.
Watts Bar - Unit 2 3.3-39 Amendment 55,
Enclosure
Attachment 3
Proposed Technical Specification Bases Changes (Mark-Up) for SQN Units 1 and 2 (For Information Only)
CNL 036 Engineered Safety Feature Actuation System (ESFAS) Instrumentation B 3.3.2
BASES
APPLICABLE SAFETY ANALYSES, LCO, and APPLICABILITY (continued)
This Funct ion is act uated by S G Water Le vel - High High, o r by a SI signal. The nom inal tri p setpoint and al lowable value limits ar e a percentage of t he nar row r ange i nstrument span f or each st eam generator. The R TS al so initiates a t urbine trip signal w henever a reactor trip (P -4) i s gener ated. I n the event of S I, the unit i s taken off line and the turbine generator must be tripped. The MFW S ystem i s also t aken out of oper ation and the AFW S ystem is aut omatically started. The SI signal was discussed previously. The turbine trip function is not required when all turbine stop v alves or all governor valves are closed and are incapable of opening (i.e., turbine tripped).
- a. Turbine Trip and Feedwater Isolation - Automatic Actuation Logic and Actuation Relays
Automatic Actuation Logic and Actuation Relays consist of the same features and operate in the same manner as described for ESFAS Function 1.b.
- b. Turbine Trip and Feedwater Isolation - Steam Generator Water Level - High High (P-14)
This signal provides protection against excessive feedwater flow.
The ESFAS SG water level instruments provide input to the SG Water Level Control System. Therefore, the actuation logic must be able to withstand both an input failure to the control system (which may then require the protection function actuation) and a single failure in the other channels providing the protection function actuation. Only three protection channels are necessary, with a two-out-of-three logic, to satisfy the protective requirements because a median signal selector is provided.
The transmitters (d/p cells) are located inside containment.
However, the events that this Function protects against cannot cause a severe environment in containment. Therefore, the NTSP reflects only steady state instrument uncertainties.
- c. Turbine Trip and Feedwater Isolation - Safety Injection
Turbine Trip and Feedwater Isolation is also initiated by all Functions that initiate SI. The Feedwater Isolation Function requirements for these Functions are the same as the requirements for their SI function. Therefore, the requirements are not repeated in Table 3.3.2-1. Instead Function 1, SI, is referenced for all initiating functions and requirements.
SEQUOYAH - UNIT 1 B 3.3.2-23 Revision 45 Amendment Engineered Safety Feature Actuation System (ESFAS) Instrumentation B 3.3.2
BASES
APPLICABLE SAFETY ANALYSES, LCO, and APPLICABILITY (continued)
This Funct ion is act uated by S G Water Le vel - High High, o r by a SI signal. The nom inal t rip setpoint and al lowable value limits are a percentage of t he nar row r ange i nstrument span f or each st eam generator. The R TS al so initiates a t urbine trip signal w henever a reactor trip (P -4) i s gener ated. I n the event of S I, the unit i s taken of f line and the turbine generator must be tripped. The MFW S ystem i s also t aken out of oper ation and the AFW S ystem is aut omatically started. The SI signal was discussed previously. The turbine trip function is not required when all turbine stop v alves or all governor valves are closed and are incapable of opening (i.e., turbine tripped).
- a. Turbine Trip and Feedwater Isolation - Automatic Actuation Logic and Actuation Relays
Automatic Actuation Logic and Actuation Relays consist of the same features and operate in the same manner as described for ESFAS Function 1.b.
- b. Turbine Trip and Feedwater Isolation - Steam Generator Water Level - High High (P-14)
This signal provides protection against excessive feedwater flow.
The ESFAS SG water level instruments provide input to the SG Water Level Control System. Therefore, the actuation logic must be able to withstand both an input failure to the control system (which may then require the protection function actuation) and a single failure in the other channels providing the protection function actuation. Only three protection channels are necessary, with a two-out-of-three logic, to satisfy the protective requirements because a median signal selector is provided.
The transmitters (d/p cells) are located inside containment.
However, the events that this Function protects against cannot cause a severe environment in containment. Therefore, the NTSP reflects only steady state instrument uncertainties.
- c. Turbine Trip and Feedwater Isolation - Safety Injection
Turbine Trip and Feedwater Isolation is also initiated by all Functions that initiate SI. The Feedwater Isolation Function requirements for these Functions are the same as the requirements for their SI function. Therefore, the requirements are not repeated in Table 3.3.2-1. Instead Function 1, SI, is referenced for all initiating functions and requirements.
SEQUOYAH - UNIT 2 B 3.3.2-23 Revision 45 Amendment Enclosure
Attachment 4
Proposed Technical Specification Bases Changes (Mark-Up) for WBN Units 1 and 2 (For Information Only)
CNL 036 ESFAS Instrumentation B 3.3.2
BASES
APPLICABLE 5. Turbine Trip and Feedwater Isolation SAFETY ANALYSES, LCO, and This Function is actuated by SG Water Level High High, MSVV Water APPLICABILITY Level - High, or by a SI signal. The RTS also initiates a turbine trip (continued) signal whenever a reactor trip (P-4) is generated. In the event of SI, the unit is taken off line and the turbine generator must be tripped. The MFW System is also taken out of operation and the AFW System is automatically started. The SI signal was discussed previously. The turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening (i.e., turbine tripped).
- a. Turbine Trip and Feedwater Isolation-Actuation Logic and Actuation Relays
Automatic Actuation Logic and Actuation Relays consist of the same features and operate in the same manner as described for ESFAS Function 1.b.
- b. Turbine Trip and Feedwater Isolation-Steam Generator Water Level-High High (P-14)
This signal provides protection against excessive feedwater flow.
The ESFAS SG water level instruments provide input to the SG Water Level Control System. Therefore, the actuation logic must be able to withstand both an input failure to the control system (which may then require the protection function actuation) and a single failure in the other channels providing the protection function actuation. Since Watts Bar has only 3 level channels per SG, control/protection interaction is addressed by the use of a Median Signal Selector which prevents a single failure of a channel providing input to the control system requiring protection function action. That is, a single failure of a channel providing input to the control system does not result in the control system initiating a condition requiring protection function action. The Median Signal Selector performs this by not selecting the channels indicating the highest or lowest steam generator levels as input to the control system.
The Function is actuated when the level in any SG exceeds the high high setpoint, and performs the following functions:
- Shuts the MFW regulating valves and the bypass feedwater regulating valves.
(continued)
Watts Bar-Unit 1 B 3.3-72 Amendment
ESFAS Instrumentation B 3.3.2
BASES
APPLICABLE b. Turbine Trip and Feedwater Isolation-Steam Generator Water SAFETY ANALYSES Level-High High (P-14) (continued)
LCO, and APPLICABILITY Since no adverse control system action may now result from a single, failed protection instrument channel, a second random protection system failure (as would otherwise be required by Reference 4) need not be considered.
The transmitters (d/p cells) are located inside containment.
However, the events that this Function protects against cannot cause a severe environment in containment. Therefore, the Trip Setpoint reflects only steady state instrument uncertainties.
- c. Turbine Trip and Feedwater Isolation-Safety Injection
Turbine Trip and Feedwater Isolation is also initiated by all Functions that initiate SI. The Feedwater Isolation Function requirements for these Functions are the same as the requirements for their SI function. Therefore, the requirements are not repeated in Table 3.3.2-1. Instead Function1, SI, is referenced for all initiating functions and requirements
- d. Turbine Trip and Feedwater Isolation - Main Steam Valve Vault Room Water Level - High
This signal precludes submergence of equipment that is required for safe shutdown in the event of a MSVV Room flood due to a Main Feedwater line break. MSVV Room Water Level -
High does not provide any control function. Thus, three OPERABLE channels in each Valve Vault Room are sufficient to satisfy the protection requirements with a two-out-of-three logic.
The level switches which are located inside the MSVV Rooms are subjected to adverse environmental conditions during a Main Feedwater line break. The trip setpoint reflects both steady state and adverse environmental instrument uncertainties.
Turbine Trip and Feedwater Isolation Functions - Automatic Actuation Logic and Actuation Relays, Steam Generator Water Level - High High (P-14), and Safety Injection must be OPERABLE in MODES 1, 2, and3 except when all MFIVs, MFRVs, and associated MFRV bypass valves are closed and de-activated or isolated by a closed manual valve when the MFW System is in operation and the turbine generator may be in operation. In MODES 4, 5, and 6, the MFW System and the turbine generator are not in service and this Function is not required to be OPERABLE.
(continued)
Watts Bar-Unit 1 B 3.3-73 Amendment
ESFAS Instrumentation B 3.3.2
BASES
APPLICABLE 5. Turbine Trip and Feedwater Isolation SAFETY ANALYSES, The primary functions of the Turbine Trip and Feedwater Isolation LCO, and signals are to prevent damage to the turbine due to water in the APPLICABILITY steam lines, and to stop the excessive flow of feedwater into the (continued) SGs. These Functions are necessary to mitigate the effects of a high water level in the SGs, which could result in carryover of water into the steam lines and excessive cooldown of the primary system.
The SG high water level is due to excessive feedwater flows.
An additional function of the Turbine Trip and Feedwater Isolation signal is to prevent submergence of safety related equipment in the Main Steam Valve Vault (MSVV) Rooms in the event of a Main Feedwater Line Break.
This Function is actuated by SG Water Level - High High, MSVV Water Level - High, or by an SI signal. The RTS also initiates a turbine trip signal whenever a reactor trip (P-4) is generated. In the event of SI, the unit is taken off line and the turbine generator must be tripped. The MFW System is also taken out of operation, and the AFW System is automatically started.
The SI signal was discussed previously. The turbine trip function is not required when all turbine stop valves or all governor valves are closed and are incapable of opening (i.e., turbine tripped).
- a. Turbine Trip and Feedwater Isolation - Actuation Logic and Actuation Relays
Automatic Actuation Logic and Actuation Relays consist of the same features and operate in the same manner as described for ESFAS Function 1.b.
- b. Turbine Trip and Feedwater Isolation - Steam Generator Water Level-High High (P-14)
This signal provides protection against excessive feedwater flow. The ESFAS SG water level instruments provide input to the SG Water Level Control System. Therefore, the actuation logic must be able to withstand both an input failure to the control system (which may then require the protection function actuation) and a single failure in the other channels providing the protection function actuation. Since Watts Bar has only 3 level channels per SG, control/protection interaction is addressed by the use of a Median Signal Selector which prevents a single failure of a
(continued)
Watts Bar - Unit 2 B 3.3-87 Amendment
ESFAS Instrumentation B 3.3.2
BASES
APPLICABLE d. Turbine Trip and Feedwater Isolation - Main Steam Valve SAFETY Vault Room Water Level - High
- ANALYSES, LCO, and This signal precludes submergence of equipment that is APPLICABILITY required for safe shutdown in the event of a MSVV Room (continued) flood due to a Main Feedwater line break. MSVV Room Water Level - High does not provide any control function.
Thus, three OPERABLE channels in each Valve Vault Room are sufficient to satisfy the protection requirements with a two-out-of-three logic.
The level switches which are located inside the MSVV Rooms are subjected to adverse environmental conditions during a Main Feedwater line break. The NTSP reflects both steady state and adverse environmental instrument uncertainties.
Turbine Trip and Feedwater Isolation Functions - Automatic Actuation Logic and Actuation Relays, Steam Generator Water Level - High High (P-14), and Safety Injection must be OPERABLE in MODES 1, 2, and 3 except when all MFIVs, MFRVs, and associated MFRV bypass valves are closed and de-activated or isolated by a closed manual valve when the MFW System is in operation and the turbine generator may be in operation. In MODES 4, 5, and 6, the MFW System and the turbine generator are not in service and this Function is not required to be OPERABLE.
Turbine Trip and Feedwater Isolation Function - MSVV Room Water Level - High must be OPERABLE in MODE 1 and in MODE 2 when the Turbine Driven Main Feedwater Pumps are operating. In MODE 2, due to the limited capacity of the Standby Main Feed Pump, and in MODES 3, 4, 5, and 6 a Main Feedwater Line break will not result in flooding which will submerge required safety equipment in the MSVV Rooms, therefore this Function is not required to be OPERABLE.
(continued)
Watts Bar - Unit 2 B 3.3-89 Amendment