ML23325A264

From kanterella
Jump to navigation Jump to search
Kairos Power LLC, Presentation Materials for Meeting with the Nuclear Regulatory Commission on the KP-FHR Core Design and Analysis Methodology
Date released: 11/28/2023 Download: ML23325A264


Kairos Power LLC, Presentation Slides for the November 30, 2023 KP-FHR Core Design and Analysis Methodology Pre Submittal Meeting
ML23325A267
Person / Time
Site: 99902069
Issue date: 11/21/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2311-002
Download: ML23325A267
Kairos Power LLC, Presentation Materials for Meeting with the Nuclear Regulatory Commission on the KP-FHR Core Design and Analysis Methodology
ML23325A265
Person / Time
Site: 99902069
Issue date: 11/21/2023
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
KP-NRC-2311-002
Download: ML23325A265