Clinch River CP Saf Docs - Initial Readiness Assessment Observations on Draft PSAR Section 13.6 (Phase 1) - Draft Clinch River CP Application
ML23319A321
Person / Time
Site: 99902056
Issue date: 11/15/2023
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML23319A321 (4)


Text

From:

Allen Fetter Sent:

Wednesday, November 15, 2023 12:39 PM To:

Schiele, Raymond Joseph; kecasey@tva.gov; Montague, Kelvin Jevon Cc:

Greg Cranston; Sean Gallagher; Michelle Hayes; ClinchRiver-CPSafDocsPEm Resource

Subject:

Initial Readiness Assessment Observations on draft PSAR Section 13.6 (Phase

1) - draft Clinch River CP application Attachments:

Initial Observations PSAR 13.6_Readiness Assessment_Phase 1.pdf Good Afternoon, Attached are initial NRC staff observations on draft PSAR Section 13.6, Security that staff viewed in TVAs electronic reading room as part of Phase 1 of the Readiness Assessment of the draft Clinch River CP application.

After all six phases of the Readiness Assessment are completed, NRC will transmit, via letter, a compilation of all final Readiness Observations on the Clinch River CP PSAR chapters and sections. The nomenclature initial is being used to account for potential TVA updates to the PSAR before the end of the Readiness Assessment.

If TVA makes any future updates to the draft PSAR chapters and sections for follow up observations by NRC staff, please contact me, Greg Cranston or Sean Gallagher.

Thanks, Allen H. Fetter, Senior Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of New and Renewed Licenses New Reactor Licensing and Infrastructure Branch Washington, D.C.

301-415-8556 (Office) 301-385-5342 (Mobile)

Hearing Identifier:

ClinchRiver_CPSafDocs_Public Email Number:

6 Mail Envelope Properties (MW4PR09MB9396E178341C4C1E04F2733C85B1A)

Subject:

Initial Readiness Assessment Observations on draft PSAR Section 13.6 (Phase

1) - draft Clinch River CP application Sent Date:

11/15/2023 12:38:48 PM Received Date:

11/15/2023 12:38:50 PM From:

Allen Fetter Created By:

Allen.Fetter@nrc.gov Recipients:

"Greg Cranston" <Gregory.Cranston@nrc.gov>

Tracking Status: None "Sean Gallagher" <Sean.Gallagher@nrc.gov>

Tracking Status: None "Michelle Hayes" <Michelle.Hayes@nrc.gov>

Tracking Status: None "ClinchRiver-CPSafDocsPEm Resource" <ClinchRiver-CPSafDocsPEm.Resource@nrc.gov>

Tracking Status: None "Schiele, Raymond Joseph" <rjschiele@tva.gov>

Tracking Status: None "kecasey@tva.gov" <kecasey@tva.gov>

Tracking Status: None "Montague, Kelvin Jevon" <kjmontague@tva.gov>

Tracking Status: None Post Office:

MW4PR09MB9396.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1073 11/15/2023 12:38:50 PM Initial Observations PSAR 13.6_Readiness Assessment_Phase 1.pdf 107784 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Readiness Assessment - Phase 1 Initial Readiness Assessment Observationsi on draft PSAR Section 13.6, Security Clinch River CP application November 15, 2023 Basis for Observation/Comment Readiness Assessment Observations Chapter 13.6, Security 10 CFR 73.56 and 73.57 SRP 13.6.4, Table 1 The added text of the 8th paragraph by reference, "the construction access program will provide for transition of procedures to operational authorize measures of 10 CFR 73.56 and 73.57", but it is unclear how the transition into the operational program would be implemented. This should be clarified in the PSAR.

The licensee should also consider guidance in Table 1 SRP 13.6.4 for determining AA measures prior to fuel in the protected area, while transitioning into their operational program.

Readiness Assessment - Phase 1 Basis for Observation/Comment Readiness Assessment Observations Per 10 CFR 73.55(a)(4), the requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage shall be implemented before fuel is allowed onsite (protected area).

Observation for Table 13.4-101 in the pre-application activities. Instead of Fuel Receipt for the Implementation Milestone, it should be Prior to receipt of fuel onsite (protected area), in accordance with 10 CFR 73.55(a)(4). Although the SRP states Fuel Receipt this has been changed for recent design centers (e.g., AP1000 and ESBWR) as Prior to receipt of fuel onsite (protected area) was determined to be less ambiguous.

i Input provided by NSIR/DPCP/RSB staff.