COMPANY:
FAX NUMBER:
One Sourc:e fi,.r
/lsset Protection Solutions*
1480 James Parkway-Heath, OH 43056 P: (740) 788-9188 - F: (740) 788-9189 www.mistrasgroup.com FACSIMILE TRANSMITTAL SHEET DATE:
TOTAL# OF PAGES:
V36\\)Bl<,o-s:\\.5J.
Tcl£PHONE NUMBER:
SENDER'S REFERENCE NUMBER.:
RE:
URGENT
[µFOR REVIEW PLEASE COMMrnT PLEASE REPLY PLEASE RECYCLE NOTES/COMMENTS:
October 20, 2023 To:
U.S. Nuclear Regulatory Commission
.ATTN: Documt'lnt Control Desk, Washington, DC 20555,0001 Re, 10 CFR Part 21 Interim Report This document is intended to fulffll the requirement of an interim report as specifi1'd in 10 CFR Part 21, the need for which is identified in Notification of Violation 99902109/2023-201-02 dat!ld 10/02/2023.
On June 10, 2021, individuals at the MISTRAS Services location in Trainer, PA discovered a deviation in the calibration certificates for an acoustic emission instrument. This AE system was used for acoustic emission testing of llft rigs used for reactor head and internals. This deviation involved calibration certificates that were falsified by the individuals responsible for the acoustic emission tests being performed. The calibration certificates were intended to represent "calibration" performed by Physical Acoustics Corporation (AKA MISTRAS Products and Systems), but the "calibrations" were not performed as stated.
The 10 CFR Part 21 evaluation was initiated on June 15, 2021, and quickly indicated that the extent of condition extends to additional instruments and acoustic emission tests performed at the following nuclear plants:
AEP
- DC Cook Oomtnion - Kewaunee Dominion, Surry Dominion
- Millstone Dominion - North Anna Duke Energy - Robinson Duke Energy - Oconee Entergy* ANO First Energy-Beaver Valley Florida Power & Light [NextEra J
- Turkey Point Florida Power & Light [NextEra)
- St Lucie NextEra - Seabrook Progress Energy [Duke Energy]* Shearon Harris Southern Company-Vogtle Southern Company-Farley Tennessee Valley Authority - Sequoyah Tennessee Valley Authority - Watt$ Bar Xcel Energy, Prairie.Island The initial evaluation of the deviation was expected to be completed within 60 days of the discovery; however :iddJtional information, that was not initially available, was uncovered causing the evaluation to extend beyond the 60-day period. The evaluation of this deviation Is essentially complete, and the documentation is being finalized. The final report will be m:ide available by November 1, 2023.
Sincerely, ws-;~ 10/aa/aoa3 Donald D. Smlth Quality Assurance Director MISTRAS Group, Inc.
( 630) 418-7301 donald.d.smith@mistrasgroup.com