Ms. Camille Zozula, Interim Director Quality Program and Regulatory Compliance Westinghouse Electric Company, LLC 1000 Westinghouse Dr.
Cranberry Township, PA 16066
SUBJECT:
NUCLEAR REGULATORY COMMISSION VENDOR INSPECTION REPORT OF WESTINGHOUSE ELECTRIC COMPANY, LLC NO. 99900404/2023-201
Dear Ms. Zozula:
On September 11 - 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an inspection at the Westinghouse Electric Company, LLCs (hereafter referred to as WEC) facility in Cranberry Township, PA. The purpose of this limited-scope routine inspection was to assess WECs compliance with provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 21, Reporting of Defects and Noncompliance, selected portions of Appendix B, Quality Assurance Program Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and 10 CFR 73.22, Protection of Safeguards Information: Specific Requirements. The NRC inspection team also inspected a sample of service bulletins and a sample of WECs initial design of the replacement steam generators for the Surry Power Station. The NRC inspection activities were observed by staff of the Poland National Atomic Energy Agency and the Poland Office of Technical Inspection.
This technically focused inspection specifically evaluated WECs implementation of safety-related design and engineering services for U.S. nuclear power plants and the Safeguards Information (SGI) program to determine its effectiveness in protecting SGI. The enclosed report presents the results of the inspection. This NRC inspection report does not constitute NRCs endorsement of WECs overall quality assurance (QA), 10 CFR Part 21, or SGI programs.
Based on the results of this inspection, the NRC inspection team found the implementation of your QA program met the requirements imposed on you by your customers or NRC licensees. No findings of significance were identified.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding and the NRCs Rule of Practice, a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRCs Public Document Room or from the NRCs document system (ADAMS), accessible at http://www.nrc.gov/reading-rm/adams.html.
October 27, 2023
C. Zozula 2
Sincerely, Kerri A. Kavanagh, Chief Quality Assurance and Vendor Inspection Branch Division of Reactor Oversight Office of Nuclear Reactor Regulation Docket No.: 99900404 EPID No.:
I-2023-201-0048
Enclosures:
Inspection Report No. 99900404/2023-201 and Attachment Zhang, Deanna signing on behalf of Kavanagh, Kerri on 10/27/23
ML23279A032 NRR-106 OFFICE NRR/DRO/IQVB NRR/DRO/IQVB NRR/DRO/IQVB NAME YLaw DPark YDiaz-Castillo DATE 10/12/2023 10/12/2023 10/13/2023 OFFICE NRR/DRO/IQVB NRR/DRO/IQVB NAME OAyegbusi KKavanagh (DZhang for)
DATE 10/13/2023 10/ 27/2023 Enclosure U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION DIVISION OF REACTOR OVERSIGHT VENDOR INSPECTION REPORT Docket No.:
99900404 Report No.:
99900404/2023-201 Vendor:
Westinghouse Electric Company, LLC 1000 Westinghouse Dr.
Cranberry Township, PA 16066 Vendor
Contact:
Ms. Camille Zozula Interim Director, Quality Program and Regulatory Compliance Phone: 412-374-2577 Email: zozulact@westinghouse.com Nuclear Industry Activity:
Westinghouse Electric Company, LLCs scope of supply includes design and engineering services for U.S. nuclear power plants.
Inspection Dates:
September 11 - 15, 2023 Inspectors:
Odunayo Ayegbusi NRR/DRO/IQVB Team Leader Yamir Diaz-Castillo NRR/DRO/IQVB Dong Park NRR/DRO/IQVB Yiu Law NRR/DRO/IQVB Remote Approved by:
Kerri Kavanagh, Chief Quality Assurance and Vendor Inspection Branch Division of Reactor Oversight Office of Nuclear Reactor Regulation
2 EXECUTIVE
SUMMARY
Westinghouse Electric Company, LLC 99900404/2023-201 The U.S. Nuclear Regulatory Commission (NRC) staff conducted a limited-scope routine vendor inspection at the Westinghouse Electric Company, LLCs (hereafter referred to as WEC) facility in Cranberry Township, PA, to verify it had implemented an adequate quality assurance (QA) program that complies with the requirements of Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities, and 10 CFR Part 21, Reporting of Defects and Noncompliance, 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and 10 CFR 73.22, Protection of Safeguards Information: Specific Requirements. The NRC inspection team conducted this inspection on-site from September 11 - 15, 2023. There have been various inspections at this facility in the past five years.
This technically-focused inspection specifically evaluated WECs implementation of the quality activities associated with the design and engineering services being supplied to U.S. nuclear power plants.
The following regulations served as the bases for the NRC inspection:
Appendix B to 10 CFR Part 50 10 CFR Part 21 10 CFR Part 73, Sections 21 & 22 During this inspection, the NRC inspection team implemented Inspection Procedure (IP) 43002, Routine Inspections of Nuclear Vendors, dated February 10, 2023; IP 43004, Inspection of Commercial-Grade Dedication Programs, dated February 10, 2023; IP 36100, Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance, dated February 10, 2023, and IP 81811, Protection of Safeguards Information by Design Certification Applicants and Vendors, dated April 8, 2020.
The NRC inspection team observed the following specific activities:
Walkdown of the Safeguards Information (SGI) cabinet inventory The results of this inspection are summarized below.
Inspection Areas The NRC inspection team determined that WEC established its programs for 10 CFR Part 21, nonconforming material, parts, or components, corrective action, design control, commercial-grade dedication, procurement document control, supplier oversight, internal audits, and SGI in accordance with the applicable regulatory requirements of Appendix B to 10 CFR Part 50, 10 CFR Part 21 and 10 CFR Part 73. Based on the limited sample of documents reviewed and activities observed, the NRC inspection team determined that WEC is implementing its policies and procedures associated with these programs. No findings of significance were identified in these areas.
3 REPORT DETAILS 1.
10 CFR Part 21 Program a.
Inspection Scope The U.S. Nuclear Regulatory Commission (NRC) inspection team reviewed Westinghouse Electric Company, LLCs (hereafter referred to as WEC) policies and implementing procedures that govern the implementation of its Title 10 of the Code of Federal Regulations (10 CFR) Part 21, Reporting of Defects and Noncompliance, program to verify compliance with the regulatory requirements. The NRC inspection team evaluated the 10 CFR Part 21 postings and a sample of WECs purchase orders (POs) to verify compliance with the requirements of 10 CFR 21.21, Notification of Failure to Comply or Existence of a Defect and its Evaluation, and 10 CFR 21.31, Procurement Documents. The NRC inspection team also verified that WECs nonconformance and corrective action procedures provide a link to its 10 CFR Part 21 program.
Furthermore, for a sample of 10 CFR Part 21 evaluations performed by WEC, the NRC inspection team verified that WEC had effectively implemented the requirements for evaluating deviations and failures to comply. The NRC inspection team verified that the notifications were performed in accordance with the requirements of 10 CFR 21.21, as applicable.
The NRC inspection team also discussed the 10 CFR Part 21 program with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion The NRC inspection team concluded that WEC is implementing its 10 CFR Part 21 program in accordance with the regulatory requirements of 10 CFR Part 21. Based on the limited sample of documents reviewed, the NRC inspection team also determined that WEC is adequately implementing its policies and procedures associated with the 10 CFR Part 21 program. No findings of significance were identified.
2.
Nonconforming Materials, Parts, or Components and Corrective Action a.
Inspection Scope The NRC inspection team reviewed WECs policies and implementing procedures that govern the implementation of its nonconforming materials, parts, or components and corrective action programs to verify compliance with the requirements of Criterion XV, Nonconforming Materials, Parts, or Components, and Criterion XVI, Corrective Action, of Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities.
4 The NRC inspection team verified that WECs processes and procedures provide for the identification, documentation, segregation, evaluation, and disposition of nonconforming items. These processes also apply the principles of rework/repair, use-as-is, scrap/salvage, return to vendor, or no defect found.
The NRC inspection team reviewed a sample of Nonconformance Reports (NCRs) and verified that WEC: (1) dispositioned the NCRs in accordance with the applicable procedures; (2) documented an appropriate technical justification for the dispositions; and (3) took adequate corrective action regarding the nonconforming items to prevent recurrence, as appropriate.
The NRC inspection team also reviewed a sample of Corrective Action Reports (CARs) and verified that the CARs contain, as applicable: (1) adequate documentation and description of conditions adverse to quality; (2) an appropriate analysis of the cause of these conditions and the corrective actions taken to prevent recurrence; (3) direction for review and approval by the responsible authority; (4) a description of the current status of the corrective actions; and (5) the actions taken to verify timely and effective implementation of the corrective actions.
The NRC inspection team discussed the nonconformance and corrective action programs with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c. Conclusion
The NRC inspection team concluded that WEC is implementing its nonconformance and corrective action programs in accordance with the regulatory requirements of Criterion XV and Criterion XVI of Appendix B to 10 CFR Part 50. Based on the limited sample of documents reviewed, the NRC inspection team also determined that WEC is implementing its policies and procedures associated with its nonconformance and corrective action programs. No findings of significance were identified.
3.
Design Control a.
Inspection Scope The NRC inspection team reviewed WECs policies and procedures that govern the implementation of its design control program to verify compliance with the requirements of Criterion III, Design Control, of Appendix B to 10 CFR Part 50.
WEC was awarded the contract for the supply of six Model 53F replacement steam generators (RSGs) for the Surry Power Station, Units 1 and 2. WEC is responsible for the design, manufacture, assembly, configuration, documentation, inspection, testing, information transfer and delivery of the RSGs. The NRC inspection team reviewed a sample of documents associated with the RSGs including: (1) a sample of POs; (2) technical and quality requirements; (3) the Equipment Supply Agreement; (4) the Project Quality Plan; (5) the Procurement Specifications; (6) the Design Specification; (7) a drawing for the tubesheet
5 forging; (8) the material specification for the forging; (9) and the overall Project Execution Plan. WEC is currently in the early stages of the design process of the lower assembly forgings. The NRC inspection team verified that WECs design control process was being adequately implemented for the design and engineering of the RSGs and consistent with the applicable regulatory requirements. In addition, for the limited sample of documents reviewed, the NRC inspection team confirmed that WEC had correctly translated the design requirements, including technical and quality requirements, into the documents listed above.
The NRC inspection team also reviewed an evaluation performed by WEC of the Westinghouse steam generators (SGs) design for susceptibility to flow-induced vibration, including the in-plane fluid elastic instability (FEI) mechanism. WEC performed this evaluation in response to the San Onofre Nuclear Generating Station (SONGS) Unit 3 SG tube degradation event that occurred in 2012. SONGS Unit 3 SGs had experienced excessive vibration of tubes in the U-bend region of the SGs to the extent that the tubes rubbed against each other (tube-to-tube interactions) causing excessive wear and loss of structural integrity. SONGS staff determined that the vibration was caused by the steam conditions in the U-bend region of the SGs due to in-plane FEI. Based on the performance of analyses and tests, as well as operating experience, the evaluation concluded that tube degradation resulting from tube vibration is not expected for the Westinghouse SGs.
The NRC inspection team reviewed WECs processes for performing design reviews and design changes. WEC utilizes the Engineering and Design Coordination Reports (E&DCRs) process to issue changes to AP1000 design documents under configuration control (e.g.,
specifications, drawings, data sheet reports, calculations, etc.). The NRC inspection team reviewed a sample of E&DCRs associated with the revision of the discharge for the AP1000 Residual Heat Removal System and the addition of an isolation valve to the Chemical and Volume Control System. The NRC inspection team confirmed that the E&DCR process was conducted in accordance with WECs implementing procedures, and the results of the design changes were adequately documented.
The NRC inspection team verified that WECs design control process: (1) adequately translated technical and quality requirements into procedures and instructions, (2) applied materials conformed to the material specifications, (3) design activities were effectively controlled by documented instructions and procedures, and (4) design changes were accomplished in accordance with the approved procedures.
The NRC inspection team also discussed the design control program with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion The NRC inspection team concluded that WEC is implementing its design control program in accordance with the regulatory requirements of Criterion III of Appendix B to 10 CFR Part
- 50. Based on the limited sample of documents reviewed, the NRC inspection team also determined that WEC is implementing its policies and procedures associated with the design control program. No findings of significance were identified.
6 4.
Commercial-Grade Dedication a.
Inspection Scope The NRC inspection team reviewed WECs policies and implementing procedures that govern the implementation of its commercial-grade dedication (CGD) program to verify compliance with the regulatory requirements of Criterion III and Criterion VII, Control of Purchased Material, Equipment, and Services, of Appendix B to 10 CFR Part 50.
The NRC inspection team reviewed a sample of CGD documents associated with the CGD of the following items: (1) rotary selector switches; (2) retaining rings; (3) secondary contact mounting assemblies; and (4) outer grafoil rings. The CGD documents reviewed included, as applicable: (1) CGD plans; (2) technical evaluations; (3) failure modes and effect analysis (FMEA); (4) receiving inspection reports; (5) Certificates of Conformance; (6) POs; and (7) commercial-grade surveys, as applicable.
The NRC inspection team evaluated the criteria for the identification of the safety functions, FMEA, selection of critical characteristics and acceptance criteria, selection of verification methods, and the justification provided for the of the sampling methodologies, as applicable, to verify effective implementation of WECs CGD process. The NRC inspection team confirmed that WECs CGD process provides reasonable assurance that the items and services being dedicated will perform their intended safety function.
The NRC inspection team also reviewed WECs measures for using the International Laboratory Accreditation Cooperation accreditation process in lieu of performing commercial-grade surveys for the procurement of calibration and testing services as part of the CGD process. WEC currently implements this process as described in the Nuclear Energy Institute Document No.14-05A, Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services, Revision 1, dated September 2020, which was recognized for use by the NRC in a safety evaluation dated November 23, 2020 (Agencywide Documents Access Management System Accession (ADAMS) No. ML20322A019).
The NRC inspection team also discussed the CGD programs with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion The NRC inspection team concluded that WEC is implementing its CGD program in accordance with the regulatory requirements of Criterion III and Criterion VII of Appendix B to 10 CFR Part 50. Based on the limited sample of documents reviewed, the NRC inspection team determined that WEC is implementing its policies and procedures associated with the CGD program. No findings of significance were identified.
5.
Procurement Document Control and Supplier Oversight
7 a.
Inspection Scope The NRC inspection team reviewed WECs policies and implementing procedures that govern the implementation of its procurement document control and supplier oversight programs to verify compliance with the regulatory requirements of Criterion IV, Procurement Document Control, and Criterion VII of Appendix B to 10 CFR Part 50.
The NRC inspection team reviewed WECs qualified supplier list (QSL), and a sample of POs and supplier audits. For the sample of POs reviewed, the NRC inspection team verified that the POs included, as appropriate: scope of work, right of access to the suppliers facilities, and conditions and restrictions imposed to sub-suppliers. The NRC inspection team confirmed that the POs adequately invoked the applicable technical, regulatory, and quality requirements.
The NRC inspection team selected a sample of suppliers from the QSL to review the methodology for conducting and documenting audits to verify adequate evaluation of the suppliers controls for meeting the applicable requirements of Appendix B to 10 CFR Part
- 50. For the sample of supplier audits reviewed, which included suppliers related to the RSGs for the Surry Power Station, the NRC inspection team verified the following: the audit reports included an audit plan; audits were performed according to established frequency; audit reports included adequate documented objective evidence of compliance with the applicable requirements; and audit documentation was reviewed by WECs responsible management.
The NRC inspection team also discussed the procurement document control and supplier oversight programs with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion The NRC inspection team concluded that WEC is implementing its procurement document control and supplier oversight programs in accordance with the regulatory requirements of Criterion IV and Criterion VII of Appendix B to 10 CFR Part 50. Based on the limited sample of documents reviewed, the NRC inspection team determined that WEC is adequately implementing its policies and procedures associated with the procurement document control and supplier oversight programs. No findings of significance were identified.
6.
Internal Audits a.
Inspection Scope The NRC inspection team reviewed WECs policies and implementing procedures that govern its internal audit program to verify compliance with the requirements of Criterion XVIII, Audits, of Appendix B to 10 CFR Part 50. The NRC inspection team reviewed WECs internal audit plans, internal audit reports, and CARs generated during internal audits when applicable. The NRC inspection team verified that the audit documents reviewed were
8 adequately completed and that WEC adequately corrected the conditions identified in CARs generated during internal audits. The NRC inspection team verified that WECs procedures described the scope and purpose of audits to be performed, the frequency, audit criteria, and corrective actions when required. The NRC inspection team verified that the audit teams were selected using qualified auditors and that they were not auditing their own work.
The NRC inspection team verified that internal audits were performed using checklists.
The NRC inspection team discussed the internal audits program with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion The NRC inspection team concluded that WEC is implementing its internal audits program in accordance with the regulatory requirements of Criterion XVIII of Appendix B to 10 CFR Part
- 50. Based on the limited sample of documents reviewed, the NRC inspection team determined that WEC is adequately implementing its policies and procedures associated with the internal audit program. No findings of significance were identified.
7.
Safeguards Information Program a.
Inspection Scope The NRC inspection team reviewed WECs policies and implementing procedures that govern the implementation of its safeguards information (SGI) program to verify compliance with the regulatory requirements of 10 CFR Part 73.21, Protection of Safeguards Information: Performance Requirements, and 10 CFR Part 73.22, Protection of Safeguards Information: Specific Requirements.
The NRC inspection team: (1) reviewed WECs implementing procedures for controlling and protecting SGI; (2) interviewed WECs SGI program personnel; (3) inspected the SGI secured location and locked SGI security containers; (4) reviewed a sample of SGI hardcopy materials for proper markings and storage; (5) verified labeling of electronic media such as SGI hard drives and laptops; and (6) reviewed a sample of logs, access lists, program self-assessments, and corrective actions. The NRC inspection team also reviewed a sample of personnel files regarding personnel conditions for access to SGI material.
The NRC inspection team also discussed the SGI program with WECs management and technical staff. The attachment to this inspection report lists the documents reviewed and personnel interviewed by the NRC inspection team.
b.
Observations and Findings No findings of significance were identified.
c.
Conclusion
9 The NRC inspection team concluded that WEC is implementing its SGI program in accordance with the regulatory requirements of 10 CFR Part 73.21 and 73.22. Based on the limited sample of documents reviewed and activities observed, the NRC inspection team determined that WEC is implementing its policies and procedures associated with the SGI program in accordance with the regulatory requirements of 10 CFR 73.21 and 10 CFR 73.22. No findings of significance were identified.
8.
Entrance and Exit Meetings On September 11, 2023, the NRC inspection team presented the inspection scope during an entrance meeting with Mr. Peter Chan, WECs VP of Global Quality, and other members of WECs management and technical staff. On September 15, 2023, the NRC inspection team presented the inspection results to Mr. Chan and other members of WECs management and technical staff. The attachment to this report lists the attendees of the entrance and exit meetings, as well as those individuals whom the NRC inspection team interviewed.
10 ATTACHMENT 1.
ENTRANCE/EXIT MEETING ATTENDEES Name Position Affiliation Entrance Exit Interviewed Peter Chan VP, Global Quality Westinghouse Electric Company, LLC (WEC)
X X
Camille Zozula Interim
- Director, Quality Program and Regulatory Compliance WEC X
X Quang Nguyen
- Director, Control &
Information Systems WEC X
X Ben Millar
- Manager, Quality WEC X
X Brian Domitrovich
X Lucas Smozski Engineer WEC X
X Pavel Tyrpak
- Director, QEHS Environme ntal &
Engineerin g
WEC X
Venki Prabhu Consulting Engineer WEC X
X X
Soeren Wiener Snr. Director, Additive Manufacturing WEC X
X Keegan Foster Principal Engineer WEC X
11 Chris Kupper Snr. Manager, Issue Resolution WEC X
Matt Evans
- Director, Electrical WEC X
Kasey Corbin
- Manager, Safety System S/W WEC X
X Chris Crefeld
- Director, Safety &
Reactor Sys.
Eng.
WEC X
X Ed Forrai
- Manager, QEHS Management Systems WEC X
X X
Phillip Greco
- Manager, Computer Aided Engineering and Digital Design WEC X
Pat Strauch Principal Engineer WEC X
Edward Drake Principal Engineer WEC X
X Zach Harper Licensing Manager WEC X
X Ilana Schimmel Licensing Engineer WEC X
Greg Glenn Principal Licensing Engineer WEC X
X Frank Colosimo Licensing Engineer WEC X
X Angela Zubroski Quality Engineer WEC X
Stephen Packard QA Manager WEC X
X
12 Melanie Arnold
- Director, Safety Analysis Risk Analysis Licensing WEC X
Matt Shakun Principal Licensing Engineer WEC X
Mike Sleigh Fellow Engineer WEC X
X Thomas Joseph Fellow Engineer WEC X
Max Blankinship ASME QA Manager WEC X
Rebecca Parks
- Manager, Electrical WEC X
Michael J.
Stefanik
- Director, Global Supplier Quality WEC X
Lynette S.
Little Manager, New Stanton Quality WEC X
Maria Blose Quality Manager WEC X
Steve Reed Product Manager WEC X
Chris Srock
Odunayo Ayegbusi Inspection Team Leader Nuclear Regulatory Commission (NRC)
X X
Dong Park Inspector NRC X
X Yamir Diaz-Castillo Inspector NRC X
X
13 Yiu Law Inspector NRC X
X Kerri Kavanagh Branch Chief NRC X
X Daniel Clapa Nuclear Regulatory Inspector Candidate Poland National Atomic Energy Agency X
X Sebastian Kosowski Technical Inspector Poland Office of Technical Inspection X
X 2.
INSPECTION PROCEDURES USED:
Inspection Procedure (IP) 43002, Routine Inspections of Nuclear Vendors, dated February 10, 2023 IP 43004, Inspection of Commercial-Grade Dedication Programs, dated February 10, 2023 IP 36100, Inspection of 10 CFR Part 21 and Programs for Reporting of Defects and Noncompliance, dated February 10, 2023 IP 81811, Protection of Safeguards Information by Design Certification Applicants and Vendors, dated April 8, 2020 3.
DOCUMENTS REVIEWED Quality Assurance Procedures (QAP)
QMS-A, Quality Management System, Revision 8.0, dated May 22, 2020 QA-2.8, Qualification of Audit Personnel, Revision 2.2, dated December 14, 2022 W2-2.5-200, Personal Qualification and Certification, Revision 1.1, dated January 29, 2020 W2-4.2-101, Internal Quality Assurance Audits, Revision 4.0, dated June 19, 2019 W2-4.2-101.W01, Internal Quality Assurance Audit Instructions, Revision 0.0, dated June 19, 2019 W2-4.3-101, Management Reviews, Revision 3.1, dated January 24, 2023 W2-5.1-101, Westinghouse Corrective Action Program Procedure, Revision 9.0, dated November 30, 2022 W2-5.1-101.F01, Corrective Action Program Issue, Revision 6.0, dated November 30, 2022 W2-5.1-101-F04, Request to Modify or Delete a Pending or Previously-Implemented Corrective Action to Prevent Recurrence (CAPR), Revision 5.0, dated November 30, 2022 W2-5.1-101-W01, Corrective Action Program Issue Identification, Screening, and Classification, Revision 3.2, dated April 26, 2023 W2-5.1-201, Identification and Reporting of Conditions Adverse to Nuclear Safety,
14 Revision 2.2, dated November 9,2022 W2-5.1-201.F01, Team Member 10CFR50.55(E) Review Checklist, Revision 0.0, dated May 10, 2019 W2-5.1-201.J01, Review for Significant Breakdown in a Quality Assurance Program under 10 CFR 50.55(e), Revision 0.0, dated May 10, 2019 W2-5.1-201.W01, Nuclear Safety Review Staff Work Instruction, Revision 2.2, dated November 9, 2022 W2-5.1-201.W02, 10 CFR 21 and CFR 50.55(e) Posting, Revision 0.0, dated October 6, 2021 W2-9.4-101, Control of Purchased Items and Services, Revisions 8.1, dated August 24, 2022 W2-9.5-101, Supplier QA Program Qualification and Assessment, Revision 3.0, dated November 11, 2020 W2-9.5-104, Supplier Oversight, Revision 2.0, dated June 5, 2018 W2-9.5-105, Control of Suppliers on the ASL and QSL, Revision 3.0, dated October 10, 2018 QA-2.8, Qualification of Audit Personnel, Revision 2.2, dated December 14, 2022 QA-2.9, Qualification of Inspection and Testing Personnel, Revision 4.0, dated June 24, 2021 W2-1.3-102, Management System Manuals, Quality Plans, and Interface Agreements, Revision 2.0, dated September 28, 2018 W2-8.1-101, Design and Development, Revision 3.2, dated March 16, 2023 W2-8.1-102, Engineering Peer Review, Revision 1.0, dated August 15, 2017 W2-8.2-102, Design Classification, Revision 1.0, dated July 18, 2017 W2-8.3-101, Design Analysis, Revision 3.0, dated June 12, 2018 W2-8.3-102, Failure Mode and Effects Analysis, Revision 1.0, dated August 15, 2016 W2-8.4-101, Design Review, Revision 3.0, dated October 17, 2017 W2-8.4-102, Design Document Verification, Revision 1.0, dated June 12, 2018 W2-8.4-103, Design Testing, Revision 1.0, dated November 6, 2018 W2-8.5-100, Design Change Control Process, Revision 0.0, dated August 15, 2016 W2-8.5-106, Design Change, Revision 0.1, dated August 15, 2017 W2-9.5-101, Supplier QA Program Qualification and Assessment, Revision 3.0, dated November 11, 2020 W2-9.5-102-J02, Guidance on the Evaluation and Acceptance of Commercial Grade Digital Equipment, Revision 0.0, dated January 8, 2016 W2-9.5-102, Commercial Dedication Process, Revision 2.0, dated June 22, 2022 W2-9.5-102.W01, Alternate Method for Dedication of Calibration and Testing Services, Revision 0.3, dated April 1, 2023 WPB-9.7-100, Westinghouse Parts Business Control of Production Shop Travelers, Revision 5.0, dated August 2, 2022 WPB-9.8-131, Westinghouse Parts Business Control of Inspection Stamps, Revision 2.0, dated July 28, 2022 W2-9.14-100, Control of Nonconforming Process Outputs, Products and Services, Revision 2.0, dated February 27, 2018 W2-9.14-101, Use of Hold Tags, Revision 1.0, dated February 27, 2018 W2-9.14-101.F01, Hold Tag, Revision 0, dated January 8, 2016 W2-9.14-102, Field Deviation Report, Revision 5.1, dated December 12, 2022 W2-9.14-102-F01, Field Deviation Report (FDR), Revision 4.0, dated September 30, 2019
15 W2-9.14-103, Stop Work, Revision 0.2, dated February 9, 2022 W2-9.14-103.F01, Stop Work Order, Revision 1, dated January 15, 2016 W2-9.9-100, Identification and Traceability, Revision 0.1, dated June 30, 2016 Design Control and Commercial-Grade Dedication APP-GW-GAP-341, AP1000 Plant Program Design Change Control, Revision 11, dated August 29, 2023 APP-GW-GAP-420, Engineering and Design Coordination Report, Revision 22, dated September 3, 2022 APP-DK01-VBR-001, Equipment Qualification Summary Report for 250 VDC Motor Control Center (DK01) for Use in the AP1000 Plant, Revision 4, dated June 4, 2018 Drawing No. VPAM-SG000-DW-CE-000001, Surry Units 1 and 2 Model 53F Replacement Steam Generator Tubesheet Forging, Revision 0 (no date provided)
LTR-CMDP-19-60, Assessment of Susceptibility to In-Plane Fluidelastic Instability (IP FEI) for the Westinghouse Steam Generator Fleet, Revision 0, dated December 18, 2019 LTR-EQ-23-1, 2023 EMC Lab Equipment Calibration, Revision 2, dated March 30, 2023 Engineering and Design Coordination Report (E&DCR) No. APP-FSAR-GEF-230, Revised Residual Heat Removal Discharge Class 1, Revision 0 (no date provided)
E&DCR No. APP-FSAR-GEF-502, Addition of Isolation Valve on CVS Line L018 - ESR 50167696, Revision 0 (no date provided)
Project Execution Plan No. WPMR-PEP-2022-000008, Surry Power Station Steam Generator Replacement Project, Revision 0, dated August 2023 Quality Plan No. PQP-PES-23-002, Quality Plan for the Engineering and Manufacture of the Surry Units 1 & 2 Replacement Steam Generators, Revision 0 (no date provided)
U037-QSR-01, Quality Assurance Requirements for ASME Code Class 1, 2, and 3 Material, Revision A, dated June 16, 2023 VPAM-SG000-SP-CM-000001, SA-508 Grade 3 Class 2, Forgings (Section III-NB),
Revision 0, dated June 9, 2023 VPAM-SG000-SP-CD-000001, Design Specification for Model 53F Replacement Steam Generators for Surry Power Station Units 1 and 2, Revision 0 (no date provided)
Specification No. SU-SPEC-PS-MU-008, Procurement Specification for Replacement Steam Generators for Surry Power Station Units 1 and 2, Revision 1 (no date provided)
Equipment Supply Agreement Between Virginia Electric and Power Company and Westinghouse Electric Company LLC for the Steam Generator Replacement Project at the Surry Power Station (no date provided)
Commercial Dedication Instruction (CDI) No. 4730, Rotary Selector Switches, Electroswitch, Revision 4, dated May 5, 2021 CDI-4321, Calibration Services for Inspection, Measuring, and Test Equipment, Revision 6, dated August 10, 2022 CDI-Q&CI-14-010, Commercial Dedication Instruction for Calibration Services provided to Westinghouse, Revision 4, dated March 11, 2022 CDI-2597, Retaining Ring, Revision 4, dated March 28, 2023 CDI-5076, Secondary Contact Mounting Assemblies, VCP-W Switchgear, Revision 00, dated October 5, 2020 CDI-2691, Outer Grafoil Ring, Revision 4, dated October 21, 2013 CDI-2691, Dedication Data Sheet for P/N EQLOC-1650-0221 Y, dedicated on
16 September 25, 2022 CDI-4730, Dedication Data Sheet for Westinghouse Electric Company (WEC) Part No.
10076D75H19Y, Manufacturers P/N 74202AFB, dedicated on July 25, 2023 CDI-2597, Dedication Data Sheet for WEC Part No. 5100118HY, Manufacturers P/N 5100118H, dedicated on March 30, 2023 CDI-5076, Dedication Data Sheet for WEC P/N 691C573G01 and 691C573G02, Manufacturers P/N 691C573G01 and 691C573G02, dedicated on January 4, 2023 CDI-4321, Dedication Data Sheet for WEC ID No. SAP 40002091, dedicated on March 20, 2023 CDI-4321, Dedication Data Sheet for WEC ID No. SAP 800924, dedicated on March 20, 2023 CDI-4321, Dedication Data Sheet for WEC ID No. SAP 40002447, dedicated on March 20, 2023 CDI-4321, Dedication Data Sheet for WEC ID No. SAP 800921, dedicated on March 20, 2023 WEC Certificate of Conformance for Customer a Retaining Ring, Order No.
SNG10300138, WEC Sales Order No. 174482, Project SV3, dated March 31, 2023 WEC Certificate of Conformance for a Secondary Slider with Guide Rails, Customer Order No. SNG56499-0972, WEC Sales Order No. 173149, Project SV3, dated January 9, 2023 WEC Certificate of Conformance for a key lockable rotary selector switch, Customer Order No. SNG10290752, WEC Sales Order No. 170991, Project SV3, dated July 28, 2023 WEC Certificate of Conformance for an outer grafoil ring, Customer Order No.
SNG56499-0958, WEC Sales Order No. 172600, Project SV3, dated January 25, 2023 PPP-GW-GL-201, Poland AP1000 Units FEED Project: Compliance Assessment of the AP1000 Plant for the Poland Regulation on the Scope of the Preliminary Safety Analysis Report, Revision B, dated January 19, 2022 PPP-GW-GL-203, Poland AP1000 Units FEED Project: Compliance Assessment of the AP1000 Plant for the Poland Regulation on Nuclear Safety and Radiological Protection Requirements for Nuclear Facility Design, Revision B, dated January 19, 2022 APP-GW-GEE-2409, Adoption of IEC Standards for 50 Hz Electrical Design, Revision 22, dated September 3, 2022 APP-GW-GEE-1386, AP1000 Costal Site Hardening of Turbine Building Equipment, Revision 0, dated August 11, 2010 APP-GW-GEE-1942, Increase in the Exhaust Vent Stack Height to meet UK Regulations, Revision 0, dated December 23, 2010 APP-GW-GEE-5573, AP1000 CA05 Module Optimization, Revision 0, dated January 2, 2020 APP-GW-GEE-5574, CA03 Optimization, Revision 0, dated December 20, 2019 APP-GW-GEE-5575, Shield Building Optimization, Revision 0, dated December 17, 2020 APP-GW-GEE-5576, AP1000 CH02 Optimization, Revision 0, dated December 17, 2020 APP-GW-GEE-5577, AP1000 Plant Design Changes to Support Load Regulation/Frequency Control Operations, Revision 0, dated February 4, 2021 APP-GW-GEE-5579, Incorporation of ASME Code Case N-841 into future AP1000 Units Containment Vessel Design, Revision 0, dated April 5, 2022
17 Audit/Survey WES-2023-11, Audit of Supplier, dated November 17, 2022 WES-2022-265, Audit of Supplier, dated June 27, 2023 Commercial Grade Survey Plan No. WES-2021-075, dated June 23, 2021 Commercial Grade Survey Report No. WES-2021-075, dated July 14, 2021 Purchase Orders (PO)
PO No. 4500882842, Replacement Steam Generators, dated June 8, 2023 PO No. 4500870233, EVINCI NTR Heat Pipe Tubes, dated December 19, 2022 PO No. 4500860430 for a key lockable rotary selector switch, Part Number (P/N) 74202AFB, Revision 0, dated August 9, 2022 PO No. 4500875011 for stainless steel retaining rings, Revision 0, dated February 24, 2023 PO No. 4500866953 for secondary sliders with guide rails, Revision 0, dated November 7, 2022 PO No. 4500865553 for outer grafoil rings, Revision 0, dated October 19, 2022 PO No. 202300163 for the supply of forgings for the replacement steam generators for the Surry Power Station, Revision 0, dated June 26, 2023 PO No. 4500882842 for the supply of 6 replacement steam generators, Revision 0, dated June 8, 223 PO No. 4500869331 for calibration services, Revision 0, dated December 8, 2022 PO No. 4500866762 for calibration services, Revision 0, dated November 3, 2022
- to PO No. 4500882842, Additional Technical and Quality Requirements for Replacement Steam Generators at Surry Units 1 and 2, Revision 0 Measuring and Test Equipment Certificate of Calibration No. 221110-110907-86dee1 for a directional coupler, calibrated on November 30, 2022 Certificate of Calibration No. 221110-110904-cb6178 for an EFT attenuator, calibrated on December 1, 2022 Certificate of Calibration No. 221110-110804-e4b32d for a power meter, calibrated on November 30, 2022 Certificate of Calibration No. 221110-110812-9ffe29 for a directional coupler, calibrated on November 29, 2022 Nonconformance Reports APP-PV31-GNR-015, Revision 0 SV0-JE02-GNR-000002, Revision 0 SV0-PV00-GNR-000001, Revision 0 SV0-PV16-GNR-000007, Revision 0 SV0-PV72-GNR-000001, Revision 0 SV3-1040-GNR-000001, Revision 1 SV3-1121-GNR-000014, Revision 0 SV3-1152-GNR-000015, Revision 0 SV3-1254-GNR-000008, Revision 0
18 SV3-CC01-GNR-000639, Revision 0 Corrective Action Reports (CARs) Reviewed During the NRC Inspection CAP IR-2019-2765 CAP IR-2019-3067 CAP IR-2019-3711 CAP IR-2019-3938 CAP-IR-2021-1030 CAP-IR-2021-520 CAP-IR-2021-645 CAP-IR-2021-7737 CAP-IR-2022-416 CAP-IR-2022-792 CAP-IR-2022-1003 CAP-IR-2022-9013 CAP-IR-2022-10045 CAP-IR-2022-8235 CAP-IR-2022-8737 CAP-IR-2022-9013 CAP-IR-2022-9415 CAP-IR-2023-100 CAP-IR-2023-421 CAP-IR-2023-1973 CAP-IR-2023-2509 CAP-IR-2023-5164 CAP-IR-2023-5195 CAP-IR-2023-5551 CAP-IR-2023-6978 OE-2022-80 10 CFR Part 21 Records LTR-SRC-21-5 LTR-SRC-21-7 LTR-SRC-21-15 LTR-NIS-22-003 LTR-SRC-22-10 LTR-SRC-22-25 LTR-SRC-23-5 LTR-SRC-23-8 LTR-SRC-23-13 LTR-EQ-23-32 Training Records Lead Auditor Training and Qualification Records for Ronald Wessel, Monika Thiede, Merissa Arnold, and Arthur J. Trozzi
19 Inspection and Test Personnel Certification of Qualification Records for Alexander W.
Impink, Timothy P. Ruane, Todd Zonna, and John T. Filson, Jr.
Training Record for Zachary Harper Training Record for Richard Klimek Training Record for Brian Deppe Training Record for Sean Halfhill Training Record for James Velardi Training Record for Camille Zozula Safeguards Documents APP-GW-GAP-300, AP1000 Nuclear Plant Project Control of Safeguards Information, Revision 15, dated March 2, 2021 APP-GW-GAP-300, AP1000 Nuclear Plant Project Control of Safeguards Information, Revision 14, dated August 9, 2019 APP-GW-GAP-300, AP1000 Nuclear Plant Project Control of Safeguards Information, Revision 13, dated April 25, 2016 WSA-APD-22-001, Westinghouse 2022 Self-Assessment of SGI Program, dated December 21, 2022 WEC-SIAAP 2006, Access Authorization Plan for Access to Safeguards Information, Revision 2, dated February 22, 2019 AP1000 Safeguards Information Access List, Revision 88, dated August 29, 2023 SGI Inventory Listing, inspected on September 12, 2023 Letter from Zachary Harper, Licensing Engineering Manager, to Keith Everly, Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Information Related to the Preliminary Safeguards Determination of AP1000 Documentation, dated December 19, 2020 Internal Audits WEC 2021-16, Internal Audit Report, dated August 26, 2021 WEC 2022-7, Internal Audit Report, dated July 29, 2022 WEC 2023-11, Internal Audit Report, dated March 31, 2023 Service Bulletins NSAL-20-1, Reactor Vessel Head Control Rod Drive Mechanism Penetration Thermal Sleeve Cross-Sectional Failure, Revision 1, dated September 23, 2021 TB-19-5, Thermal Shield Flexures and Support Block Cap Screws, Revision 2, dated September 7, 2022 TB-21-2, Fuel Handling Equipment, Revision 0, dated August 23, 2021 Miscellaneous QSL Data Report (SR and CGD Vendors), Revision 0, dated September 12, 2023 APP-MI01-Z0-101, AP1000 Reactor Vessel Internals Design Specification, Revision 10 APP-WWS-GEF-500, APP-WWS-M3C-010 Diesel Generator Sump Assumption CAP 2022-9415, Revision 0 ALAM-RV010-TM-CA-000001, CAP-IR 2021-645 Evaluation of Nuclear Safety Impact,
20 dated June 21, 2021 SV0-MI01-N2C-002, AP1000 Reactor Internals Neutron Shield Panel Replacement Capscrew Evaluation, Revision 1 SV3-MI01-GEF-003, Expansion of Neutron Shield Panel Replacement, Revision 0 SV3-MI01-GEF-004, Expansion of Neutron Shield Panel Replacement Capscrew Contingency - Category T, Revision 0