ML23258A073

From kanterella
Jump to navigation Jump to search
U-Metal Project ISA Summary Page Changes
ML23258A073
Person / Time
Site: Erwin
Issue date: 09/15/2023
From: Holly T
BWXT Nuclear Fuel Services
To: James Downs
NRC/NMSS/DFM/FFLB
Shared Package
ML23258A072 List:
References
21T-23-0744, TCH-23-003, HEA-21
Download: ML23258A073 (1)


Text

21T-23-0744 BW Nuclear Fuel Services, Inc.

TCH-23-003 HEA-21 To: James Downs, NRC Senior Project Manager From: Tom Holly, NFS Licensing Manage~

Date: 15 September 2023 Re: Page Change Updates for the U-Metal Project ISA Summary (NPH IROFS)

This memorandum transmits page change updates to the Building 301 HEU Metal Production Facility Integrated Safety Analysis Summary, Revision 3, (21T-23-0643).

Standing alone, the page changes are marked "Official Use Only"; however, the classification should be updated when combined with the referenced document.

The document control information associated with this memorandum (21T-23-0744) is applied to the page changes for traceability until a full revision is completed at a later date.

If you or your staff have any questions, require additional information, or wish to discuss this, please contact me and/or Danielle Rogers, Nuclear Safety and Licensing Section Manager.

1205 Banner Hill Rd, Erwin, TN 37650 People Strong t: +1 423 743.9141 f: + 1.423 743 ,0140 www.bwxt.com INNOVATION DRIVEN >