ML23258A073
| ML23258A073 | |
| Person / Time | |
|---|---|
| Site: | Erwin |
| Issue date: | 09/15/2023 |
| From: | Holly T BWXT Nuclear Fuel Services |
| To: | James Downs NRC/NMSS/DFM/FFLB |
| Shared Package | |
| ML23258A072 | List: |
| References | |
| 21T-23-0744, TCH-23-003, HEA-21 | |
| Download: ML23258A073 (1) | |
Text
BW Nuclear Fuel Services, Inc.
To:
James Downs, NRC Senior Project Manager From: Tom Holly, NFS Licensing Manage~
Date: 15 September 2023 21T-23-0744 TCH-23-003 HEA-21 Re:
Page Change Updates for the U-Metal Project ISA Summary (NPH IROFS)
This memorandum transmits page change updates to the Building 301 HEU Metal Production Facility Integrated Safety Analysis Summary, Revision 3, (21T-23-0643).
Standing alone, the page changes are marked "Official Use Only"; however, the classification should be updated when combined with the referenced document.
The document control information associated with this memorandum (21T-23-0744) is applied to the page changes for traceability until a full revision is completed at a later date.
If you or your staff have any questions, require additional information, or wish to discuss this, please contact me and/or Danielle Rogers, Nuclear Safety and Licensing Section Manager.
1205 Banner Hill Rd, Erwin, TN 37650 t: +1 423 743.9141 f: + 1.423 743,0140 www.bwxt.com People Strong INNOVATION DRIVEN >