ROP Bi-Monthly Public Meeting x
Enhancing Oversight of PRA Configuration Controlx September 20, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch
Project Milestones Obtained Develop Enf./SDP Develop Completed Issue Public Alignment with strategy and long-term Tabletops Report on NRC Mgt. on Regional Panel oversight process at facilities Tabletops PCC Proposal Guidance Dec 2022 Jun 2023 Dec 2023 2026 Mar 2023 Conduct public Gather feedback Developed Develop meeting from near-term Working Group near-term Workshop with oversight, update as recommendations oversight Tabletop necessary for near-term guidance sites/Industry path forward (OpESS) 2024-2026 Stakeholders Feb/Jun 2023 Summer 2023 Mar 2023 2
Key Messages Operating Experience Smart Sample (OpESS) provides maximum flexibility for regional implementation.
Cross-regional review panel process will ensure consistent application across the Regional Offices.
The WG is currently drafting the OpESS and associated guidance.
The OpESS is intended to be resource neutral and is part of the overall graded and balanced approach that will eventually determine the long-term recommendations for PRA Configuration Control (PCC),
which is targeted for implementation in the 2027 ROP inspection cycle.
3 3
What is OpESS?
OpE - Operating Experience and SS - Smart Sample = OpESS The OpESS is designed as an additional tool to be used by agency staff in ROP baseline inspection preparation.
The information and trends identified from OpESS inspections may provide further indication that a specific issue warrants additional agency action.
Each OpESS has a unique and sequential identifier.
https://www.nrc.gov/reactors/operating/ops-experience/operating-experience-smart-sample.html 4 4
What will the OpESS look like?
Balanced approach will ensure that inspectors only review aspects from SFCP approved and implemented risk-informed initiatives.
Performance-based in that sampling will be reviewed and adjusted annually until issuance of final 50.69 OpESS NFPA 805 recommendations.
x
- WG will provide inspectors with guidance (insights/specifics) on appropriate use/utilization of the OpESS.
5
Applicable OpESS Inspections PRIMARY Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111
- 71111.06, Flood Protection Measures,
- 71111.13, Maintenance Risk Assessments and Emergent Work Control
- 71111.18, Plant Modifications (Primary)
- 71111.24, Testing and Maintenance of Equipment Important to Risk.
- 71151, Performance Indicator Verification
OpESS Proposed Details
- 1. Verify processes are in place to maintain risk-informed decisions, (i.e., new information and data).
- 2. Verify processes are in place to ensure the PRA is maintained with the as-built as operated plant.
- 3. Verify significant modifications to the plant screened for review and any needed updates to the PRA and the Model of Record.
- Guidance can be applied in 2-stages:
- 1. Forward looking (future changes) and,
- 2. Backward looking (past completed changes, e.g., last MOR change/inspection etc.).
- Intent would be to revise the OpESS for the subsequent ROP Cycle (2025) based upon observed performance (2024) and refocus, as necessary.
7 7
OpESS Proposed details (cont.)
Inspections which would focus on completed changes (i.e., backward-looking):
- 2. 71111.21N.05, Fire Protection Team Inspection (FTPI),
- 3. 37060, 10 CFR 50.69 Risk-Informed Categorization Inspections which would focus on current in-progress changes (i.e., forward-looking):
Resident Baseline: 71111, (with latitude for possible interactions)
- 1. 71111.06, Flood Protection Measures,
- 2. 71111.13, Maintenance Risk Assessments and Emergent Work Control,
- 3. 71111.18, Plant Modifications (Primary),
- 4. 71111.24, Testing and Maintenance of Equipment Important to Risk,
- 5. 71151, Performance Indicator Verification,
Near-term Actions - OpESS Finalize OpESS guidance (Ongoing - Expected Nov/Dec 2023)
Internal Communication/Awareness (Ongoing - Fall/Winter)
- Training and Communication with Inspectors (Ongoing - Fall/Winter)
Enforcement/Significance Determination Process
- Initiate Cross Regional Panel Process (Complete)
- Develop Screening Guidance (Ongoing - Fall/Winter)
Continue External Communication/Awareness (ROP Bi-Monthly) 9