September 14, 2023 Annette Pope Plant Manager Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061

SUBJECT:

COLUMBIA FUEL FABRICATION FACILITY - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Ms. Pope:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Columbia Fuel Fabrication Facility in calendar year 2024.

The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Thomas Vukovinsky at (404) 997-4622 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Michel, Eric on 09/14/23 Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07001151 License No. SNM-1107

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

ML23256A104 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME T. Vukovunsky J. Rivera Ortiz E. Michel DATE 09/13/2023 09/13/2023 09/13/2023 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR COLUMBIA FUEL FABRICATION FACILITY Dates Number of Description/Inspection Procedures (IPs)

Inspectors February 5 - 9 1 Nuclear Criticality Safety 1 (IP 88015)

April 22 - 26 2 Operational Safety 1 (IP 88020)

May 20 - 24 3 Evaluation of Exercises and Drills (IP 88051)

August 19 - 23 3 Plant Modifications - Triennial (IP 88072)

September 16 - 20 1 Nuclear Criticality Safety 2 (IP 88015)

October 7 - 11 3 Radiation Protection (IP 88030)

Transportation (IP 86740)

November 18 - 22 2 Operational Safety 2 (IP 88020)