ML23255A291

From kanterella
Jump to navigation Jump to search
Urenco USA - Inspection Schedule for Calendar Year 2024
ML23255A291
Person / Time
Site: 07003103
Issue date: 09/13/2023
From: Mathis R
NRC/RGN-II/DFFI
To: Padgett W
Louisiana Energy Services, URENCO USA
References
Download: ML23255A291 (1)


Text

September 13, 2023 Mr. Wyatt Padgett Compliance and Licensing Manager Louisiana Energy Services dba Urenco USA (UUSA)

Urenco USA P.O. Box 1789 Eunice, NM 88231

SUBJECT:

URENCO USA - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Mr. Padgett:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Urenco USA (UUSA) facility in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Timothy Sippel at (404) 997-4525 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Mathis, Robert on 09/13/23 Robert Mathis, III, Chief (Acting)

Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07003103 License No. SNM-2010

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

W. Padgett 2

SUBJECT:

URENCO USA - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024 Dated September 13, 2023 DISTRIBUTION:

A. Masters, RII S. Bazian, NSIR L. Pitts, RII J. Rowley, NMSS R. Mathis, RII S. Lav, NMSS T. Sippel, RII P. Startz, RII R2EICS ADAMS ACCESSION NUMBER: ML23255A291 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME T. Sippel T. Vukovinsky R. Mathis DATE 09/12/2023 09/12/2023 09/12/2023

2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR URENCO USA Number of Dates Description/Inspection Procedures (IPs)

Inspectors February 12 - 16 2 Operational Safety 1 (IP 88020)

March 18 - 22 2 Radiation Protection (IP 88030)

Emergency Preparedness (IP 88050)

April 8 - 12 2 Nuclear Criticality Safety 1 (IP 88015)

April 22 - 26 2 Material Control and Accountability (Various IPs)

May 20 - 24 2 Information Security (Various IPs)

June 10 - 14 2 Physical Security (Various IPs)

June 24 - 28 2 Fire Protection (IP 88055)

Nuclear Criticality Safety 2 (IP 88015)

October 28 - November 1 2 Operational Safety 2 (IP 88020)

Enclosure