ML23242A150
Jump to navigation
Jump to search
| ML23242A150 | |
| Person / Time | |
|---|---|
| Site: | Triso-X |
| Issue date: | 08/30/2023 |
| From: | NRC/NMSS/DFM/FFLB |
| To: | |
| Shared Package | |
| ML23242A149 | List: |
| References | |
| Download: ML23242A150 (1) | |
Text
Enivironmenta1I Impact Revi1ew Schedule 2022 202,5 2026 2.1 Scopir11
- 2.
r.;;ft EIS 2.3 Dr,3Jft EIS Comme t Perio I
Fi al ElS 2.5 E
Nr:tifiG3ti oda ID Sta End
% comp-lete Ab hrev i.ati on;;
~
2.,
9/23/2022 100%
EIS = Em *rorli'e ral Impact State e t 2.1 8/31/2022 12/30 80%
E A = E iro 1enta Protection Agency 2.2 3/1/2023 2/28/2024 E = Envirorme tal Repo 34 day'~
2.3 3/1/202 5/1/.202 61 days
- 2.
5/1/202 3/ 31/2025 334 days 1%
2.5
/1/2025 5/1/.2025 30 days 0%