ML23229A004

From kanterella
Jump to navigation Jump to search
SLR Guidance Update Public Meetings Slides - 8-22-2023 Structural
ML23229A004
Person / Time
Issue date: 08/22/2023
From: Carol Moyer, Sayoc E
NRC/NRR/DNRL/NLIB
To:
References
Download: ML23229A004 (1)


Text

Subsequent License Renewal Guidance Update GALL-SLR/SRP-SLR Notable Proposed Revisions Structural U.S. Nuclear Regulatory Commission Emmanuel Sayoc, Carol Moyer August 22, 2023

=

Background===

General Reminders

  • Public comment period 7/11/23 to 9/11/23.
  • Purpose of this meeting is o to interact with the public regarding SLR Guidance o to provide an overview of the revision process and significant updates o to offer recommendations on how to best formulate comments to facilitate staff adjudication or resolution.
  • No Staff decisions, findings, or commitments to be made during these public meetings.
  • Comments should be submitted in writing with sufficient detail, justification or explanation.

o Mark up of proposed changes is highly recommended 3

Submission of Comments

o Submit comments online.

  • Alternate Method o Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.

  • Deadline September 11, 2023 4

Guidance Documents for Subsequent License Renewal (SLR)

o Published Dec 2017, ML17362A126 o Supplement 1, Draft for Comment, Published July 2023, ML23180A208 Public Comment Period: 7/11/23 to 9/11/23 5

Bases for Updates to SLR Guidance Documents

  • Revised and new guidance based on:

o New or updated industry guidance, and Codes and standards o Plant operating experience o Research o To fill gaps or make technical revisions in guidance identified from previous SLR reviews

  • Substantive corrections
  • Incorporate completed SLR-ISGs since initial SLR guidance development.

6

Summary of Notable Proposed Revisions (Structural)

Incorporation of Completed Interim Staff Guidance (ISGs)

  • Structural ISG (SLR-ISG-2021-03-STRUCTURES) issued 2/18/2021 (ML20181A381) 8

AMP XI.S6 Structures Monitoring

  • Added wooden poles as a structural component requiring an aging management review.

o based on the review of recent SLRAs, o due to the service life of wooden poles

  • Changes to the SRP-SLR and GALL-SLR Report provide guidance on adequate management of aging effects in wooden poles
  • Recommend a further evaluation to help determine applicable inspection method and frequency of inspection for the wooden poles.

AMP XI.S6 Structures Monitoring, XI.S7 Inspection of Water-Control Structures

  • Redefined Chapter IX environments to include raw water, groundwater, or soil (aggressiveness defined by pH level, chlorides level (ppm), and sulfates level (ppm).
  • Update XI.S6, Structures Monitoring, Detection of Aging Effects program element to add reinforced concrete structural fire barriers (walls, ceilings, and floors) for visual inspection in accordance with GALL-SLR Report AMP 10 XI.M26.

Questions and Discussion 11