ML23229A003

From kanterella
Jump to navigation Jump to search
SLR Guidance Update Public Meetings Slides - 8-22-2023 Electrical
ML23229A003
Person / Time
Issue date: 08/22/2023
From: Carol Moyer, Sayoc E
NRC/NRR/DNRL/NLIB
To:
References
Download: ML23229A003 (1)


Text

Subsequent L i c ense Renewal Gui dance Update GALL-SLR/SRP-SLR Notable Proposed Revisions Electrical

U.S. Nuclear Regulatory Commission Emmanuel Sayoc, Carol Moyer August 22, 2023

Background

General Reminders

  • Public comment period 7/11/23 to 9/11/23.
  • Purpose of this meeting is o to interact with the public regarding SLR Guidance o to provide an over view of the revision process and significant updates o to offer recommendations on how to best formulate comments to facilitate staff adjudication or resolution.
  • No Staff decisions, findings, or commitments to be made during these public meetings.
  • Comments should be submitted in writing with sufficient detail, justification or explanation.

o Mark up of proposed changes is highly recommended

3 Submission of Comments

o Submit comments online.

  • Alternate Method o Mail comments to: Office of Administration, Mail Stop: TWFN A60M, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, AT TN: Program Management, Announcements and Editing Staff.

  • Deadline September 11, 2023

4 Guidance Documents for Subsequent License Renewal (SLR)

  • Revision 1, Draft for Comment, published July 2023, ML23180A191
  • Revision 1, Draft for Comment, Corrected Tables 3.1 -1 and Table 3.2-1, published August 2023, ML23213A036
  • Supplement 1, Draft for Comment, Published July 2023, ML23180A208

Public Comment Period: 7/11/23 to 9/11/23

5 Bases for Updates to SLR Guidance Documents

  • Revised and new guidance based on:

o New or updated industry guidance, and Codes and standards o Plant operating experience o Research o Treviewso fill gaps or make technical revisions in guidance identified from previous SLR

  • Substantive corrections
  • Incorporate completed SLR-ISGs since initial SLR Guidance development

6 Summary of Notable Proposed Revisions (Electrical)

Incorporation of Completed Interim Staff Guidance (ISGs)

  • Electrical ISG (SLR-ISG-2021 ELECTRICAL), issued 2/18/2021 (ML20181A395)

8 AMP X.E1, Environmental Qualification of Electric Equipment

  • Revise the Program Description for Scope of Program to include mechanical components associated with electrical equipment, such as gaskets, seals, O-rings, etc..

AMP XI.E1, Electrical Insulation for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements

  • Revise the Program Description for Detection of Aging Effects to ensure cables and electrical connections are inspected to identify cable and connection insulation coated with fire retardant material installed in an adverse localized environments.

AMP XI.E3c, "Electrical Insulation For Inaccessible L ow -

Voltage Power Cables Not Subject To 10 CFR 50.49 Environmental Qualification Requirements"

  • Remove a paragraph erroneously included in the Program Description fo r Corrective Action in SLR-ISG-2021 ELECTRICAL.

GALL-SRP-SLR Scoping and Screening Section 2.5.2.1.1, Components within the Scope of Scope of Station Blackout

  • Revise to note that alternate current power sources and any cross -tie components that may be stipulated for recovery from station blackout is an example of equipment that is required to cope with a station blackout.

Path Forward

  • Formal comments from all parties are invited, deadline 9/11/23.
  • Formal comments will be addressed prior to finalizing NUREGs.
  • Final draft NUREGs to be presented to Advisory Committee for Reactor Safeguards.
  • Final NUREGs issued, estimate Oct 2024.

13 Questions and Discussion

14