Advanced Reactor Content of Application Project (ARCAP) Interim Staff Guidance (ISG) Documents and Technology Inclusive Content of Application Project (TICAP)
Draft Guide
Purpose
- Provide an opportunity for stakeholders to discuss their comments submitted on the nine Advanced Reactor Content of Applications/Technology Inclusive Content of Applications Interim Staff Guidance (ISG) documents and the Draft Regulatory Guide (DG-1404)
- Comment period closed August 10, 2023
- Comment period was extended from July 10, 2023, based on stakeholder requests
- Only comments that were submitted in response to the May 25, 2023, Federal Register Notices will be discussed in the meeting 2
Background - How to Access Documents and Comments
- All ten documents were reissued in May of 2023 (ADAMS Package No. ML23044A038).
- Table Below provides links to the May 25, 2023, Federal Register Notices and the Regulations.gov Docket IDs ARCAP ISG Title ADAMS Federal Register Regulations.gov Accession # # Docket ID No.
DANU-ISG-2022-01, Review of Risk-Informed, Technology-Inclusive Advanced Reactor ML22048B546 88 FR 33924 NRC-2022-0074 Applications - Roadmap DANU-ISG-2022-02, Chapter 2, Site Information ML22048B541 88 FR 33940 NRC-2022-0075 DANU-ISG-2022-03, Chapter 9, Control of Routine Plant Radioactive Effluents, Plant ML22048B543 88 FR 33930 NRC-2022-0076 Contamination and Solid Waste DANU-ISG-2022-04, Chapter 10, Control of Occupational Doses ML22048B544 88 FR 33936 NRC-2022-0077 DANU-ISG-2022-05, Chapter 11, Organization and Human-System Consideration ML22048B542 88 FR 33928 NRC-2022-0078 DANU-ISG-2022-06, Chapter 12, Post Construction Inspection, Testing and Analysis Program ML22048B545 88 FR 33920 NRC-2022-0079 DANU-ISG-2022-07, Risk-Informed ISI/IST Programs ML22048B549 88 FR 33938 NRC-2022-0080 DANU-ISG-2022-08, Licensing Modernization Project-based Approach for Developing ML22048B548 88 FR 33926 NRC-2022-0081 Technical Specifications DANU-ISG-2022-09, Risk-Informed, Performance-Based Fire Protection Program (for ML22048B547 88 FR 33922 NRC-2022-0082 Operations)
Draft Regulatory Guide 1404, Guidance for a Technology Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, ML22076A003 88 FR 33846 NRC-2022-0073 Certifications, and Approvals for Advanced Reactors 3
ARCAP/TICAP Background
- Guidance for developing and reviewing technology-inclusive, risk-informed, and performance-based non-light water (non-LWR) applications
- Being developed to support 10 CFR Part 50 and 10 CFR Part 52 applications Needed to support expected near-term non-LWR Part 50/52 applications using the licensing modernization project (LMP) process in NEI 18-04, Revision 1
- The NRC staff intends to revise the guidance per the final Part 53 rulemaking language 4
TICAP Background
- TICAP scope is governed by the LMP-based process LMP uses risk-informed, performance-based approach to select licensing basis events, develop structures, systems, and components (SSC) categorization, and ensure that defense-in-depth is considered
- Industry developed key portions of TICAP guidance See NEI 21-07, Revision 1, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Utilizing NEI 18-04 Methodology, (ADAMS Accession No. ML22060A190)
ARCAP Background
- Broad in nature and intended to cover guidance for non-LWR applications for:
combined licenses construction permits operating licenses design certifications standard design approvals manufacturing licenses
- Encompasses TICAP
- TICAP is guidance for off-normal reactor states only. ARCAP encompasses everything needed for a license application.
6
ARCAP and TICAP - Nexus Outline Safety Analysis Report (SAR) - Additional Portions of Application Based on TICAP Guidance
- Technical Specifications
- 1. General Plant Information, Site Description,
- Technical Requirements Manual and Overview
- Quality Assurance Plan (design)
- 2. Methodologies and Analyses and Site
- Fire Protection Program (design)
Information*
- Quality Assurance Plan (construction
- 3. Licensing Basis Event (LBE) Analysis and operations)
- 4. Integrated Evaluations
- 5. Safety Functions, Design Criteria, and SSC
- Security Plan Safety Classification Audit/inspection of Applicant Records
- Cyber Security Plan
- 6. Safety Related SSC Criteria and Capabilities
- Calculations
- SNM physical protection program
- 7. Non-safety related with special treatment
- Analyses
- Fire Protection Program (operational)
- 8. Plant Programs
- System Descriptions
- Radiation Protection Program
- Design Drawings
- Offsite Dose Calculation Manual Additional SAR Content -Outside the
- Design Specs
- Inservice inspection/Inservice testing Scope of TICAP
- Procurement Specs (ISI/IST) Program
- 9. Control of Routine Plant Radioactive
- Environmental Report and Site Effluents, Plant Contamination, and Solid Redress Plan Waste
- Financial Qualification and Insurance
- 10. Control of Occupational Doses and Liability
- 11. Organization and Human-System
- Fitness for Duty Program Considerations
- Aircraft Impact Assessment
- 12. Post-construction Inspection, Testing and
- Performance Demonstration Analysis Programs Requirements
- Nuclear Waste Policy Act
- SAR Chapter 2 derived from TICAP guidance as supplemented by ARCAP interim
- Operational Programs staff guidance Chapter 2, Site Information
- Exemptions, Departures, and
- Safety Analysis Report (SAR) structure based on clean sheet approach Variances )
- Additional contents of application may exist only in the SAR, may be in a separate document incorporated into the SAR, or may exist only outside the SAR. 7
- The above list is for illustration purposes only.
Discussion of Comments 8