ML23206A013

From kanterella
Jump to navigation Jump to search
NRC Region I Twitter Posts from April 1 to June 30, 2023
ML23206A013
Person / Time
Issue date: 07/24/2023
From: Neil Sheehan
NRC Region 1
To:
NRC Region 1
References
Download: ML23206A013 (1)


Text

NRC Region I Twitter posts from April 1 to June 30, 2023

April 5, 2023

NRC Region I inspector Juan Ayala was #OntheJob at the #decommissioning Oyster Creek plant to check on its fire-protection program, including the fire alarm panels in the control room, assessing fire hazard analyses, fire brigade staffing and firefighting procedures.

April10,2023 Were holding a public meeting with Constellation Energy on May 11 at 1:30 p.m.

to discuss a planned work-hours exemption request for the Peach Bottom

  1. nuclear power plant in Pennsylvania.

https://www.nrc.gov/pmns/mtg?do=details&Code=20230288 April 24, 2023

  1. OntheJob and outfitted with everything he needed to inspect the plant safely, Millstone Resident Inspector Eben Allen completed an equipment alignment inspection of the Unit 2 high pressure safety injection system. We conduct this inspection multiple times each year.

May 1, 2023

  1. NRCNews: Weve initiated a Special Inspection at the Calvert Cliffs Unit 1
  1. nuclear power plant to review issues related to an emergency diesel generator at the facility. https://www.nrc.gov/cdn/doc-collection-news/2023/23-003-i.pdf May 18, 2023
  1. NRCNews: Were holding a webinar on June 7 to discuss our annual assessment of safety performance at #nuclear power plants in Maryland, New Jersey, New York and Pennsylvania. https://www.nrc.gov/cdn/doc-collection-news/2023/23-005-i.pdf 5/31/23 Weve published our plan that lays out how well make sure were ready to regulate
  1. ArtificialIntelligence, including boosting staffs understanding of #AI, partnering with organizations, and setting up a consistent framework for reviewing AI applications.

https://nrc.gov/reading-rm/doc-collections/nuregs/staff/sr2261/index.html

June 5, 2023 A reminder that we'll be sharing information on safety performance at 17 Northeast power reactors during a public webinar on Wednesday evening:

https://www.nrc.gov/pmns/mtg?do=details&Code=20230596 June 13, 2023

  1. NRCNews: Were holding a public meeting on June 27 in #Hampton, New Hampshire, to discuss the 2022 safety performance of the #Seabrook #nuclear power plant.

https://www.nrc.gov/cdn/doc-collection-news/2023/23-006-i.pdf June 27, 2023

  1. NRCNews: We have a new senior resident inspector @ the #Seabrook #nuclear power plant in New Hampshire. https://www.nrc.gov/cdn/doc-collection-news/2023/23-007-i.pdf June 30, 2023
  1. NRCNews: We have a new resident inspector @ the Calvert Cliffs #nuclear power plant In Maryland. https:// https://www.nrc.gov/cdn/doc-collection-news/2023/23-008-i.pdf