ML23195A119

From kanterella
Jump to navigation Jump to search
NRC-2022-000106 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML23195A119
Person / Time
Issue date: 06/27/2022
From:
NRC/OCIO
To:
References
NRC-2022-000106
Download: ML23195A119 (1)


Text

03-20-2022 13:59:00 Incident:

Site or Incident Type:

Created:

Event Type:

State:

Facility Type:

H.E.R.O:

Com Type:

U.S. Nuclear Regulatory Commission Operations Center Report fi8A 8PPl81it:t t!IOE OIIL I LIMI I ED 613 I Ribb I IOIQ Tl:is :spoil:@; os::tai:: 111011 c::fs:cc:::c::t sc::siliec" i:11011::atlo::

1211 cs Jo ::st :sla; lltis i::fo::::&lio:: to l::c:tlelc:la&ls

r:ho do oat ha: a a "nu~ 11 I: 1

SID-02764 Millstone 2016-03-24 02 :46 Drone CT Power Reactor - Operating Dong Park Site security observed a drone flyover in the Owner Controlled Area. The drone flew in the South to North direction along the shoreline for about 2 minutes. The closest the drone got to the Protected Area was about 200 yards. The licensee raised their security level to a heightened state of awareness. The Groton airport air tower was not aware of a registered flyover.

The licensee notified the NRC Resident Inspector. Notified R1 DO (McKinley).

This report is open pending ILTAB review. ILTAB will update or close this report when appropriate.

03-20-2022 13:59:00 U.S. Nuclear Regulatory Commission Operations Center Report Page 1 of 1