Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION R. Keith Brown Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05200025/2023403
Dear R. Keith Brown:
On June 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant Unit 3 and discussed the results of this inspection with Glen Chic, Executive Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Vogtle Electric Generating Plant Unit 3.
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.7] - Documentation.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Vogtle Electric Generating Plant Unit 3.
July 18, 2023
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION R. Keith Brown 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05200025 License No. NPF-91
Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Bacon, Daniel on 07/18/23
ML23194A234 (Cover letter)
Cover Letter Only:
X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DRS RII/DRS RII/DRS NAME D. Strickland L. Jones D. Bacon DATE 07/17/2023 07/14/2023 07/18/2023