ENCLOSURE 4 M230073 Updated RAJ-II SAR Revision 11 Change Table Non-Proprietary Information
RAJ-II Safety Analysis Report Revision 11 Change Table Section Description of Change Reason for Change Appendix 1.3 Added the general arrangement drawings.
As requested by NRC.
Section 1.2.2 Revised the first paragraph to delete PWR fuel assemblies.
The RAJ-II package is not designed for any current PWR fuel assembly.
Section 4.5.1.1 Added text to state that the other uranium isotope concentrations are impacted by the change from 5.0 wt% U-235 to 8.0 wt% U-235, but that the concentrations are bounded by the reprocessed feed assumption and corresponding uranium isotope concentrations.
Also added text to state that the activities of the uranium isotopes at 8.0 wt% U235 are considered to be bounded by the reprocessed feed assumption and corresponding uranium isotope concentrations.
Clarification made in response to a request by the NRC.