ML23160A255

From kanterella
Jump to navigation Jump to search
Response to ACRS Letter on the Kairos Non-Power Reactor Hermes Construction Permit Application
ML23160A255
Person / Time
Issue date: 06/20/2023
From: Andrea Veil
Office of Nuclear Reactor Regulation
To: Rempe J
Advisory Committee on Reactor Safeguards
Cuadrado de Jesus S
References
LTR-23-0130-1
Download: ML23160A255 (1)


Text

June 20, 2023 Mrs. Joy L. Rempe, Chairman Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

RESPONSE TO ACRS LETTER ON THE KAIROS NON-POWER REACTOR HERMES CONSTRUCTION PERMIT APPLICATION

Dear Joy Rempe:

By letter dated May 16, 2023, (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML23130A183), the Advisory Committee on Reactor Safeguards (ACRS) reported on its review of the U.S. Nuclear Regulatory Commission (NRC) staffs safety evaluation (SE) and Kairos Power, LLC (Kairos) preliminary safety analysis report for the Hermes non-power test reactor construction permit (CP) application submitted under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities. This CP application describes the preliminary design and analysis of Kaiross proposed non-power test reactor facility, to be located in Oak Ridge, Tennessee. The ACRS undertook this review to fulfill the requirements of 10 CFR 50.58, Hearings and report of the Advisory Committee on Reactor Safeguards, which mandate that the ACRS review and report on CPs for facilities of the type described in 10 CFR 50.21, Class 104 licenses; for medical therapy and research and development facilities, paragraph (c).

In its letter, the ACRS recommended that a CP for Hermes should be approved. Based on information provided to the ACRS and discussions during meetings with Kairos and the NRC staff, the ACRS noted that the following topics should be addressed during the evaluation of the operating license application:

(1) combustible gas generation, associated with graphite-air oxidation, for air ingress events; (2) levels of tritium release from the facility; and (3) management of airborne beryllium and tritium in the facility to less than relevant regulatory limits and to protect the safety of workers. The NRC staff recognizes the ACRS conclusions and recommendations and will ensure there is appropriate review of these topics as part of a future operating license application for Hermes. The NRC staff notes that consideration of beryllium hazards would be focused on the potential for beryllium to impact operator actions during operation or accident response consistent with the agencys authority and regulations.

J. Rempe The NRC staff appreciates the ACRSs timely and thorough review of the Hermes CP application and SE. We thank the Committee for its novel review approach, which focused on the most safety significant aspects of the design and significantly complemented the NRC staffs efforts to optimize the review schedule and ensure that the review was efficient and thorough.

Sincerely, Taylor, Robert signing on behalf of Veil, Andrea on 06/20/23 Andrea D. Veil, Director Office of Nuclear Reactor Regulation cc: Chairman Hanson Commissioner Baran Commissioner Caputo Commissioner Crowell Commissioner Wright

ML23160A255 EDO-002 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/LA NRR/DANU/UAL1/BC (A) NRR/DANU/UTB2/BC NAME SCuadrado DGreene AProffitt CDeMessieres DATE 6/12/2023 6/13/2023 6/13/2023 6/14/2023 OFFICE QTE NRR/DANU/D NRR/D NAME JDougherty MShams AVeil (RTaylor for)

DATE 6/15/2023 6/15/2023 6/20/2023