ADAMS Template: SECY-067 DOCUMENT DATE: 08/29/1988 TITLE: PRM-050-052 - 53FR32913 - MARVIN LEWIS: PETITION FOR RULEMAKING CASE

REFERENCE:

PRM-050-052 53FR32913 KEYWORD: RULEMAKING COMMENTS Document Sensitivity: Non-sensitive - SUNSI Review Complete

STATUS OF RULEMARING PROPOSED RULE: PRM-050-052 RULE NAME: MARVIN LEWIS: PETITION FOR RULEMAXING PROPOSED RULE FED REG CITE: 53FR32913 PROPOSED RULE PUBLICATION DATE: 08/29/88 NUMBER OF COMMENTS: 24 ORIGINAL DATE FOR COMMENTS: 10/28/88 EXTENSION DATE: I I

  • INAL RULE FED. REG. CITE: 55FR33425 FINAL RULE PUBLICATION DATE: 07/17/90 NOTES ON PETITION CONCERNED WITH REINSTATING FINANCIAL QUALIFICATIONS IN OP ATUS ERATING LICENSING PROCEEDINGS. PETITION DENIED BY EDO ON 7/17/90.

RULE TILE LOCATED ON Pl.

TO FIND THE STAFF CONTACT OR VIEW THE RULEMAXING HISTORY PRESS PAGE DOWN KEY HISTORY OF THE RULE PART AFFECTED: PRM-050-052 RULE TITLE: MARVIN LEWIS: PETITION FOR RULEMAXING

.OPOSED RULE PROPOSED RULE DATE PROPOSED RULE SECY PAPER: SRM DATE: / / SIGNED BY SECRETARY: 08/23/88 FINAL RULE FINAL RULE DATE FINAL RULE SECY PAPER: SRM DATE: / / SIGNED BY SECRETARY: 07/17/90 STAFF CONTACTS ON THE RULE CONTACTl: JUANITA BEESON MAIL STOP: P-209 PHONE: 492-8926 CONTACT2: MAIL STOP: PHONE:

DOCKET NO. PRM-050-052 (53FR32913)

In the Matter of MARVIN LEWIS: PETITION FOR RULEMAKING DATE DATE OF TITLE OR DOCKETED DOCUMENT DESCRIPTION OF DOCUMENT 10/11/88 10/06/88 COMMENT OF ECOLOGY/ALERT (E. NEMETHY, SEC'Y) ( 1) 10/11/88 10/06/88 COMMENT OF ECOLOGY/ALERT (E. NEMETHY, SECRETARY) ( 9) 10/24/88 10/20/88 COMMENT OF OHIO CITIZEMS FOR RESPONSIBLE ENERGY (SUSAN L. HIATT) ( 2) 10/27/88 10/24/88 COMMENT OF CANE (MARVIN I. LEWIS) ( 3) 10/27/88 10/28/88 COMMENT OF DUKE POWER COMPANY (ALBERT V. CARR, JR) ( 4) 10/28/88 10/24/88 COMMENT OF MARYLAND NUCLEAR SAFETY COALITION (PATRICIA BIRNIE) ( 5) 10/28/88 10/27/88 COMMENT OF GPU NUCLEAR CORPORATION (J. L. SULLIVAN, JR., DIRECTOR,) ( 6) 10/28/88 10/28/88 COMMENT OF HOPKINS, SUTTER, HAMEL l PARK (JOSEPH GALLO) ( 10) 10/31/88 10/27/88 COMMENT OF LONG ISLAND LIGHTING COMPANY (JOHN D~ LEONARD, JR. , V. P.,) ( 7) 10/31/88 10/28/88 COMMENT OF BISHOP , COOK,PURCELL l REYNOLDS (NICHOLAS S. REYNOLDS) ( 8) 10/31/88 10/28/88 COMMENT OF NUCLEAR MANAGEMENT AND RESOURCES COUNCIL (JOE F. COLVIN) ( 11) 10/31/88 10/27/88 COMMENT OF FLORIDA POWER CORPORATON (ROLF C. WIDELL, DIRECTOR) ( 12) 10/31/88 10/27/88 COMMENT OF YANKEE ATOMIC ELECTRIC COMPANY (ANDREW C. KADAK, VICE PRESIDENT) ( 13) 10/31/88 10/27/88 COMMENT OF PHILADELPHIA ELECTRIC COMPANY (EUGENE J. BRADLEY) ( 14)

DOCKET NO. PRM-050-052 (53FR32913)

DATE DATE OF TITLE OR DOCKETED DOCUMENT DESCRIPTION OF DOCUMENT 10/31/88 10/26/88 COMMENT OF SOUTH CAROLINA ELECTRIC GAS COMPANY (0. S. BRADHAM, V.P.) ( 15) 10/31/88 10/27/88 COMMENT OF GULF STATES UTILITIES COMPANY (J. E. BOOKER, MANAGER-RIVER BEND) ( 16) 10/31/88 10/28/88 COMMENT OF CONSOLIDATED EDISON COMPANY OF N.Y, INC.

(MURRAY SELMAN, SENIOR V. P.) ( 17) 11/01/88 10/26/88 COMMENT OF PHILADELPHIA ELECTRIC COMPANY (JOSEPH W. GALLAGHER) ( 18) 11/01/88 10/27/88 COMMENT OF CONSUMERS POWER (KENNETH W. BERRY, DIRECTOR) ( 19) 11/02/88 10/27/88 COMMENT OF DETROIT EDISON (B. RALPH SYLVIA, SENIOR V.P.) ( 20) 11/04/88 10/28/88 COMMENT OF BECHTEL POWER CORPORATION (A. ZACCARIA, SR. V.P. l DEPUTY) ( 21) 11/04/88 10/28/88 COMMENT OF ILLINOIS POWER COMPANY (D. L. HOLTZSCHER) ( 22) 11/17/88 11/02/88 COMMENT OF TENNESSEE VALLEY AUTHORITY (R. L. GRIDLEY, MANAGER NUCLEAR) ( 24) 11/21/88 11/17/88 COMMENT OF CONNER l WETTERHAHN, P.C.

(ROBERT M. RADER) ( 23) 08/17/90 07/17/90 MARVIN LEWIS: DENIAL OF PETITION FOR RULEMAKING

DOCKET NUMBER PETITION RULE PAM 5£3 - 6:2., ( 63 Ff<. =3 .!l q I 3.,)

urlglna, sent to Otf,ce tht' ii~opy to Secy** * -.... ,

O! th~ federal ~

COC.:KETEO USNRC tor ~UO!l -~* .__.

[Docket No. PRM-50-52]

Marvin Lewis; Denial of Petition for Rulemaking AGENCY: Nuclear Regulatory Commission.

ACTION: Denial of petition for ru lemaking.

SUMMARY

The Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM-50-52) from Mr. Marvin I. Lewis. The petition requests that the Convnission amend its regulations in 10 CFR Parts 2 and 50 to reinstate financial qualifications as a consideration in the operating license hearings for electric utilities. The petition is being denied because it raises no issues that were not previously considered in the rulemaking process that resulted in the Convnission's adoption on September 12, 1984 (49 FR 35747) of a final rule entitled "Elimination of Review of Financial Qualifications of Electric Utilities in Operating License Review and Hearings for Nuclear Power Plants," and because no new circumstances have arisen to warrant a change in the current regulation.

ADDRESSES: Copies of correspondence and documents listed below are available for public inspection at the Co1T111ission's Public Document Room at 2120 L Street, N.W. (Lower Level), Washi ngton, D.C.

FOR FURTHER INFORMATION CONTACT: Darrel A. Nash, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory ColTlllission, Washington, DC 20555, telephone (301) 492-1256.

- 2 The Petition By letter dated June 6, 1988, Mr. Marvin I. Lewis of Philadelphia, Pennsylva-nia, filed with the NRC a petition for rulemaking. The petitioner requested that the NRC rescind the rule that has eliminated financial qualifications from consideration at the operating license stage for electric utilities.

Basis for Request Grounds for the Petition Mr. Lewis states that long-standing operating problems at Limerick I and II and at the Peach Bottom plants have placed a financial burden on the Philadelphia Electric Co (PECo). Mr. Lewis asserts that PECo has admitted being under fi-nancial pressure and that the cost of Limerick I and II has left PECo billions of dollars in debt. Mr. Lewis also asserts that despite the shaky financial condition of the parent utility, Long Island Lighting Company (LILCO), Shoreham was granted a license to operate. He claims that LILCO had admitted that it lacked sufficient monies to pay for decormnissioning of the nuclear power plant, and he is concerned that the financial problems facing PECo will lead to a situation at Limerick II similar to the Shoreham situation (i.e., the shutdown of a nuclear power plant after it reached criticality and its components had become contaminated with radioactivity).

General Solution to the Problem The petitioner generally requests that the NRC reinstate financial qualifica-tion reviews of electric utilities as a part of the operating license review and hearings for nuclear power plants. In addition, the petitioner specifical-ly requests that the NRC suspend the licensing proceedings for Limerick II until the parent utility, PECo, can demonstrate to the satisfaction of the NRC that it is financially qualified to proceed safely with Limerick II and its other nuclear operations.

Summary of Petition Mr. Lewis believes that Limerick II will be issued a license to operate at full power, and then because of PEC0 1 s financial problems and the excess generating capacity in the service area resulting from the plant's operation, PECo will decide to decormnission Limerick II. The petitioner asserts that such action by PECo will expose him and other members' of the public to radiation without any corresponding benefit. Mr. Lewis states that even if the plant stays open, the shipment of radioactive waste will expose him to radiation without any corresponding benefit, and he claims this is a violation of the Atomic Energy Act. Mr. Lewis cites the Atomic Energy Act as the basis for his assertion that the Federal Government is required by law to "protect the health and safety of the public 11 and that the Nuclear Regulatory Commission has been charged with enforcing this mandate.

Petitioner's Proposal The petitioner requests that the NRC amend its regulations in 10 C~R Parts 2 and 50 to reinstate financial qualifications as a consideration in the operating license hearings for electric utilities. To achieve this goal, the NRC would have to revoke the provisions of the final rule entitled 11 Elimination of Review of Financial Qualifications of Electric Utilities in Operating License Review and Hearings for Nuclear Power Plants, 11 adopted on September 12, 1984 (49 FR 35747) and also revoke the provisions of the final rule entitled "Elimination of Review of Financial Qualifications of Electric Utilities in Licensing Hearings for Nuclear Power Plants, 11 adopted March 31, 1982 (47 FR 13750). Part 2 would be amended by revising§ 2.104(c)(4) and paragraph Vlll.(b)(4) of Appendix A to reinstate the language of those provisions*that existed before issuance of the final rule published March 31, 1982 (47 FR 13750). Part 50 would be amended by revising§§ 50.33(f), 50.40(b), and 50.57(a)(4) to reinstate the language of those provisions that existed before issuance of the final rule published March 31, 1982 (47 FR 13750). Finally, the definition of 11 electric utility 11 in

§§ 2.4 and 50.2 would be revoked because it would be unnecessary.

Public Comments on the Petition A notice of filing of petition for rulemaking was published in the Federal Register on August 29, 1988 (53 FR 32913). Interested persons were invited to submit written comments or suggestions concerning the petition by October 28, 1988. The NRC received 21 COIDIB8nts (one was double counted) in response to the notice: 4 from citizens organizations (one of which was sent by the

petitioner); and 17 from industry, industry representative organizations, and industrial associations (two co11Y11ents were received from one organization).

All of the citizens organizations supported the petition, and all of the industry respondents opposed the petition.

The main reasons given for supporting the petition were

1. A utility under financial duress might take short cuts in operation and procedures which could result in accidental releases of radiation.
2. The NRC would be under pressure to allow many questionable sa_fety practices under fear that the utility would crash without these questionable approvals.
3. Unplanned expenses associated with the outages at the Peach Bottom units have greatly weakened PECo's financial stability.
4. PECo's long history of incompetence and irresponsibility ~hould-have been a factor considered by the NRC in licensing Limerick I and II.
5. In adopting the financial qualification regulat1ons, the NRC found that State regulatory commissions would always guarantee utilities an adequate rate of return. That this finding is not correct has been demonstrated in the past by some of these c01m1issions which have denied rate increases requested by nuclear utilities.

The main reasons given for opposing the petition were

1. In adopting the present rule, the NRC found that the regulated nature of its licensees, electric utilities, assured adequate funding for safe power reactor operation through State and Federal ratemaking processes.

The NRC failed to find, at least for regulated electric utility owners of power reactors, any proven link between. its financial qualification review of such licensees and safety.

2. The petition does not demonstrate any rational relationship between the facts asserted (an increase in radiation exposure) and a need to amend the financial qualification rule to require a review at the operating license stage.
3. The *petitioner had the opportunity to comment and did co1M1ent on the proposed rule. The petition appears to be an attempt to reopen consideration of a final rule of the C0111Dission, and this rule has already been the subject of extensive rulemaking proceedings and judicial review.

The petition in reality is an attempt to reopen an individual licensing proceeding.

4. The petition seeks to reopen a previously resolved matter. In general, the courts have held that, absent a showing that new circUBstances have arisen to warrant a change, a regulation validly pro111ulgated by an admin-istrative agency is entitled to finality.
5. There has been no significant change in the ratemaking process or in fundamental economic regulation principles that would warrant the NRC's reconsideration of its 1984 decision.
6. The petitioner appears to be challenging the rinding made in adopting the rule, that is, that utility rate regulatory cormnissions would, without exception, allow prudently incurred costs of safely operating and decommissioning nuclear power plants. The D.C. Circuit Court of Appeals found no fault with the Commission's findings on this issue. The petition does not offer any reasons or supporting facts to show that these conclusions are now erroneous.
7. The NRC has the authority under Section 182a of the Atomic Energy Act and under 10 CFR 50.54(f) to obtain any financial information necessary to

. detennine whether a power reactor licensee's financial situation might e affect the the licensee's ability to continue to operate safely.

8. Most of the rulemaking petition is devoted to the problems of PECo and the licensing of Limerick I and II. The licensing of Limerick I and II is not a generic industry problem. If there are problems at Limerick, there are other, more appropriate means of seeking Commission action.
9. The problems of PECo alleged by the petitioner (such as an inadequate cooling water supply, an excess of generating capacity in the service area, and transfer of qualified operating personnel from one plant to another) do not justify a generic change in the financial qualification rule.
10. Experience has shown that electric utilities have taken appropriate steps to assure the availability of adequate financial resources, even during periods of financial stress, by providing for delay of non-nuclear expenses and by securing additional financing.
11. The financial qualification rule is an inappropriate standard by which to judge the adequacy of a utility's decommissioning fund. The requirements
  • regarding the adequacy of a utility's decommissioning fund for reactors are contained in other NRC regulations.
12. In adopting the present financial qualification rule, 10 CFR 50.33(f),

the Commission expressed its intent to use its inspection/investigation resources to assure that licensees experiencing financial difficulties continue to comply with regulatory requirements necessary for the safe operation of their nuclear power plants .

  • 13. The NRC's fully implemented and often extensive onsite licensee inspection program and its Systematic Assessment of Licensee Performance process provides direct information regarding the achievement of safe levels of operation at each facility, obviating any need for indirect methods of measurement such as the financial situation of licensees.
14. Reintroducing the case-by-case review of the financial qualifications of licensees would interfere with the NRC's move toward standardization.

Reasons for Denial The current financial qualification regulation in 10 CFR 50.33(f) resulted from an extensive rulemaking process that included detailed studies by the staff and the National Association of Regulatory Utility Commissioners (NARUC). It was twice noticed as a proposed rule for comment in the Federal Register (August 18, 1981 (46 FR 41786) and April 2, 1984 (49 FR 13044)) and

  • each time extensive collVllents were received. These comments were evaluated, and the final rules were modified accordingly. All of the concerns relating to financial qualifications expressed in the petition were considered in these earlier proceedings. The final rule was also reviewed by the U.S. Court of Appeals for the D.C. Circuit. 1 Situations such as those alleged to exist at PECo and LILCO were considered in the rulemaking and court review processes.

The portion of the preamble to the present rule entitled 11 Background 11

  • (49 FR 35747; September 12, 1984) provides the basis for the promulgation of the existing regulation. The NRC's findings as set forth in the preamble to the 1984 final rule were adjudged to adequately justify and support that rule. 2 No changes in rate regulatory law have taken place since then, nor is the NRC 1 New England Coalition on Nuclear Pollution v. NRC, 727 F.2d 1127 (D.C. Cir. 1984); Coalition for the Environment, St. Louis Region v. NRC, 795 F.2d 168 (D.C. Cir. 1986).

2 Coalition for the Environment, St. Louis Region v. NRC, 795 F.2d 168, 176 (D.C. Cir. 1,986).

aware of any change in the practices or convnitments of rate regulatory

  • commissions. The petitioner does not identify any changed circumstances; he only states, 11 We are presently faced with the very problems which I stated or predicted in my 5-28-84 conments on the rule. 11 This argument is clearly an attack against the basis of the rule and does not arise from new or changed circumstances.
    • The petition alleges financial and other problems of two individual licensees, Philadelphia Electric Company and Long Island Lighting and Power Company.

Rulemaking is an inappropriate process for dealing with these problems of individual licensees.

Because.the petition presents no information not previously considered and because there are no new circumstances, the NRC has denied this petition.

Dated at Rockville, Maryland, this /1~ di1Y of J,,7 , 1990 For the Nuclear Regulatory Commission.

s . Taylor ive Director for Operations

DOCKl:T NUMBER .. . _

pETf, ION RULE PRM =0-.52 t@

TENNESSEE VALLEY AUTHORITY ,5~/<3;,t:;/$

CHATTANOOGA, TENNESSEE 37401 SN 157B Lookout Place

  • aa NOV 17 A11 :23 NOV 021988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

NUCLEAR REGULATORY COMMISSION (NRC) - PETITION FOR RULEMAKING: FINANCIAL QUALIFICATION The Ten.lessee Valley Authority (TVA) has reviewed and is pleased to provide comments on the petition for rulemaking, PRM 50-52, noticed in the August 29, 1988 Federal Register (53 FR 32913).

TVA believes that the considerations taken into account by NRC in publishing its final rule dated September 12, 1984, to eliminate the financial qualification from consideration during the operating license review, are still applicable today.

In addition, we want to emphasize the following specific comments:

1. NRC still possesses the authority under Section 182a of the Atomic Energy Act of 1954 to review the adequacy of a licensee to operate a nuclear facility, including the financial qualification of the utility, at any time.
2. Reinstatement of this regulation would be in direct conflict with the NRC's well considered efforts to streamline the licensing process while remaining committed to *a ssuring the safe operation of nuclear facilities.
3. NRC's inspection and enforcement program is a more direct and efficient way of assuring operating safely than a review of a utility's finances.

On the basis of the above comments, we request the petition be denied. We appreciate the opportunity to comment.

Very truly yours, AUTHORITY R. L. Gridley, Manager Nuclear Lice ing and Regulatory Affairs cc: See page 2 FEB 2 1 1989, An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission NOV 02 1988 cc: Ms. S. c. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission one White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta street, NW, suite 2900 Atlanta, Georgia 30323

DOCKET NUMBER  ::;v _ s ;z_

PE TITION RULE pf.M t:>

FFICES 53 'F~3;;913 CONNER & WETTERHAHN, P.C. ,H 1747 PENNSYLVANIA AVENUE, N. W.

WASHINGTON, D. C. 20006 TBOY B. CONNER, JR .

MARK J. WETTERHAHN ROBERT M. RADER

  • aa NOV 21 PS :33 NILS N. NICHOLS BERNHARD 0-BECHHOEFER O:P COUNSEL November 17, 1988 * .... 1 , (2021 833*31500 11'(:f. --
  • *.ll - CABLE ADDRESS: AT0MLAW Samuel J. Chilk, Secretary United States Nuclear Regulatory Commission Washington, D.C. 20555 Re: Notice of Receipt of Petition for Rulemaking by Marvin I. Lewis, Docket No. PRM-50-52

Dear Mr. Chilk:

Because of its potential impact upon Niagara Mohawk Power Corporation, and all Commission facility licensees, the Corporation has requested our firm to respond to the Notice of Receipt of Petition for Rulemaking submitted by Marvin I. Lewis, published by the Nuclear Regulatory Commission ("Commission" or "NRC") on August 29, 1988 ..!/

As stated in the Notice, the Lewis Petition requests the Commission to amend its regulations under 10 C.F.R. Parts 2 and 50 to reinstate financial qualifications as a consideration in hearings on the issuance of an operating license for a nuclear power reactor. Although the petition does not fully describe Mr. Lewis' participation in NRC proceedings related to the financial qualifications issue, his prior involvement is in fact quite re l evant to the petition. In particular, the Commission should focus on Mr.

Lewis' participation in the proceeding which led to the

!/ 53 Fed. Reg. 32913 (1988). The Commission stated that it would consider comments filed after expiration of the formal period for comments if practical. Niagara Mohawk respectfully requests the Commission to consider its views, which it believes will be helpful in the disposition of this matter.

Acknowledged by card FEB 2 1 1989

          • Ill*-** I* . ,...,,.._._

,. MMISSIO c; CTI N

-.y

Samuel J. Chilk November 17, 1988 Page issuance of a full-power operating license for Limerick Generating Station, Unit 1 on August 8, 1985.I/

Background

The NRC received a petition to intervene in the operating licenses proceeding from Mr. Lewis on September 8, 1981. The presiding Atomic Safety and Licensing Board determined that Mr. Lewis had an interest sufficient for standing and admitted him as an intervenor.I/

Subsequently, the contentions admitted on behalf of Mr.

Lewis were withdrawn or resolved against him.4/ Mr. Lewis later sought admission of two other contentions related to emergency planning, which were denied.1/ In the interim II See Philadelphia Electric Company (Limerick Generating Station, Units 1 and 2), CLI-85-15, 22 NRC 184 (1985).

As the Commission is aware, appeals from the issuance of the license were filed by two intervenors in the United States Court of Appeals for the Third Circuit and are still pending decision at this time. No appeal, however, was filed by Mr. Lewis.

Limerick, LBP-82-43A, 15 NRC 1423, 1435-36 (1982). The Licensing Board admitted two safety contentions challenging the adequacy of the Limerick reactor design (id. at 1504, 1508), and another contention challenging the adequacy of the Applicant's quality assurance program (id. at 1517).

Lewis safety contention I-55 was consolidated with another contention admitted on behalf of another intervenor, which later dropped the contention. See Limerick, LBP-83-39, 18 NRC 67, 69 (1983). Lewis safety contention I-62 was decided against him by summary disposition. See Limerick, Docket Nos. 50-352 and 50-353, "Memorandum and Order" (November 15, 1983),

recon. denied, "Memorandum and Order" (December 7, 1983). Contention VI-1 on quality assurance was pursued by another intervenor. Mr. Lewis did not participate in the hearing resulting in a finding against this contention. See Limerick, LBP-84-31, 20 NRC 446, 509 (1984).

Limerick, LBP-84-18, 19 NRC 1020, 1030-34 (1984). Mr.

(Footnote Continued)

Samuel J. Chilk November 17, 1988 Page between the dismissal of the safety contentions and the denial of off-site emergency planning contentions, Mr. Lewis filed an additional petition as the "legal representative" of Citizen Action in the Northeast ("CANE").

In the CANE petition, Mr. Lewis discussed the Connnis-sion's actions in eliminating financial qualifications review for the licensing of nuclear power reactors. He noted that the Commission had proposed to amend its rules to eliminate individualized reviews for electric utilities in early 1982,6/ and that he had "proceeded to contest, in a very limited way, the financial qualifications of Philadelphia Electric" to operate its Limerick plant before the Pennsylvania Public Utility Commission.7/ The Commission thereafter adopted the proposed rule, which eliminated the financial qualification review requirement for electric utilities by adopting a new 10 C.F.R.

§50.33(f).

A challenge to the new rule, however, resulted in a decision by the United States Court of Appeals for the District of Columbia on February 7, 1984 which invalidated the rule for failure to provide an adequate explanation of its purpose and basis in law.8/ The Court of Appeals nonetheless provided the NRC- with an opportunity to reinstate its rule with a satisfactory statement of its purpose and basis.

As a representative of CANE before the Licensing Board, Mr. Lewis cited the Court's remand decision as grounds "to file this challenge to PECO' s financial qualifications to operate and decommission Limerick Generating Station Units 1 and 2."1/ In a ruling issued March 15, 1984, the Licensing (Footnote Continued)

Lewis did not appeal the denial of these two contentions.

6/ See 47 Fed. Reg. 13750 (1982).

21 Limerick, Docket Nos. 50-352 and 50-353, CANE Petition at 1 (March 5, 1984).

~/ New England Coalition on Nuclear Pollution v. NRC, 727 F. 2d 1127 (D.C. Cir. 1984).

11 Limerick, Docket Nos. 50-352 and 50-353, CANE Petition at 2 (March 5, 1984).

Samuel J. Chilk November 17, 1988 Page Board denied the Lewis/CANE petition, citing the directive of the Commission in its statement of policy excluding such contentions pending development of a new financial quali-fications rule.10/ Neither CANE nor Mr. Lewis on its behalf appealed the ruling of the Licensing Board.

Thereafter, the Commission proceeded to act on the invitation by the Court of Appeals to clarify the purpose and legal basis for its rule eliminating individualized financial qualifications review. In a newly proposed rule, the Commission distinguished between applications seeking operating licenses and those seeking construction permits, retaining its financial qualifications review only for the latter category.l.!_/

Following the customary notice and comment period, the Commission adopted the rule as stated in its present form.

Challenges to the revised rule by others than Mr. Lewis were again filed in the United States Court of Appeals for the District of Columbia, which upheld the regulation.g/

Reasons for Denial of the Petition

1. Finality of review should be respected. Although nominally phrased as a request to rescind the existing rule on financial qualifications review, the Lewis petition merely questions the wisdom of the Commission's original action and seeks to reopen a closed rulemaking proceeding.

We do not respond to the factual allegations by Lewis against the Philadelphia Electric Company, but the Supreme Court has admonished against even considering such allegations as a basis for reopening a completed agency proceeding. Quoting with approval from an earlier case, the Supreme Court in Vermont Yankee reiterated the important principle of finality of administrative review:

Administrative consideration of evidence . . . always creates a gap Limerick, Docket Nos. 50-352 and 50-353, "Order Confirming Miscellaneous Oral Record Rulings" (March 15, 1984).

_!l/ See 49 Fed. Reg. 13044 (1984) .

..!+/-/ Coalition for the Environment v. NRC, 795 F.2d 168 (D.C. Cir. 1986).

Samuel J. Chilk November 17, 1988 Page between the time the record is closed and the time the administrative decision is promulgated [and, we might add, the time the decision is judicially reviewed] * * . . If upon the coming down of the order litigants might demand rehearings as a matter of law because some new circumstance has arisen, some new trend has been observed, or some new fact discovered, there would be little hope that the administrative process could ever be consummated in an order that would not be subject to reopening.QI At one time or another, the lower federal courts and the Commission's adjudicatory boards have implemented this salutary rule of administrative law . .!,il It cannot be disputed that all potentially interested parties, including Mr. Lewis (who acknowledges his participation in the 1984 rulemaking), had an adequate opportunity to fully participate in the Commission's proceeding following remand of its financial qualifications review rule. Given the opportunity in 1982 and 1984 to 131 Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 554-55 (1978),

quoting ICC v. Jersey City, 322 U.S. 503, 514 (1944)

(brackets in original) .

.!,ii The United States Court of Appeals for the District of Columbia rejected the premise "that proceedings before administrative agencies are to be constituted as endurance contests modeled after relay races in which the baton of proceeding is passed on successively from one legally exhausted contestant to a newly arriving legal stranger." Easton Utilities Commission v. AEC, 424 F.2d 847, 852 (D.C. Cir. 1970), cited with approval, Gulf States Utilities Company, (River Bend Station, Units 1 and 2), ALAB-444, 6 NRC 760, 797 (1977). See also Union Electric Company (Callaway Plant, Unit 1), ALAB-750A, 18 NRC 218, 1220 (1983);

Cleveland Electric Illuminatin Com an (Perry Nuclear Power Plant, Units 1 and 2, ALAB-443, 6 NRC 741, 750 (1977).

Samuel J. Chilk November 17, 1988 Page object to the Commission's deletion of financial qualifications review for operating license applicants, Mr.

Lewis cannot quarrel with the existing content of the rule.

To entertain a petition to rescind the rule would upset the settled expectations of those who have come to rely upon the rule in violation of the important principle of finality in administrative proceedings, as bespoken by the Supreme Court in Vermont Yankee.

Moreover, allowance of the Lewis petition would effectively negate the 60-day period for seeking judicial review of agency action under the Hobbs Act, 15/ by which Congress has expressly codified the principle of finality.16/ Although he participated in both the financialqualifications rulemaking and specifically raised the issue in the Limerick licensing case, Mr. Lewis appealed neither final agency action by the Commission to the federal courts as permitted by the Hobbs Act.17/ To reconsider the finally adopted rule at this late juncture would excuse, even reward, the failure by Mr. Lewis to act within the time permitted by statute.

For these important reasons, the Commission should not reopen a rulemaking proceeding which resulted in a judicially approved rule following full public participation.

2. No generic issue is gresented. Although an agency may proceed by way of administrative rulemaking or by decisionmaking in individual proceedings, rulemaking is intended to resolve disputed issues of law and to promulgate 28 u.s.c. §2344.

See generally Montana v. Clark, 749 F.2d 740, 744 (D.C.

Cir. 1984), cert. denied, 474 U.S. 919 (1985); Natural Resources Defense Council v. NRC, 666 F.2d 595, 602 (D.C. Cir. 1981); United States Brewers Ass'n, Inc. v.

EPA, 6 0 0 F . 2 d 9 7 4 , 9 7 8 ( D . C. Cir. 19 7 9) .

Indeed, Mr. Lewis did not even appeal the denial by the Licensing Board of his financial qualifications contention on behalf of CANE.

Samuel J. Chilk November 17, 1988 Page policy rules and standards generically applicable to all similarly situated parties.~/

An agency should not utilize rulemaking as a response to a petition which pleads facts alleged to be applicable only to one or two of the agency's many licensees. Thus, Mr. Lewis has shown no cause for amending the Commission's regulation governing financial qualifications review for all reactors on the basis of his allegations (for which he has demonstrated no support whatsoever) as to only a very few.

3. No basis exists for a rescission or modification of the rule. Even assuming that the Cormnission were otherwise inclined to entertain the Lewis petition, it contains no legal, technical or other basis for rescinding or modifying the existing rule under 10 C.F.R §50.33(f). Except for a clarification of the basis and purpose of the rule, the Commission's elimination of financial qualifications review at the operating license stage was judicially upheld in 1984. As noted, the clarification was subsequently approved by the Court of Appeals in 1986. Nothing stated by Mr.

Lewis casts any doubt on the wisdom or correctness of these decisions or upon the policy considerations which initially prompted the rulemaking.

Many cornmentors who opposed adoption of the rule raised questions similar to those in the Lewis petition. Like Mr.

Lewis, these cormnentors speculated that insufficient revenues would be obtained from ratemaking proceedings and predicted resulting adverse effects on safety.19/ But the Commission concluded, based in part on additional infor-mation obtained during staff visits with Public Utility Commissions and other entities, that the "reasonable and prudent costs of safely maintaining and operating nuclear plants will be allowed to be recovered through rates," even though the margin or timing of profits might be affected by adverse ratemaking rulings.~_Q/

SEC v. Chenery Corp., 332 U.S. 194, 202-03 (1947);

United States v. Florida East Coast R. Co., 410 U.S.

---,--,--.,,.....,.-=-----=--=-=-=-=-=-------------------

224, 245 (1973) .

..!.2_/ See 49 Fed. Reg. 35747 (1984).

'}!}_/ Id. at 35749.

Samuel J. Chilk November 17, 1988 Page In short, nothing submitted by Mr. Lewis contradicts the Commission's original conclusion "that ratemaking authorities [have] varying mechanisms to ensure sufficient utility revenues to meet the costs of NRC safety require-ments,"21/ and that "rates are established in general rate cases toproduce sufficient overall revenues to assure sound functioning of the electric power systems, including nuclear plants. "22/ The NRC found the Public Utility Commissions "unanimous in saying that safety-related operating expenses were always considered reasonable expenses when prudently incurred and were allowed to be recovered through rates."'l:]__/

In affirming the Commission's revised rule, the Court of Appeals expressly affirmed these significant rulemaking findings.24/ Mr. Lewis' recitation of alleged financial hardships-facing one or more utilities in operating their nuclear plants, while unsubstantiated, is nothing more than an attempt to perpetuate the now rejected fallayy of a link between nuclear safety and an electric utility's profits.

Far from providing the requisite "reasoned analysis" for rescinding or modifying its financial qualifications rule,~/ Mr. Lewis has provided no basis whatever to support his request, which would represe'nt an abrupt and complete reversal of agency policy.

QI Id.

'l:J:_/ Id. at 35750.

'l:]__/ Id. (emphasis in original). The Commission also relied on a study of investor-owned utilities by National Economic Research Associates, Inc., which analyzed financial incentives in operating a nuclear power reactor and concluded that the financial risks of cutting corners, including the necessity of shutdown and removal from the rate base in case of an accident, far outweigh any financial advantage in cutting corners. Id.

~/ Coalition for the Environment v. NRC, 795 F.2d at 176.

~/ Motor Vehicle Manufacturers Ass'n v. State Farm Mutual Automobile Ins. Co., 463 U.S. 29, 42 (1983). See also AFL-CIO v. Brock, 835 F.2d 912, 917 (D.C. Cir:-I987);

Dal ton v. United States, 816 F. 2d 971, 97 4 ( 4th Cir.

1987).

Samuel J. Chilk November 17, 1988 Page For the foregoing reasons, the Commission should deny Mr. Lewis' petition in its entirety.

Sincerely, tfd-Jh .tflfk_

Robert M. Rader

DOCKET NUMBEf? . u-601296 $)

P ET\TION RULE PR~A .::,"ll-S;2. L30-88(10-28)-Ly

_.---lA.-12_0 i3:m 3::i.91~

( <':. -

  • lll/NOIS POWER COMPANY rm1 l!!:J CLINTON POWER STATION, P.O. BOX '67 __,*. ~(l 4~~*N, ILLINOIS 61727

,.* 1cr*1. .

'88 NOV -4 P4 :01 October 28, 1988 Mr. Samuel J. Chilk Secretary U.S. Nuclear Regulatory Commission Washington, D.c. 20555 Attention: Docketing and Service Branch

Subject:

Comments on Petition for Rulemaking Financial Qualifica tions

Dear Mr. Chilk:

The purpose of this letter is to provide Illinois Power's (IP) comments on the petition for rulemaking on the consideration of financial qualifications of electric utilities in operating license hearings (Docket No. PRM-50-52). The issue of financial qualification was reviewed by the Nuclear Regulatory Commission (NRC) in 1984 when the final rule was published which eliminated the consideration of financia l qualifications during operating license reviews.

Illinois Power does not agree that financial qualifications should be reinstated into the operating licensing hearings for all electric utilities. The arguments used by the NRC in changing the financial qualification rule in 1984 are still applicable. Since the NRC maintains the authority to review a utility's financial qualification at any time, there is no need to revise the existing NRC position on the review of nuclear licensee's financial qualifications in all operating license hearings.

Sincerely yours,

~. ~ . / ~

D. L. Holtzscher Acting Manager -

Licensing and Safety DWW/krm

~cknowit:ageo oy car ?V**********~.1..r..,-......

- S 1989

IJ. S. NUCLEAR REGULATORY COMMIS'SIO DOC:KEilNG & SGRVICE SECTION O,FlCE OF THE $:CRET ARY OF THE COMNdSS ION Pos tr.. *6 ....a'h! / O. - 2,/ -,f' Ct-~!5 il-ei:.ei ~*Ed I

~ .J!:I,' !i <Copies 'R*~:~ - - 3 1~ ~ist,ibufu;,in Jt,:t:- b ~

? ,q7

DOCKET NUMBER " *--,_

PETITIOl'l RULE __PRM ~-S.2.

Bechtel Power Corporatj~JJF:

~3 J-ie 3 ,;2 ? ' 3 Engineers - Constructors Fifty Beale Street San Francisco, California Ma il Address:

.88 .4 P. o. Box 3965, San Franc isco, CA 94119 OFF !L:.. , 1 P4 :QO r .. ,

  • October 28, 1988 OOCKET t * ,,. *-'vl'.r BR NL, 1*

Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Docketing and Service Branch

Subject:

Petition for Rulemaking -

Financial Qualifications 53 FR 32913 (August 29, 1988)

Gentlemen:

The purpose of this letter is to comment on the subject petition for rulemaking. This petition seeks to restore requirements for review of financial qualifications at the operating license stage which were eliminated by the Commission in September, 1984 as part of a prior rulemaking.

Bechtel is opposed to this petition and opposed to the reinstatement of financial qualification reviews at the operating license stage. The same reasons which were cited in support of the 1984 rulemaking (49 FR 35747) are still valid today.

Specifically:

1. Case-by-case review of financial qualifications for all electric utilities at the operating license stage is unnecessary due to the ability of such utilities to recover, to a sufficient degree, all or a portion of the costs of construction and sufficient costs of safe operations through the ratemaking process.
2. A survey of the National Association of Regulatory Utility Commissioners indicated that all ratemaking authorities had mechanisms to ensure sufficient utility revenues to meet the costs of NRC safety requirements.
3. Public Utility Commissioners visited by the NRC were unanimous in agreeing that safety-related operating expenses were always considerred reasonable expenses when prudently incurred and were allowed to be recovered through rates.
4. The NRC retains its residual authority under Section 182a of the Atomic Energy Act of 1954, as amended, to require such additional information in individual cases as may be NOV - 8 1988 ca, 1... * * **
  • 5030

0, S. NUCLEAR R~r.1 11 '

  • DOCKET ING ;, C
  • L OFFICE C' '

<X i '

Postl'!" ;,, I, r. * .

Ccr, I I .. , ....

e,cc ial D
.,1r1 bu ti -:,n fJ't> i

Bechtel Power Corporation Secreta ry U.S. Nuclear Regulatory Commission October 28, 1988 Page Two necessa~ for the Commission to determine whether an application for a license should be granted or denied or whether a license should be modified or revoked.

The NRC maintains the authority to review ~he adequacy of a license to operate a nuclear facility. including the financial qualification of the utility, at any time.

The statutory authority and regulatory responsibilities of the NRC have not changed. There is no need to revise the existing Commission position on the review of nuclear licensee financial qualification.

Bechtel appreciates the opportunity to comment on this petition.

Sincerely, caria s . Vice President and Deputy Manager of Operations AZ:CB 5028

e. Ralph Sylvla Senior Vice President Detroit 6400 North D1x1e Highway Edison Newport, M1ch1gan 48166 (313) 586-4150 NOV -2 P4 :Q8 The Secretary of the Carmission
u. s. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Docketing arx1 Service Branch

Reference:

Fermi 2 NOC Docket No. 50-341 NRC License No. NPF-43

Subject:

Notice of Receipt of Petition for Rulemaking on Financial OUalifications CFR Doc. 88-19542>

The receipt of a petition for rulemaking was noticed in the Augist 29, 1988 Federal Register. The petition requested that the NOC amem its regulations to reinstate financial qualifications as a oonsideration in the operating licensing hearings for electric utilities. Granting of this petition is unnecessary for protection of the health and safety of the public and potentially could be abused.

Each license applicant is required to neet the rules and regulations enacted to protect the health and safety of the pli>lic. The plant is licensed based on a Final Safety Analysis Report and NRC rwiew of the plant documented in Safety Evaluation Reports. As lorg as the utility has the financial capability to neet the regulations enacted to protect the health and safety of the public, it should be licensed.

Review of financial qualification is unnecessary and the financial state of the licensee may var:y depeming on its size and its type (investor-owned utility, cooperative, holding company, nunicipality, etc.)

A potential side effect of granting this petition could be the quest ioning of financial qualifications for operating plants. License changes allow the oi;p>rtunity for hearings. Discussion of financial quali fications oould prolong such hearings unnecessarily and expend considerable resources - both N1C arx1 licensee.

Detroit Edison feels the inportant issue is that licensees have adequate resources to protect the health and safety of the public. If NOY*.- B 198.8

J, :,, NU(ltAI{ R~GUtAlORY COMMISS 0tJ DOCKETING & S&RVICE SECTIO OHlr.:E Of THE S~CRET ARY OF Tl:~ COMMISSION Docurnen* Stal 1st ,cs

'ostmark Date 10 ---.;i.r- - o f

, -l (

3:>

p n ~~~

/J l!J /fl' Ja G~..'l ,r,,.J

' USNRC October 27, 1988 NRC-88-0251 Page 2 the applicant can deIOOnstrate that the pti:>lic health am safety will be adequately protected during license hearings, there is no reason for a detailed examination of financial qualifications.

cc: Mr. A. B. Davis Mr. R. C. Knop Mr. W. G. R:>gers Mr. J. R. Stan;J

DOCl<ET NUMBER ETITIO,\I RULE PRM _6Q- ::5 ~

FA,3:101,,21 I ~

- - - l Jl .. it.-

~,., ,~C consumers Power Kenneth W Berry POWERINli

'88 NOV -1 A10 :49 Director Nuclear licensing IIIICHlliAN'S PRllliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 o {517) 788-16 October 27, 1988 Secretary of the Commission US Nuclear Regulatory Commission Washington, DC 20555

- Atiention: Docketing and Service Branch CONSUMERS POWER COMPANY COMMENTS ON THE PETITION FOR RULEMAKING - REINSTATE FINANCIAL QUALIFICATIONS AS A CONSIDERATION IN THE OPERATING LICENSING HEAR-INGS FOR ELECTRIC UTILITIES.

Consumers Power Company is pleased to offer the following comments on the petition for rulemaking requesting the Commission to amend its regulations in IOCFR Parts 2 and 50 to reinstate financial qualifications as a consideration for the operating licensing hearings for electric utilities as published in the Federal Register on August 29, 1988 (53FR32913) .

Consumers Power Company does not believe it is necessary to reinstate the financial qualifications for the following reasons.

First, the statutory and regulatory responsibilities of the NRC have not changed . The NRC maintains the authority to review the adequacy of a licensee to operate a nuclear facility, including the financial qualifications of the utility at anytime.

Second, the Public Service Commission of Michigan, which is the ratemaking authority within the state assures that safety related operating expenses when prudently incurred are allowed to be recovered through the rates

  • Third, under this proposed change the financial qualifications of a utility could be questioned in a formal hearing for each and every license amendment.

If this were allowed it would create undue expense and time delays in the amendment process .

Nov - 3 100,

-~knowtedged by card .........~..-"".. s'iiil,.

OC1088-0186-NL02

D.S. NUCLEAR REGULATORY COMMISSION DOCKETING & SERVICE SECTION OFFICE OF THE SECRET ARY OF THE COMMISSION Document Statistics Postmark Date _ _L_(l::il,_2 - _,,___ _

Copies Received /

Add' I C-:-pi.::s Reproduced -3

/) .:;:. --=---

Special Oistd:>ution ~

j) ~.......""-:;-,--- - - - - - -

In conclusion, it is very clear that the Commission has the authority under section 182a of the Atomic Energy Act of 1954 as amended, to obtain any information it deems necessary to determine whether an application for a license should be granted or denied or whether a license should be modified or revoked. Because of this authority and the ability for licensees to recover safety related expenses Consumers Power believes there is no need to revise the existing Commission's position.

Kenneth W Berry Director, Nuclear Licensing CC DPHoffman, P26-117B HFCooper, P24-617 KWB 88-61 OC1088-0186-NL02

P'=T' L... I.

'"":~'I  ::'.IIJLE -

,\...*i,. i, PRM V')c} -S;L f;"::, F/l... ~.;z i I ?j PHILADELPHIA ELECTRI C COMPANY 2301 MARKET STREET P.O. BOX 8699

  • aa NOV -1 P3 :31 PHILADELPHIA, PA 19101 (215) 841 -5001 JOSEPH W. GALLAGHER VICK PltKSIDl!NT NUCLll!:AII SEIIVICll!:9 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, o.c. 20555

SUBJECT:

Petition for Rulemaking: Financial Qualifications Gentl emen:

This is in response to the request dated August 29, 1988 (Docket No. PRM-50-52). The petitioner's statement that the shipment of radioactive waste will expose him to radiation without corresponding benefit is without foundation and is presented with no proof whatsoever. On the contrary, it can be easily shown that the shipment of radioact i ve waste from Limerick or any other operati ng nuclear facility results in negligible radiation exposure to the general population.

With respect to the overall mer i ts of this petit ion , we feel that the conditions which existed on September 12, 1984, when the Commi ssion published i ts final Rule on the subject (49 FR 357 47) a r e stil l present. The most significant point uncovered during that investigation was that the Public Utility Commission had mechanisms to ensure that the utilities would recover the costs of the various NRC safety requirements. The Public Utility Commissioners visited by the NRC during this investigation were unanimous in stating that safety-related operating expenses were considered as reasonable expenses and were allowed to be recovered through rates.

The possibil i ty of requiring a financial qual ification investigation for each and every Technical Specification Amendn,ent adds a totally unnecessary degree of complexity and signi ficant expense to the license amendment process. The possibility o f requiring a financial qual i fication hearing for an operating license amendment, which could be as simple as a Technical Specification setpoint change , is unwarranted.

NOV - s 198\\

' ,,, ?d tJ'i \;a rd .***** * * ***.* _. ..

.,

  • vCl.cAP. ~ECULArC~Y COMMISSIOO OC(KETING & SERVICE SECTION OFFICE OF rm SECRETARY OF THE COMMISSION Documant Stat isl ics

?ostmi.r~ 0 1)t11 /6 _-_~~-- f-.:..f _ __

Cojl,es P.c ::; ," * .l /_ _ . ___ __

,f\dd' I CnpiH R~ r ,, , -l _3 S? tial Di.:r;b.tion ~ -"/:> .S..,. ~

October 26, 1988 Page 2 For the reasons we have stated above, we strongly believe that the petition assigned Docket No. PRM-50-52 should be rejected in its e ntirety.

Very truly yours, cc: C. A. McNeil!, Jr.

T. J. Pric e - NUMARC

Murray Selman Senior Vice President f)QCKET NUMBER Consolidated Edison Company of New York, Inc.

4 Irving Place, New York, NY 10003 Telephone (212) 460-6398

  • aa OCT 31 P\2 :19 October 28, 1988
JFF ,L

OOCi~ L ,. , l .r Er !

Mr. Samuel J. Chilk Secretary of the Commission U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Docketing and Service Branch Re: Proposed Amendment to 10 CFR S§2.104(c) (4) and 50.33(f) --

Petition to Reinstate Financial Qualifications Issues in Operat-ing Licensing Hearings (53 Fed.

Reg. 32913, August 29, 1988)

Dear Mr. Chilk:

Consolidated Edison Company of New York, Inc. ("Con Edison"), as owner and operator of Indian Point Units No. 1 and 2, submits the following comments on the referenced petition for rulemaking (the "Petition"), relating to financial qualifications of utility companies. As a Commission licensee, Con Edison has a substantial interest in the Petition because its acceptance and adoption by the NRC could quite possibly require the Company and other regulated public utilities to needlessly address financial qualification considerations in connection with an amendment to, or an application and/or hearing for, an operating license. In addition to these comments, Con Edison endorses the comments submitted to the Commission by the Nuclear Management and Resources Council.

1. There is no occasion for the Commission to reconsider its financial qualifications regulations absent a significant change in circumstance.

In 1984, the Commission exempted utilities from a consideration of financial qualifications during operating license review. 49 Fed. Reg. 35747, September 12 , 1984.

Thereafter, this 1984 rulemaking withstood judicial scrutiny in Coalition for the Environment v. NRC, 795 F.2d 168 (D.C.

Cir. 1986). The present Petition, in referencing supposed NOV - 2 1988

~l( .. ,.,, .. ,pd~ed by card * **,rw,..... :::::;.v:Ziiila

, NU-LEAR RFC: 1 Jl ~ 1()RY C ~MISS r O* 'filN"; P. S,f'V (£ s en.)

l* r* E 0f Tt r ~-,.- fTAR(

')F THE (() I >-~

n l /0 ---:..). r- f _8' I

-3 .

..,.,,1 UII n /J.:J:J::::,..5

? D R.. 1 /!; t:-c ~-a {J

- - - - -r

financial concerns at Philadelphia Electric Company alone as its sole basis for reinstating financial qualifications review, necessarily fails to delineate a factual basis for promulgating a generic rule. In addition, the NRC already has in place procedures adequate for separately reviewing the financial qualifications of each utility-licensee on an individual basis. The Commission should not re-entertain the entire financial qualifications argument; rather, it should rely on its previously well-considered rulemaking, given the lack of changed circumstances and previous judicial ratification of its existing regulations.

2. Financial concerns do not create a basis for inferring an increased likelihood of safety concernsr which would be amply revealed by the Commission's inspection program if they were to arise.

Requiring a utility to demonstrate its financial qualifications requires only a "reasonable assurance of obtaining the funds necessary to meet operating costs".

Coalition for the Environment v. NRC, 795 F.2d 168, 175 (D.C. Cir 1986). The Commission has clearly adopted the view that utilities have the ability to recover the costs of safe operation through ratemaking, as evidenced by the statements made when it exempted utilities from the financial qualifications requirements in its 1984 rulemaking (49 Fed. Reg. 35747, September 12, 1984). In promulgating its 1984 rule, the NRC found that the public utility commissioners it visited unanimously agreed that safety related expenses were always considered reasonable when prudently incurred, and therefore recoverable through rates.

49 Fed. Reg. at 35747. In addition, the NRC's position in its 1984 rulemaking was fully supported by a survey of the National Association of Regulatory Utility Commissioners.

49 Fed. Reg. at 35749.

Furthermore, as the Commission has pointed out,

"[a] financial hazard is not a safety hazard per se." 49 Fed. Reg. at 35759. "[N]either the Commission's regulations nor the Atomic Energy Act mandate *** enforcement proceedings merely because a licensee may be experiencing financial difficulties." Cleveland Electric Illuminating Co. (Perry Nuclear Power Plant, Units 1 and 2), DD-85-14, 22 NRC 635, 637 (1985), quoting Maine Yankee Atomic Power Co.

(Maine Yankee Atomic Power Station ) , CLI -8 3-21 , 18 NRC 157, 1 6 0 (1983 ), aff ' d . DD-83-3, 17 NRC 327 (19 8 3 ) ; Publi c Service Co . o f New Hampshire (Seabrook Station , Unit s 1 and 2), DD 8, 16 NRC 394, 395 (1982 ). In addition , licensees are required to " cease operations if necessary funds to operate safely [are] not available ". 49 Fed . Reg. at 35749 .

The Petition improperly and without justification infers that utilities will ignore this requirement .

In fact , the Commission's fully implemented and extensive on - site licensee inspection program and its Systematic Assessment of Licensee Performance (SALP ) process provides direct information as to achievement of safe levels of operation at each facility . This extensive body of data obviates any need for indirect and inappropriate financial measures of licensee satisfaction of safety standards .

3. Potential decommissioning problems should be dealt with through decommissioning regulations.

The Commission recently published final decommissioning rules at 53 Fed . Reg. 24018 , June 27, 1988.

The Petition again fails to recogni z e the distinction that the Commission has drawn between financial qualifications for operations and decommissioning , which imposes its own self-contained financial requirements . The rule proposed by the Petition here would supplant the decommissioning rules by reviving financial qualification rules no longer in effect .

4. The approach advocated by the Petition would interfere with the Com-mission ' s move towards standardization.

In 53 Fed . Reg . 32060 (August 23 , 1988) , the Commission proposed to standardize certification of nuclear plants to " secure the benefits of a greater degree of standardization and early resolution of issues ." 53 Fed.

Reg . at 32061. Were the Commission to return to a case-by-case financial qualifications review , it would frustrate the benefits sought by the move towards standardization , and add further and unnece s sary complications to a licensing process which the Commission has recognized to be overburdened and is now attempting to consolidate and simplify.

CONCLUSION For the foregoing reasons , the Commission should reject the Petition and leave intact the we ll-considered and judicially-approved rules now in place . Con Edison is pleased to have had the opportunity to comment on this matter.

Respectfully submitted,

~::::?s:::!'----

Senior Vice Pres ident MS : jms DOCKET NUMBER PETITION RULE PRM _..:::,c) -s;i , ~ -

S~F/l~;i,7 , --:=;,.J -~-. **-,

~., L GULF STATES UTILITIES CO.ZWPANY AREA CODE 504 J6 6094 34 1;:,v _ ., _

  • aa OCT 31 P12 :22 OFF !, : ,. * ,:

October 27, IB1r8( [i 11~ * * - ,

RBG- 29102 Bh~hl "

File Code G9. 23 Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555

- Attention: Docketing and Service Branch Gentlemen:

Gulf States Utilities Company {GSU) is pleased to comment on the Conmission's notice of receipt of petition for rulemaking {53FR32913, dated August 29, 1988) that was submitted by Mr. Marvin J. Lewis. This petition requests that the Commission amend its regulations in 10CFR Parts 2 and 50 to reinstate financial qualifications as a consideration in the operating licensing hearings for electric utilities.

On September 12, 1984 {49FR35747), the Conmission published a final rule that eliminated financial qualifications from consideration during the operating license review and hearings for electric utilities. In his petition for rulemaking to the Commission, Mr. Lewis stated, in part, that this final rule prevents the financial condition of a utility from being investigated during license hearings. He further states that the final rule requires the assumption of financial adequacy resulting in several problems that could pose a danger to the public health.

GSU disagrees with Mr. Lewis and is opposed to the August 29, 1988, petition for rulemaking for the following reasons:

1. The NRC maintains the authority to review the adequacy of a licensee to operate a nuclear facility, including the financial qualification of the utility, at any time.
2. The NRC's statutory authority and regulatory responsi-bilities have not changed. There is no need to revise existing Commission position concerning the

- ,view of licensee financial condition.

bv c:mf NO\J - 2 1988

. . . -..-,,--- ~ --~.

' i t' .......

,r* ,., .

't r' )I r: ~

I'

. ~ ... q fj ~

1 "'

. ""'" , e

,n . .~ , ',

.... ~

-. - r' "I

.,_ ~ NUCLEAR RFGUl TORY COMMISSIO~

l" r-DOCKETING & SEP.VICE SECTION OFFl.~E OF THE SECRET AR Y Or n:E COMMISSION '1 PostMark o~,c J g - _;;,_7_:- t'_.(_ _

CopiP.S r;! .,;,* j /

Add' I C"o'*s f * :.. 1 j .3 5pecial D, r*~*u f<._.':Z:"f:> 's: #J>-~ _

-'3~c:.~ 0 ,,J ,,,'~ --

Secretary of Co111T1ission Page 2

3. In the 1984 final rule published September 12, 1984 (49FR35747), the Commission used several persuasive arguments for eliminating the financial qualification from consideration during the operating license review.

GSU supports the Commission's reasoning and believes that several of the arguments used in the 1984 final rule are still applicable today. Some of these argu-ments are:

a) In the third paragraph of the background of the final rule (p. 35748), the Commission states, "The proposed rule on remand was promulgated on the Commission's belief that case-by-case review of financial qualifications for all electric utilities at the operating license stage is unnecessary due to the ability of such utilities to recover, to a suf-ficient degree, all or a portion of the costs of construction and sufficient costs of safe operations through the rulemaking process."

b) The NRC Staff found (p. 35749) that the survey by the National Association of Regulatory Utility Commissioners (NARUC) "lends strong support to the proposed rule. The conclusion that emerged from the study was that rulemaking authorities had varying mechanisms to ensure sufficient utility revenues to meet the costs of NRC safety require-ments, but that all ratemaking authorities had such mechanisms."

c) The Commission found (p. 35750) that the Public Utility Commissioners (PUC) visited by the NRC "were unanimous in saying that safety-related operating expenses were alwa~s considered reasonable expenses when pru ently incurred and were allowed to be recovered through rates."

d) The Conunission believes (p. 35750) "that the record of this rulemaking demonstrates generi-cally that the rate process assures that funds needed for safe operation will be made available to regulated electric utilities. Since obtain-ing such assurance was the sole objective of the financial qualification rule, the Commission concludes that other than in exceptional cases, no case-by-case litigation of the financial qualification of such applicants is warranted."

Secretary of Commission Page 3 e) In Part III, additional information (p. 35751) the Commission, by this rule, "does not intend to waive or relinquish its residual authority under Section 182a of the Atomic Energy Act of 1954, as amended, to require such additional information in individual cases as may be nec-essary for the Commission to determine whether an application should be granted or denied or whether a license should be modified or re-voked."

GSU appreciates the opportunity to comment on this petition for rulemaking.

Sincerely, f *E. ~

J. E. Booker Manager-River Bend Oversight River Bend Nuclear Group JEB/LLD/DHW/KNC/do

South Carolina Electrlc & Gas Company OHie S. Bradham

. P.O. Box 88 Jenkinsville, SC 29065 (803) 345-4040 Vice President Nuclear Operations SCE&G October 26, 1988 A-=iurnCompany DOCKET NUMBER

  • 88 OCT 31 Pl2 :24 PETITION ,iu1~PRM aO-o-:7 Secr etary U. S. Nuclear Regulatory Commission l!:1P;( 3 :J.9/.:b) l,J _

_,,, ;:,i,c,*

Was hington, DC 20555 Attention: Docketing and Service Branch

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Comments on Petition for Rulemaking Gent lemen:

South Carolina Electric & Gas Company (SCE&G) is pleased to provide comments on the Petition for Rulemaking submitted by Mr. Marvin I. Lewis, Docket No.

PRM-50-52. The proposed rulemaking would reinstate the financial qual ification requirements of 10CFR Parts 2 and 50, originally eliminated in September 1984. These requirements would mandate the consideration of the financial condition of a utility during operating license reviews and hearings.

SCE&G believes that the reinstatement of this rule is wholly unnecessary.

The assumptions implicit in Mr. Lewis' Petition for Rulemaking were cogently rebutted when the Commission published the final rule eliminating these fin ancial requirements in September 1984 (49 FR 35747). SCE&G believes that the referenced analysis provides sufficient grounds for denial of Mr. Lewis' Petition.

The following are brief restatements of the key points raised by the Commi ssion in eliminating this rule:

1. The original rule was limited in scope, and its focus was simply the availability of funds, not how they are to be spent. Its limitations are that having a source of funds for safety purposes does not in and of itself assure the funds will be spent for safety purposes and that there is little, if any, correlation between the safety performance of a utility and its financial status.
2. The review of a Licensee's potential misuse of funds for safety purposes is a management integrity concern and is better addressed pre-licensing in a review of a licensee's management, training and technical qualification and post-licensing in the Commission's inspection and enforcement program.
3. A survey of the National Association of Regulatory Utility Commissioners indicates that it is standard practice among all ratemaking bodies to ensure that utilities recover all reasonable costs of safe operation. ~tlV - 2 1988

~cKnow ,edged bi card .* ,._._.,. * -*- - - -

J.5. Nt.: t ~GI A OR~ (qMMl~:>tU1'4 DOCKETING & *cRv1n srcT'ON qr~ T, RY D

Pos tmarl O;, / t; .- ~ /p - f-r Copies Recc- , ,. /

Add'I Cop*<::~ ~, ', -1 _3 _ ___ _

Special Dis ributaon l,_7;Z)_~t PZ>..~_

El:: .5aN

Secretary, U.S. NRC October 28, 1988 1 Page 2

4. The Commission still maintains the authority under 10CFR50.54(f) to require additional information, including financial qualification,
  • *
  • to enable the Commission to determine whether or not its 11 license should be modified, suspended or revoked."

It is clear from the foregoing that the Commission maintains sufficient controls to assure the safety performance of its licensees. Furthermore, the re instatement of the financial qualification rule would in no way enhance the Commission's ability to protect the health and safety of the public given its existing mechanisms of enforcement. SCE&G strongly urges the Commission to deny Mr. Lewis' Petition.

o. S. Bradham c: D. A. Nauman/J. G. Connelly, Jr./0.W. Dixon, Jr./T.C. Nichols, Jr.

E. C. Roberts W. A. Williams, Jr.

M. L. Ernst J. J. Hayes, Jr.

General Managers C. A. Price/R. M. Campbell, Jr.

R. B. Clary K. E. Nodland J.C. Snelson G. O. Percival R. L. Prevatte J.B. Knotts, Jr.

M. D. Blue T. J. Price (NUMARC)

NSRC RTS (PR880031)

NPCF File 811.02 (Folder 2.021) 855.00AA

DOCKET NUMBER

,:::rv-s-~ ~

l Lf-Pr*r L

1*r*10 N RULE PRM

~ Fil 3.2 9J..v PHILADELPHIA ELECTRIC COMPANY ooc;K ET EO U'.':->H-\C 2301 MARKET STREET P .O. BOX 8699

  • sa OCT 31 P12 :14 PHILADELPHIA, PA. 19101 GFFL...

Eugene J. Bradley 12151 84 1-4000 uUCh " '

  • I Vice President and AssoclateGeneratCounsel October 27 , 1988 Samuel J. Chilk, Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Docketing and Service Branch Re: Marvin Lewis Petition for Rulemaking, Docket No. PRM 50-52

Dear Mr. Chilk:

On August 29, 1988, the Commission published a "notice of receipt of petition for rulemaking" submitted by Marvin J. Lewis. See 53 Fed. Reg. 32913 (1988). The petition requests that the Commission "rescTiif" portions of 10 C.F.R. Parts 2 and 50 so as to reinstate pre-1982 requirements that electric utilities applying for operating licenses demonstrate their financial qualifications to conduct the proposed licensed activity. (Petition at 1.)

In response to the Commission's notice, this letter contains the comments of Philadelphia Electric Company ("PECo") on the Lewis Petition.

Background

After giving notice and allowing opportunity for comment, the Commission adopted, in September 1982, a rule which eliminated individualized financial qualifications reviews for electric utilities seeking construction pennits and operating licenses. See 47 Fed. Reg. 13,750 (1982). Several parties filed petitions for review of the new rule before the U.S. Court of Appeals for the District of Columbia Circuit, and on February 7, 1984, that court remanded the rule to the Commission on the grounds that it was not adequately supported by "its accompanying statement of basis and purpose."

See New England Coalition on*Nuclear Power v. NRC, 727 F.2d 1127 (D.C. Cir.

1984).

Meanwhile, on March S, 1984, Petitioner Lewis sought intervention in the Atomic Safety and Licensing Board proceeding reviewing PECo's application for operating licenses for the Limerick Generating Station, Units 1 and 2.

Having already sought intervention in that proceeding as an individual, Mr.

Lewis' March 1984 petition was purportedly filed on behalf of an organization called Citizen Action in the Northeast ("CANE"). Citing the February 1984 court of appeals remand of the Commission's rules eliminating electric NOV - 2 1981 Acknowledged by card .. *,..,... * ..............~~

~- , t 'f A.R ~rC'.11 ATOR Y COMMISSIO...

er l"'l(~TING & SERVICE SECTION

,)F ~1ri: O f -:-. E 5ECRET -\R Y OF r: E COMMl :,SIO N n,arl* D . c 10-~J-'l?t' I

I' I (

3

'ip - ), Dist ri buti o n £::rt::,,S Pi>~

13~..s _{f_/J)  ::_

Samuel J. Chilk, Secretary Page 2 utility financial qualification reviews in operating license application proceedings, the Lewis/CANE Petition proposed the addition of a financial qualifications contention. On March 15, 1984, the Licensing Board issued an order stating that "CANE's contention must be denied at this time on the basis of the Commission's Statement of Policy which instructs us to continue to treat the present rule excluding such contentions as valid." (Order Confirming Miscellaneous Oral Record Rulings, Philadelphia Electric Co.

(Limerick Generating Station, Units 1 and 2), Docket Nos. 50-352-02, 50-353-OL (dated March 15, 1984, pp. 1-2) The Order observed that "the rule(excluding evaluation of financial qualifications) remains valid until (and unless) the Court's mandate is issued" and that the Commission intended "to conduct an expedited rulemaking to add~ess the problems which the court perceived in the present rule." (Id., p. 2)1 In response to the D.C. Circuit remand, on April 2, 1984, the Commission published for comment a new proposed financial qualifications review rule. See 49 Fed. Reg. 13,044 (1984). Therein, the Commission proposed the elimination of case-by-case review of the financ ial qualifications of electric utilities seeking operating licenses but the retention of case-by-case examination of all applicants seeking construction permits. As acknowledged in his pending Petition (p.l), Petitioner Lewis submitted comments on this proposed rule in which he urged the Commission to revert to the pre-1982 rule allowing consideration of financial qualifications in operating licensing proceedings. After reviewing the comments received, the NRC adopted the proposed rule which excluded electric utility financial qualifications issues from individual operating license proceedings. See 49 Fed. Reg. 35,747 (1984). Again, several parties (not including Mr. Lewis) petitioned the D.C. Circuit to review the new financial qualifications rule.

On July 11, 1986, that Court denied the petition, See Coalition for the Environment v. NRC, 795 F.2d 168 (D.C. Circuit 1986}'"; and the Commission's 1984 financial qualifications rule thus remains in effect.

Discussion Petitioner Lewis is attempting through his pending Petition to initiate reconsideration of the Commission's prior rulemaking on financial qualification considerations in the operating license context with the objective of providing him the opportunity to initiate a relitigation of the Commission's final resolution of issues in the Limerick Generating Station operating license proceeding. For the reasons set forth below, the Lewis Petition should be denied.

1/ Final agency action in the Limerick operating license proceeding occurred on June 19, 1987 when the Commission declined review of Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2), ALAB-863, 25 N.R.C. 273 (1987). (See Memorandum to Board and Parties, Philadelphia Electric Co.

(Limerick Generating Station, Units 1 and 2), Docket Nos. 50-352/353 OL, from Samuel T. Chilk, Secretary of the Commission (dated June 25 , 1987).

Samuel J. Chilk, Secretary Page 3 I. CONTRARY TO PETITIONER'S ASSERTION, THE ATOMIC ENERGY ACT DOE.5 NOT REQUIRE THE REQUE.5TED RULBWCING OIANGE.5 Petitioner Lewis appears to assert that the Commission's current rule on the financial qualifications of electric utility operating license applicants is "in violation of" the Atomic Energy Act. (See Petition at 4.)

The D.C. Circuit, however, has already considered and rejected this precise argument in reviewing the rule Petitioner Lewis now seeks to change. In 1985, the challengers of that newly promulgated rule argued that "[t]he Commission's

      • elimination of case-by-case review of [the] financial qualifications [of utility applicants for operating licenses] is 'inconsistent' with the requirements of the Atomic Energy Act." Coalition for the Environment, 795 F.2d at 173-74. The court held that this argument was "without foundation," noting with approval the First Circuit's earlier conclusion that the Atomic Energy Act '"gives the NRC complete discretion to decide what financial qualifications are appropriate."' Id. at 174 (quoting New England Coali tion on Nuclear Pollution v. NRC, 582 F.2d 87, 93 (1st Cir. 1978)) . For the same reason, Petitioner Lewis' assertion is also "without foundation." Id.

II. TIIE PETITIONER HAS PROVIDED NO REASONED ANALYSIS FOR CHANGING THE EXISTING RULE

"(A)n agency changing its course by rescinding a rule is obligated to supply a reasoned analysis for the change." Motor Vehicle Mf rs . Assn 'n v.

State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 42 (1983) . See also St. James Hosp. v. Heckler, 760 F.2d 1460, 1472 (D.C. Cir.), cert. deniecf;-474 U.S. 902 (1985); Sierra Club v. Clark, 755 F. 2d 608, 619 (D.C. Circ. 1985 ); Center for Auto Safety v. Peck, 751 F.2d 1336, 1343 (D.C. Cir.1985) . And in seeking rescission or modification of an existing agency rule, a petitioner is obliged to place before the agency factual support for the requested change. See,

~ , General Motors Co

  • v. U.S. Environmental Protection enc, 738 F.2d 97, 100 3d Cir. 1984 upholding denial of petition to amend rule based on "the lack of specific factual support for petitioners' requested relief").

The Lewis Petition manifests no attempt whatsoever to meet these burdens. In the first place, the Petition is devoid of any substantiated factual assertions. The Petition contains little more than patently misguided assertions founded on mere conclusory speculation. And to the extent (if any) that the Petition can be said to muster any cognizable facts, the Petitioner has f ailed to draw any rational relationship between those purported facts and the rule change he proposes.

For example, the crux of Petitioner's "statement of problem" appears to be that the Commission ' s "financial qualification rule does not allow the financial condition of [a] utility to be investigated during licensing hearings" and that the resulting "assumption of financial adequacy has lead to sever al real problems which lead to unnecessary and unneeded radiation exposures." (P. 1.) Petitioner Lewis, however, then neglects to identify any

Samuel J. Chilk, Secretary Page 4 "real problem." In short, the Petition fails to reference any verified instance in which "radiatioq exposures" have occurred as a result of the rule Mr. Lewis seeks to revise *.Y Most of the Lewis Petition is devoted to making bald (and generally false) assertions about PECo and about its operation of the Limerick Generating Station. Petitioner Lewis recites his opinions about PECo's financial condition and speculates about PECo's chances of fully including Limerick capital costs in its rate base . (Petition at 2.) The Petition, however, does not even attempt to address the crucial question of how these unsupported factual assertions will affect PECo's ability to meet the costs of safely operating Limerick and how the factors cited by the Petitioner should now cause the Commission to reach a conclusion different from the one it reached in its 1984 rulemaking.

In reviewing the Commission's adoption of the challenged rule in 1984, the D.C. Circuit rejected precisely the claim which Petitioner Lewis appears to raise here -- that the NRG should consider the financial qualifications of utility applicants for operating licenses because those utilities will not receive through state utility regulatory bodies the funds necessary to cover the operating costs of nuclear facilities. In examining that claim, the court noted that "members of the Commission staff conducted visits and interviews with officials of various state and federal regulatory commissions to determine their rate setting practices" and that those regulatory commission officials had stated "'without exception that the costs of safely operating and decommissioning nuclear power plants are allowed to be recovered through rates as long as the utility can show that the claimed costs are prudent."' Coalition for the Environment, 795 F.2d at 176 (quoting Commission memorandum). Further, the court observed that '"NRC conversations with ratemaking bodies as well as the results of [a] questionnaire confirm that it is standard practice among ratemaking bodies to factor in the amount of disallowances to ensure that utilities receive enough rate relief when a plant goes into operation to recover all reasonable costs of safe operation."'

Id. (quoting 49 Fed. Reg. 35,749 (1984)).

Notwithstanding the various challenges to the rule in 1984, the D.C.

Circuit found no fault with the Commission's analysis and findings on this issue. The Lewis Petition does not offer any reasons or supporting facts new or old -- to suggest that these prior conclusions of the D.C. Circuit and the Commission must now be deemed erroneous.

2/ Petitioner does cryptically mention Long Island Lighting Co. and the Shoreham facility, but the Petition fails to suggest any relationship between his unsupported assertions about that facility and the rule change he advocates.

Samuel J. Chilk, Secretary Page 5 III. THE PETITION CONSTITIJTF.S AN ABUSE OF THE COM-!ISSION'S PROCEDURES.

The federal courts have made clear that agencies should not be required to tolerate efforts to relitigate previously resolved matters. For example, in Natural Resources Defense Council v. NRC, 666 F.Zd 595 (D.C. Cir.

1981), the Petitioner ("NRDC"), after failing to file a petition for review of certain new NRC regulations within the 60 day period permitted under the Hobbs Act, nevertheless pursued judicial review of the regulations by petitioning the Commission to rescind them after they had been in effect for 17 months.

After the Commission denied the rescission petition, the NRDC sought review by the D.C. Circuit, citing procedural errors in the Commission's denial. The court roundly rejected the NRDC's effort to achieve a change in Commission rules through such a subterfuge, noting that the time limitations on raising objections to agency rules serve[ ] the important purpose of imparting finality into the administrati ve process, thereby conserving administ rative resources and protecting the reliance interest of regulatees who conform their conduct to the regulations. These policies would be frustrated if untimely procedural challenges could be revived by simply filing a petition for rulemaking requesting rescission of the regulations and then seeking direct review of the Petition's denial. Indeed, the implications of the rule of law urged by the NRDC are staggering, for its logic knows no bounds; such a rule would permit procedural challenges to be brought twenty, thirty, or even forty years after the regulations were promulgated. No greater disregard for the principle of finality could be imagined.

Id. at 602. See also State of Montana v. Clark, 749 F.Zd 740, 744 (D.C. Cir.

1984) ("To permit any complainant to restart the limitations period by petitioning for review of a rule *** would eviscerate the congressional concern for finality embodied in time limitations on review."), cert. denied, 474 U.S. 919 (1985). --

This concern about the finality of agency rules is no less important where the challenge to a regulation purportedly has substantive underpinnings. For example, in United States Brewers Ass'n., Inc. v. EPA, 600 F.Zd 974 (D.C. Cir. 1979), the D.C. Circuit stressed that a petition to repeal a regulation can not be used to give (a) court jurisdiction if the petitioner has let the regulation go into effect without availing himself of the right to review which was open to him during the statutory review period *** In other words, denial of a request to repeal cannot open up the merits of a regulation for review in the courts unless review is not previously available, or unless the grounds for the new challenge arose after the initial review period had run.

Samuel J. Chilk, Secretary Page 6 Id. at 978 (citations omitted). See also Nader v. NRC, 513 F.2d 1045, 1054-55 TI>.c. Cir. 1975) (refusing to make untimely "collateral review" of a prior NRC rulemaking proceeding); B. Menzines, J. Stein &J. Gruff, Administrative Law S 15.10, at 15-140 (1988) ("If . . . an agency has conducted a comprehensive rulemaking proceeding, providing opportunity for full public participation, a subsequent petition for modification will not be granted.")

The Lewis Petition is plainly an attempt to reopen consideration of a Commission rule which has already been the subject of extensive rulemaking proceedings and judicial review as a means of providing the opportunity to reopen an individual licensing proceeding. In 1984, Petitioner Lewis had the opportunity to challenge the Commission rule at issue in proceedings before the D.C. Circuit. For whatever reason, he elected not to do so. As the precedents outlined above indicate, both the Commission and the parties regulated thereby have a strong interest in the finality of that rule.

Petitioner Lewis therefore should not now be permitted to mount a tardy challenge to the rule, particularly when the rule has been subjected to ample public comment and judicial re view and when Petitioner i s unable to point to any significant changes in those factors considered by the Commission in adopting the rule in the first place. Petitioner's attempt to reopen discussion of a 4 year-old Commission rule is an abuse of Commission procedures that should not be tolerated.

Conclusion Petitioner has demonstrated neither the need nor a reasonable basis for revising the Commission's financial qualifications rule in the manner requested. Moreover, there are strong reasons for not allowing Petitioner Lewis to manipulate the rulemaking petition process. The Lewis Petition therefore should be denied.

Very truly yours ,

Euge EJB:ss

DOCKET NUMBER Telephone (617) 872-8100

.. P::TIT!CrJ P.UU: t; *1 o--rJ-.:s-< TW X 710-380-76 19@

YANKEE ATOMIC ELECTRIC COMPANY ~a.r~3~"'~  ;*~ "l"'*:-.

n_1t. tI 3

._F,¥.GJ C88-015 G;4J GLA 8 8-119 1671 Wo rces ter Road, Framingham, Massachusags <tt'f 31 P\2 :14

.t October 27, 1988 Secretary of the Commission u.s. Nuclear Regulatory Commission Washington, DC 20555 Attention: Docketing and Service Branch

Subject:

Petition to Reinstate Financial Qualification Issues in Operating Licensing Hearings (53FR329 13)

Dear Sir:

Yankee Atomic Electric Company (YAEC) appreciates the opportunity to comment on the petition for rulemaking regarding reinstatement of financial qualification issues into the operating licensing hearings for nuclear power plants.

YAEC owns and operates a nuclear power plant in Rowe, Massachusetts. Our Nuclear Services Division also provides engineering and licensing services to other nuclear power plants in the Northeast, including Vermont Yankee, Maine Yankee, and Seabrook.

The petitioner has requested the Commission to resume financial qualifications examinations of nuclear power plants seeking operating licenses. The petitioner alleges that exempting electric utilities from such an examination poses a danger to public health and safety.

What the petitioner fails to recognize, however, is that 10 CFR 50.33(f)(4) already affords the Commission the authority and flexibility to examine financial qualifications of an electric utility in those circumstances in which there is a potential relationship to public health and safety.

In light of the Commission's proactive stance on licensing and regulatory reform, we believe that promulgation of regulations that would involve the Commission in activities beyond the scope of public health and safety, as is really being suggested by the petitioner, would be contrary to this philosophy.

Furthermore, the petitioner fails to acknowledge that the Commission has recently promulgated regulations that require licensees to address decommissioning funding as a separate financial qualification activity. Promulgation of additional regulations on this subject would also appear to be unnecessary.

JV - 2 1988

&:k!l.?Wle(jged -by cafd .* *;:c:r.;,,.V'.l

  • .,:.-~-_.._ _

I

,t 0.S. NUCLEAR REGULATORY COMMISSIOt DOCKETING & SfRVI CE SECTION OfflCE O F THE SEl'"RET /\RY OF WE COf.Wl<iSl')N

'ostmark Da le Copic\ R<>r ,1vpJ Ad~ ' (q,ics Re.~ ~ r J _3 S cial Distri ,u *r "a..rl:} --- -

__e___o£.. ,el.___

7

/3 I;? (;:

Secretary of the Commission Page 2 October 27, 1988 As we have stated on other occasions, we urge the Commission to more carefully weigh rulemaking activities and dispense with those of lesser value. It would seem to us that such action would have been appropriate for exactly this rulemaking petition. This petition amounts to a transparent attempt to frustrate the expeditious and meaningful review of operating license

  • applications.

Truly yours, Andrew c. Kadak Vice President JMG/mjc

~*Orn: it..'.

, )~t h '

.88 OCT 31 Pt2 :16 Florida Power CORPORATION October 27, 1988 3Fl 088-20 Samuel J. Chilk U. S. Nuclear Regulatory Commission Secretary Of The Commission Washington, D.C. 20555 Attention: Dock e ting and Service Branch

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Financial Qualifications

Dear Sir:

Florida Power Corporation (FPC) has reviewed the Notice Of Receipt Of Petition For Rulemaking (53 FR 32913, dated August 29, 1988),

requesting the Commission to amend its regulations in 10 CFR Parts 2 and 50 to reinstate financial qualifications as a consideration in the operating licensing hearings for electric utilities.

The Commission published a final rule on September 12, 1984 (49 FR 35747) that eliminated financial qualifications from consideration during the operating license review and hearings for electric utilities. Those arguments used in the 1984 rulemaking resolution are stilJ applicable today. FPC agrees with the Nuclear Management an d Resources Council (NUMARC) that, there is no need to revise the existing Commission position on the review of Nuclear License financial qualification.

Sincerely, Rolf C. Wide 1, Director Nuclear Operations Site Support GMF:RCW:wla Post Office Box 219

  • Telephone (904) 795-3802 A Florida Progress Company

If I I l ->

,. ' ' I ,

J . .S. NUCLEAR ~FG 1 r! A TORY COMMI SSIOO DOCKETING P, ~rl'<VICE SF.CTION OFFICF. C'*F ll-lf S((R[T ARY OF TIIE COMMIS~ION Postmark Dale __ j_ 0 - i1,_ ~ -"-'-/_ _

Copies Received / __

Add' I Cc-o,.,~ Re;:,"',' ,.. ,_.d ._3 Special D1s1nb, ion ~ :Z:-l:) ~

p_ 0 fr..7 _£it:s S6;J., - __ _

G NUCLEAR MANAGEMENT AND RESOURCES C OUNCIL 1776 Eye Street, N.W.

  • Suite 300

[202i 8n-1280 '88 OCT 31 P12 :16 Joe F. Colvln Executive Vice President & October 28, 1988 Chief Operating Officer OFF !L~- .*,

OOCK[ TI .; >.

  • rt*\ .f GkANL ll Mr. Samuel J. Chilk Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Docketing and Service Branch Re: Notice of Receipt of Petition for Rulemaking - Marvin I. Lewis - Docket No. PRM-50 53 FR 32913 (August 29, 1988) - Reguest for Comments

Dear Mr. Chilk:

These comments are submitted on behalf of the Nuclear Management and Resources Council, Inc. ("NUMARC") in response to the request of the U.S.

Nuclear Regulatory Commission ("NRC") for comments on the NRC Notice of Receipt of Petition for Rulemaking, submitted by Marvin I. Lewis, that would seek to rei nstate financial qualifications as a consideration in the operating licensing hearings for electric utilities.

NUMARC is the organization of the nuclear power industry that is responsible for coordinating the combined efforts of all utilities licensed by the NRC to construct or operate nuclear power plants, and of other nuclear industry organizations, in all matters involving generic regulatory policy issues affecting the nuclear power industry. Every utility responsible for constructing or operating a commercial nuclear power plant in the United States is a member of NUMARC. In addition, NUMARC's members include major architect-engineering firms and all of the major nuclear steam supply system vendors.

NUMARC strongly recommends that the Commission deny the petition for rulemaking that would seek to have the NRC amend its regulations to require financial qualification review in operating licensing proceedings for the reasons stated below.

In 1984, the NRC amended its regulations to eliminate the regiment for a financial qualification review to be conducted of electric utilities that are applying for a nuclear power plant operating license if the utility is a regulated public utility or is authorized to set its own rates (49 FR 35747, dated September 12, 1984). The fundamental factors bearing on that decision are as follows:

o The rule was promulgated based on the Commission's belief that a case-by-case review of financial qualifications for electric NOV - 2 1988

OaS. NUCtEAR REGULATORY COMMISSION DOCKETING & SERVICE SECTION OFFICE OF TH£ SECRET ARY OF THE COMMISSIC'N Documer>I Steti~t ics Postmark Oate Copie\ Roccivt,d I Ad.; ' ( .-- p, ,, P.e , 'u ed ...3 Special Di; r u 10n R..Xb-~ --

/) - - e d.,,,.

~11., 1.:::,_ c- C' __ -9 ~ - " - -- - -

utilities at the operating license stage is unnecessary due to the ability of each utility to recover, to a sufficient degree, the costs necessary to support the safe operations if a licensed facility through the ratemaking process.

o The NRC staff found that the survey conducted by the National Association of Regulatory Utility Commissioners (NARUC) provided strong support for the proposed rule. The conclusion of the NARUC study was that all ratemaking authorities had some mechanism, albeit different ratemaking authorities had different mechanisms, such that they could ensure that sufficient utility revenues would be made available to meet the costs of NRC safety requirements.

o NRC discussions with various state Public Utility Commission staffs identified the common belief that safety-related operating expenses were always considered reasonable expenses when prudently incurred and that such expenses were allowed to be recovered through rates.

o The record of the rulemaking proceeding supported the conclusion that the ratemaking process assures that funds needed for safe operation will be made available to regulated electric utilities.

Since obtaining such assurance was the sole objective of the financial qualification rule, the Commission concluded that, other than in exceptional cases, no case-by-case litigation of the financial qualification of operating license applicants was warranted.

o The NRC retains the authority to review the adequacy of a licensee to operate a nuclear facility, including the financial qualification of the utility, at any time.

In its 1984 rule, the Commission clearly stated that it did not intend to waive or relinquish its residual authority under Section 182a of the Atomic Energy Act of 1954, as amended, to require such additional information in individual cases as may be necessary for the Commission to determine whether an application for a license should be granted or denied or whether a license should be modified or revoked.

The statutory authority and regulatory responsibilities of the NRC have not changed. Furthermore, there has been no significant change in the ratemaking process or in fundamental economic regulation principles so as to warrant the NRC's reconsideration of its 1984 decision, reached after searching inquiry and based on the administrative record provided thereby.

We appreciate the opportunity to comment on this matter and would be pleased to discuss our comments further with appropriate NRC staff personnel.

Sincerely, F. Colvin TJP/wdm

DOCKET NUMBER _ ,- ~

... PRM ,£7) -=> -. _,

PETITION RU Lt. - -~~ ,-~ 32. 'j 13)

HOPK I NS, SUTTE R , HAM EL & PARK ooLc!~f,1/~*

(A PARTNERSHIP INCLUDING PROFESSIONAL CORPORATIONS) 888 SIXTEENTH STREET, N .W. , WASHINGT ON , D .C . 2000 6 ( 2 02) 835

~~

0 JlCT ;1.8 P12 :22 TELECOPIER (202) 836-8136 (202) 776 - 1848 TELEX 440374 CHICAGO OFFICE THREE FIRST NATIONAL PLAZA CHICAGO 60602 DALLAS OFFICE 546 EAST JOHN CARPENTER FREEWAY 75062 JOSEPH GALLO (202)835-8082 October 28, 1988 Mr. Samuel Chilk Secretary U.S. Nuclear Regulatory Commission Wash i ngton, D.C. 20555

- Attn: Docketing and Service Branch

Subject:

Petition for Rulemaking Submitted by Mr. Marvin Lewis on June 27, 1988

Dear Mr. Chilk:

The U.S. Nuclear Regulatory Commission (NRC) requested, on August 29, 1988, comments on Mr. Lewis' petition for rulemaking. Mr. Lewis seeks a change in the NRC's regu-lations concerning the financial qualification of holders of licenses for the operation of nuclear power reactors. The regulations, 10 C.F.R. §§ 50.33 and 50.57(a), expressly exempt the owners of nuclear power reactors from the requirement of demonstrating their financial ability to operate their plants in a safe manner and in accordance with license requirements.

Mr. Lewis would revise these regulations by reinstating the requirement for such a showing. Commonwealth Edison Company opposes Mr. Lewis' petition, and I am pleased to submit these comme nts on its behalf.

Prior to 1984, the NRC required that applicants for and holders of operating licenses for nuclear power reactors, among other things, establish and ma i ntain the soundness of their financial conditions in order to assuage any doubt that the monetary resources were available to operate the facilit i es safely for the license terms. The regulatory requirement for licensee financial qualification was examined by the NRC during the course of a rulemaking, which was conducted between 1981 through 1984. The NRC found that the regulated nature of its licensees, public utilities, assured adequate funding for safe power reactor operation through state and federal ratemaking processes.

It was on this basis that the NRC issued, on Septem-ber 12, 1984, the present regulations excluding public utility licensees from the purview of its fina nc i al qual ifi ca i on ov - -

~c!mowledged b}' card ..NO

,. ........ -,:..:.2..........

1988 -

o.s. Nlf(IC/.R_ r.cnr* ~TnR_y r"QMMISSIO~ ..

DO""' ,,r; 11, r:.*r.>v CE srcr10N r E ~:CPE.,. ARY t,\MISSION Post,., r,1 Ccp:,,s _c,,

Add' 1 (, , * *

  • 3 6poc al C;~,r b a._ Tt:>S1/ - --

__b ~ I f3 (=(:F"S. 0 N' _ _

reviews and evaluations. (49 Fed. Reg_. 35747, September 12, 1984). The NRC also examined, during the rulemaking, the r e lationship between a licensee's financial condition and the safe operation of the licensed facility. The NRC failed to find, at least for regulated public utility owners of power reactors, any proven link between its financial qualification review of such licensees and safety.

Mr. Lewis' perceived need for the change t o the NRC's regulations is based on alleged financial problems affecting a particular utility and the proposed operation of two of its nuclear plants. Mr. Lewis, based on his perception, also expresses safety concerns with respect to the operation of these facilities. Mr. Lewis fails to particularize his asser-tions of financial disability, and he fails to link his vaguely articulated safety concerns with those assertions. The peti-tion, obviously, lacks basis; but even assuming the validity of Mr. Lewis' assertions, they do not serve to justify any change 9 to the NRC's regulations.

Section 50.54(f) authorizes NRC to inquire of and ob tain any n e cessary financial information it may n e ed to address the unique case where a power re a ctor lice nsee's financial posture might warrant concern about the licensee"s ability to continue safe operations. This existing authority was recognized by the NRC as being available for this purpose when it promulgated the 1984 regulations. (49 Fed. Reg. 35747, 35751.) Thus, existing regulations adequately permit NRC to inquire with respect to Mr. Lewis' concerns. No change, as suggested by Mr. Lewis, is necessary.

The petition for rulemaking should be rejected for the foregoing reasons. We appreciate the opportunity to present our views.

Sincerely,

~~

Joseph Gallo One of the Attorneys for Commonwealth Edison Company JG/kit ECOL G /ALEUT DOCKET NUMBER BOX 621 f ETIT101}tULE PRM ~ )-..::5 ::l BCOOMSBURG 17815 t,::;F£.. ~c 6! 88 Nem ethy , Sec ' y e: Docket P 52 Sec'y - NRC Petition for rulem~ki~g by 1v1arvin Lewis 88 CET l l p4 :l O ATT: DOCKETING & SERVICE BRANCH Gentlemen -

Despite Mr Lewis ' speculations abo ut the potential sh ut -

down of Limerick 2 (which we'll bet you won't acce pt) ,

he makes a strong case for the necessity for financial stabi lity of utilities involved in nuclear power .

9 we feel you should give his petition a f air hearing ,

admit y ou used poor *,udgment in issuing a final rule on ept 12-d:34 - which elimina ted financial qualifications during licens e review - and rescind tnat ruling

.~nowtedsed by card* * *** .;.. * .... c .... *

  • t"1 l

I 0,5. NUCLE:\R REGULATORY COMMISSIOl\l DOCKETING 8. SERVICE SECTION OH:~ t' OF T~*~ ~~C'~H ARY CF r *-iE COMM1r.~ roN

D8vl f ,.u*; ::~ ~

LAW OFFICES re "iTION RULi=- Pt r,; ~I.,/ ~ -\...J-""')o<

l,=3F,( 3.l.91 ~

BISHOP, COOK, PURCELL & REYNOLDS t:_ 7 1400 L STREET, N.W.

WASHINGTON , D.C. 20005 *3502 (202) 371-5700 WRITER'S DIRECT DIAL TELEX: 440574 INTLAW UI TELECOPIER (202) 371 *5950 October 28,

/

'~

oc, 31 ,9s£ J Mr. Samuel J. Chilk Secretary of the Commission

  • 1' U.S. Nuclear Regulatory Commission Washington, D.C. 20555
'<.l..,.. .

I ; ~,---.n

/ IN' I

Re: Proposed Amendment to 10 C.F.R. §§ 2.104(c) (4) and 50.33(f) -- Petition To Reinstate Financial Qualifications Issues In Operating Licensing Hearings

Dear Mr. Chilk:

On August 29, 1988, the Nuclear Regulatory Commission ("NRC" or "Commission") published in the Federal Register a Petition for Rulemaking filed by Mr. Marvin Lewis. The Petition urges the Commission to amend Federal Regulations 10 C.F.R.

§§ 2.104(c) (4) and 50.33(f), which under ordinary circumstances exempt from an operating license hearing the issue of financial qualifications if the licensee is a regulated public util ity or is authorized to set its own rates. On behalf of Northeast Utilities, System Energy Resources, Inc., TU Electric Company, and Washington Public Power Supply System, we respectful ly submit the following comments in strong opposit i on to the proposed amendments.

1. Summary The proposed amendment would reinstate mandatory financial qualification examinations into NRC operating license reviews and hearings. This would eliminate the current exemption for applicants and licensees that are "electric utilities," i.e.,

entities that are regulated public utilities or are authorized to set their own rates. The reasons asserted in support of the petition, however, fail to implicate any industry-wide safety issues sufficient to warrant such a generic rulemaking amendment. Furthermore, the petition fails to satisfy the requirements necessary for the NRC to consider a plant-specific waiver of the financial qualifications "electric utility" exemption or to justify any other plant-specific action.

NOV - 1 1981 OY<:aflet . " .. ,, ........ -.......,.,

.J .~. I I ~G'J' * !(J ','V C(},\\MISSION DOCK~ ' * & SE-r*v*cr- **F.CTION

.;: TW SEC~~~ .:,RY

COMMISS ION
, , , r C

Ar*

Spe 1 ; : '*

The petitioner first asserts that elimination of financial qualifications inquiries from operating license hearings under normal circumstances "requires the assumption of financial adequacy," that this assumption is invalid, and that in his opinion the unsound financial status of several nuclear power utilities represents a present danger to the health and safety of the public. While offering no substantive proof to support these broad allegations, the petitioner appears to assert that the allegations warrant a reversal of the rationale adopted by the NRC in support of the 1984 amendment which eliminated mandatory case-by-case examination of financial qualifications for electric utilities. We fail to recognize in these broad assertions any substantial argument which would support the reversal of that sound Commission reasoning, which has withstood judicial scrutiny.

The petitioner next alleges several specific factual arguments related to only one electric utility company. First, he alleges that, due to the current shutdown at Peach Bottom, and allegedly "sizeable financial problems" at Philadelphia Electric Company ("PECo"), PECo is using its qualified labor from Limerick on an overtime basis to return Peach Bottom to service, and has thereby exacerbated its already "shaky" financial condition. We fail to discern in this speculation any violation of Commission regulations or other condition sufficient to warrant enforcement action, much less a generic rulemaking. Similarly, the petitioner postulates "a major probability" that the Susquehannah River will provide an inadequate cooling water source for both Limerick plants, which will cause shutdowns and adverse financial results to PECo.

While offering no data in support of these conclusions, the petitioner has apparently categorically ruled out the possibility of alternative water supplies. Once again, we fail to recognize in this conjecture any compromise of NRC safety regulations or any cause for generic rulemaking.

Further, the petitioner asserts that the PECo service area is "grossly overbuilt," and that if Limerick Unit 2 were to come on line there would exist a 60% surplus over peak summer demand for electricity. This leads petitioner to allege that the Pennsylvania Public Utility Commission will be required to classify the Limerick Unit 2 plant as "unnecessary and unneeded" and thus refuse to allow its construction costs into rate base.

As a result, petitioner speculates that capital recovery will become "near[ly] impossible." Not only does the petition fail to offer substantive proof of these allegations sufficient to warrant even plant-specific action, but we fail to detect in these allegations any justification to reverse sound NRC policy through generic rulemaking amendments.

Finally, the petition alleges that the combined effect of the various asserted problems will render PECo unable to finance,,

the predicted decommissioning of Limerick Unit 2. Irrespective of the fact that the petition offers only conjecture to support this prediction, this assertion illustrates yet another misperception of NRC regulations. The petitioner fails to recognize that decommissioning funding has been fully addressed in conjunction with the recently promulgated decommissioning rule, 10 C.F.R. § 50.75.

Mr. Lewis's petition tacitly attacks the presumption that is inherent in the present regulations: that electric utilities will recover through the ratemaking process sufficient costs to assure safe operation. See 49 Fed. Reg. 35747, 35748 at col .. 1.

If Mr. Lewis were successful, and the presumption eliminated, all nuclear utilities -- including licensees of operating plants

-- could be subject to repeated, unwarranted financial qualifications review through the§ 2.206 process.

2. Discussion The petition urges the reversal of the sound Commission policy to eliminate mandatory financial qualifications examinations for electric utilities. The petitioner in essence asserts that the resumption of full-blown financial qualifications examinations would somehow correct the problems which he broadly asserts exist at PECo. Because the petition appears to propose generic amendments to address what are plant-specific safety concerns, however, the petition is fundamentally flawed. Nevertheless, below we discuss both the generic relief requested and the issue of whether any other plant-specific remedial action is warranted.

A. Petition Seeking Generic Amendment The petitioner apparently seeks a generic amendment to 10 C.F.R. §§ 2.104(c) (4) and 50.33(f) which would reinstate mandatory case-by-case financial qualifications examinations in operating license reviews and hearings for all nuclear power plants. The evidence offered in support of this proposal is a series of broad assertions of unsubstantiated financial difficulties at one nuclear power utility. Not only has Mr.

Lewis chosen the improper procedural device to address plant-specific potential safety violations, but he has failed to meet the burden of proof to justify any form of remedial action by the NRC in response to his allegations.

Regarding the proposed generic amendment, the petition appears to challenge the NRC rationale which supports the NRC's amendment to 10 C.F.R. § 50.33(f), which under ordinary circumstances eliminates the issue of financial qualifications from operating license hearings. In his petition, Mr. Lewis

assails the validity of this rationale with the bald assertions that "[t]he rule requires the assumption of financial adequacy" and that this "assumption" is invalid. In eliminating mandatory financial qualifications examinations, however, the Commission explicitly determined that such examinations "did not significantly assist in protecting [the] public health and safety,".l/ and that tne protracted "financial review did little to identify health and,safety problems."Y The Commission premised the exemption upon a determination that "a utility's regulated status ensures that it recovers reasonable costs of operation."Y These determinations are the result of over three years of NRC investigation of the issue of financial qualifications, and have been sustained as supported by "ample evidence" by the D.C. Circuit.y The o.c. Circuit has also ruled that the NRC determinations which support the elimination of case-by-case financial qualifications examinations are "not rendered infirm simply because speculative conditions can be posited under which the funds would not all be available * . *

  • 11 .2./ In the present case, Mr. Lewis has provided scarcely more than speculation that PECo currently suffers from financial difficulties. An assertion of financial difficulties at a nuclear power utility has never alone supported even plant-specific enforcement action by the NRC. We fail to see how such an allegation could successfully be asserted to support generic rulemaking.

Petitioner also fails to recognize that "financial qualifications review, even when case-by-case, never required absolute certainty, only a showing that there was a 'reasonable

  • .l/

Y Maine Yankee Atomic Power station (Maine Yankee Atomic Power Station), DD-83-3, 17 NRC 327, 328 (1983).

Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-84-30, 20 NRC 426, 431 (1984),

citing Financial Qualifications; Domestic Licensing of Production and Utilization Facilities, 46 Fed. Reg. 47, 786 (August 18, 1981). See also Elimination of Review of Financial Qualifications of Electric Utilities in Operating License Review and Hearings for Nuclear Power Plants, 49 Fed. Reg. 35,747, 35,750 (September 12, 1984).

JI Id. at 432. See also 49 Fed. Reg. at 35,750.

Y Coalition for the Environment v. NRC, 795 F.2d 168, 175 (D.C. Cir. 1986) .

.2/ Id.

assurance' of financing the costs of operation."_§/ Furthermore, the Commission's "regulations obviously do not require an applicant to have cash on hand to cover all possible contingencies . . . . "1.J It has been properly observed that

"[w]hen [the] NRC changed its rules, it could not have contemplated that any utility covered thereby would never have financial difficulties or that a State would never deny a utility some of the return it was seeking,"Y or that a regulated utility's financial picture would always be "rosy".V The petition nowhere addresses, in light of these precedents, the specific touchstone issue of "reasonable assurance" at PECo or for the balance of the nuclear industry. We therefore fail to understand how the asserted "financial pressure" at PECo impacts upon the generic financial qualifications exemption contained in 10 C.F.R. § 50.33(f).

Furthermore, the old, mandatory financial qualifications review was always an ungainly and unnecessary process. In this regard, it is not without significance that no electric utility was ever found financially unqualified under "the lengthy and detailed financial review procedures" which the petition urges the NRC to resume . .lQ/ Of further significance is that the NRC rules which required the case-by-case examination of financial qualifications were promulgated in response to national economic conditions which no longer exist. The Commission has explained that the mandatory case-by-case financial qualifications analysis was promulgated during a period of national recession which led to financial difficulties for many utilities.

However, "as the economy later recovered from the recession, the financial conditions of most utilities also improved substantially,"11/ thereby obviating the continuation of the lengthy procedures.

1./ Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-422, 6 NRC 33, 79 (1977), quoting, Power Reactor Development Co., No. F-16, 1 AEC 128, 153 (1959).

y Houston Lighting and Power Co. (South Texas Project, Units 1 and 2), LBP-83-37, 18 NRC 52, 59 (1983).

V Long Island Lighting Company (Shoreham Nuclear Power station, Unit 1), LBP-84-30, 20 NRC 426, 435 (1984).

10/ See Maine Yankee Atomic Power station (Maine Yankee Atomic Power station), DD-83-3, 17 NRC 327, 328 (1983).

11/ Coalition for the Environment, 795 F.2d at 171.

"\

In promulgating the rule which eliminated the case-by-case examination of financial qualifications, the Commission specifically "retained the authority to require additional information in individual cases when the presumption of financial qualifications seemed unreliable. 11 12/ It also expressed its "intent to utilize its inspection/investigation resources to help assure itself that utilities which have a need for operating funds will not skimp on complying with regulatory requirements. 11 13/ The Commission pointed out the superiority of this more flexible approach by noting that "[a] financial disability' is not a safety hazard per se" because the licensee is required under the Commission's regulations to "cease operations if necessary funds to operate safely [are] not available."14/ The Commission determined that the "limited usefulness of the financial qualifications inquiry underscores"15/

the determination that "safe operation .is best ensured by other regulatory tools such as the NRC's inspection and enforcement process. 11 16/ Therefore, if there are specific financial problems at Limerick or Peach Bottom, this plant-specific approach -- rather than generic rulemaking -- should be utilized.

In sum, because the rulemaking record is devoid of facts which establish a link between safety and financial qualifications,11/ and because "[t]he quality and extensiveness of the Inspection and Enforcement effort is such that any significant pattern of unsafe cost-cutting should be 12/ Id. See also 49 Fed. Reg. 35,747, 35,751 at col. 1 (in which the Commission stated that it did not intend to waive or relinquish its residual authority under the Atomic Energy Act to require financial information in individual cases as might be necessary given special circumstances).

13/ Houston Lighting and Power Co. (South Texas Project, Units 1 and 2), LBP-83-37, 18 NRC 52, 59 (1983), citing Public Service Co. of New Hampshire, 7 NRC at 19.

14/ 49 Fed.Reg. at 35,749.

]di PU.blic Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-78-1, 7 NRC 1, 19 (1978).

1.§/ Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-895, (July 5, 1988), Slip Op.' at 9; citing, 49 Fed. Reg. at 35,748-49.

17/ 49 Fed. Reg. at 37,750-51.

detectable, 11 18/ petitioners' bald assertions of alleged safety hazards fail to justify a generic rulemaking amendment to require mandatory case-by-case examinations of financial qualifications.

B. Petition More Appropriately Seeks Plant-Specific Relief As suggested above, the petitioner has apparently chosen an inappropriate procedural device. If in fact the petitioner is legitimately concerned about safety compliance at the Limerick and Peach Bottom stations, the proper approach is plant-specific enforcement action. Specifically, the petitioner could seek a waiver of the electric utility exemption in that case under 10 C.F.R. § 2.758(b) or other plant-specific relief under 10 C.F.R. § 2.206 (rather than a generic rulemaking amendment).

However, even if the petitioner had pressed this effort, his petition still fails to offer proof sufficient to warrant relief.

As stated above, "the 'reasonable assurance' requirement of 10 C.F.R. §50.33 does not require a demonstration of near certainty that an applicant will never be pressed for funds . . . . "lif Because of the absence of a precise link between safety and financial qualifications, it has been held that "neither the Commission's regulations nor the Atomic Energy Act mandate the institution of enforcement proceedings merely because a licensee may be experiencing financial difficulties."W The Commission has stated that "[m]ere speculation that financial pressures will undermine the safety of licensed activities is not enough . . . [because] the critical question 1JV Public Service Co. of New Hampshire (Seabrook station, Units 1 and 2), CLI-78-1, 7 NRC 1, 19 (1978).

19/ Detroit Edison Co. (Enrico Fermi Atomic Power Plant, Unit 2), LBP-78-11, 7 NRC 381, 392 (1978); cited in Petition Concerning Financial Qualifications of Nuclear Power Plant Licensees, DD-81-23, 14 NRC 1807, 1809 (1981).

W Cleveland Electric Illuminating Co. (Perry Nuclear Power Plant, Units 1 and 2), DD-85-14, 22 NRC 635, 637 (1985),

quoting. Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), CLI-83-21, 18 NRC 157, 160 (1983), aff'g. DD-83-3, 17 NRC 327 (1983); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), DD-82-8, 16 NRC 394, 395 (1982).

is . . . whether such constraints have had an adverse impact on safety or are substantially likely to affect safety adversely."W The Commission has further commented that a waiver of the financial qualifications exemption "can be granted only in unusual and compelling circumstances."ll/ The fact that relatively few waiver petitions have been filed in NRC adjudicatory proceedings, when combined with the "fact that few, if any, such petitions have been successful," underscores the difficulty of meeting the waiver standard.£1/ The petition in the present case offers only the supposed admission by PECo that it is experiencing "financial difficulties." Only through conjecture is any attempt made in the petition to link potential safety compliance with this financial difficulty. We fail to see how an unsubstantiated allegation of insufficient financial qualifications could meet the required threshold level of proof to warrant a waiver or any other plant-specific action.

The Atomic Safety and Licensing Board ("ASLB") has recently determined that the singular fact that a nuclear power utility company had filed a Chapter 11 Bankruptcy petition does not, per se, require a grant of a§ 2.758 waiver of the electric utility exemption.2.+/-/ In the present case, the petitioner has not even speculated that PECo's financial position might eventually require a Chapter 11 reorganization. However, even if the petitioner had alleged that a Chapter 11 filing by PECo was imminent, the ASLB has determined that the bald assertion that a Chapter 11 reorganization filing may exclude a utility from the ratemaking process, "without a great deal more, . . . falls far short of meeting the . . . burden under 10 C.F.R. § 2.758."~

The current petitioner has failed to allege and substantiate any facts which provide the necessary indications of serious financial concerns required for the ASLB to certify a§ 2.758 waiver petition to the Commission.

Finally, petitioner alleges that the "shaky" financial condition of PECo, when combined with the other postulated concerns of PECo, will ultimately force the decommissioning of 2_V Northern States Power (Monticello Nuclear Generating Plant, Unit 1), CLI-72-31, 5 AEC 25, 26 (1972).

W See Public Service Co. of New Hampshire (Seabrook station, Units 1 and 2), ALAB-895, (July 5, 1988), Slip Op. at 15.

2.+/-/ Id. at 22-23 .

.2._V Id. at 23.

the Limerick Unit 2 station, which the petitioner speculates PECo cannot finance. This allegation points to yet another fundamental misperception of the NRC's regulations. When the Commission published the rule changes which eliminated case-by-case financial qualifications examinations, it stated that decommissioning funding was more appropriately dealt with in the form of a specific rule governing decommissioning funding.2...§/

The Commission has recently published its final decommissioning rule.£Zj Compliance with the decommissioning funding rule is an issue separate from compliance with the "financial qualifications" rules.2Jij

3. Conclusion The petitioner proposes a generic rulemaking amendment to reinstate case-by-case financial qualifications examinations in operating license hearings as a solution to alleged financial problems at PECo. Not only has the petitioner failed to support any allegations sufficient to question the validity of the NRC rules now in force, but he has failed to indicate why he has presented what is essentially a petition for plant-specific relief in terms of a proposal for generic rulemaking.

The petitioner alleges in broad statements that PECo has a shaky financial position which he believes represents a present hazard to public safety. The petition, however, neither provides substantive proof of these alleged financial conditions, nor proof that, even if the financial conditions exist as asserted, these conditions would actually compromise PECo's desire or ability to comply with safety regulations.

Finally, the petitioner fails to recognize that any speculation regarding PECo's ability to provide adequate decommissioning funding is more properly addressed under the new decommissioning rule, not through a generic rulemaking to amend 10 C.F.R. § 50.33(f).

In sum, we are of the opinion that the current rules allow the Commission to determine the financial qualifications of an applicant or operating licensee in a reasonable, flexible, and 26/ See 47 Fed. Reg. at 13,751. See also Public Service Co.

of New Hampshire, Slip Op. at 36, n.66 (July 5, 1988).

27/ See 53 Fed. Reg. 24,018 (June 27, 1988).

W See Public Service Co., Slip Op. at 36, n.66 (July 5, 1988). See also Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), DD-83-3, 17 NRC 327, 329 (1983).

efficient manner, in full compliance with the mandate of the Atomic Energy Act. Any specific financial difficulties resulting in potential safety problems can most effectively be addressed on a plant-specific basis. Therefore, we strongly recommend that the Commission deny the petition and decline to amend the well-supported *regulations.

submitted,

DOCKET NUMBER PETITION RULE PRM .50 - S .2.

.53 F te~ Z f_L_~

LONG ISLAND LIGHTING L--OMPANY SHORE HA _J...,A-4-1._i R S TATION P.O. BOX 618, NO RTH

.t,;

~l.

s '--'u JOHN 0. LEONARD, JR.

VICE PRESIDENT

  • NUCLEAR OPERATIONS

~

Der

,..- 81. 1.

\r ~.:: .tt. -~,.,._..-.,.,.,

~ :*~'lf-Q

s_.._". . r.
  • it;. VPNO 88-144
      • *Y.1f
      • IJcj C.'f OCT 271988

'"' t .:.. \

Secretary

u. S. Nuclear Regulatory Commission Washington, DC 20555 ATTN: Docketing & Service Branch

Subject:

Comments on Marvin Lewis; Petition for Rulemaking Docket No. PRM- 50-52 Gentlemen:

The Long Island Lighting Company (LILCO) hereby submits our comments in response to the petition by Mr. Marvin Lewis seeking a rulemaking for the purpose of reinstating financial qualifica-tions as a consideration in the operating license hearings for commercial nuclear facilities within the Commission's juris-diction. 53 Fed. Reg. 32,913 (August 29, 1988). LILCO believes that Mr. Lewis' petition should be denied because the petition fails to establish a basis for the requested generic rule change.

LILCO does not comment on the accuracy of Mr. Lewis' comments on various facilities belonging to Philadelphia Electric Company.

However, as to his assertion that LILCO "has admitted that it does not have sufficient monies to pay for decommissioning,"

LILCO submits that it has never made any such admission.

o.s. NUCLE.\R R_CGtJlt.Tf1P-V CQM'4 SI hi DOCK"'"IN*':; & ~r.rv*rE '"Fe'" N o*r*.-~ - : ~-1~ :* _ *

  • RV C _, '\ . . N Postriar~ D.:,',) /0 -.;:i ~-fc_f CC'pir-s R ~c vr- J l AJd'I (rp, .s Rc?rd,, 3 __ _

5pec al n, ri!:-ut on ~ .5.c _ _ __

-2.P f<r ./3~- pJ ...,

( I"( _* ;

  • ti **

GPU Nuclear Corporation Nuclear .88 OCT 28 P2 :58 One Upper Pond Road Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482

,)F ' . Writer's Direct Dial Number:

GOC h: . I

,if* * ~l October 27, 1988 C300-88-0484 Secretary of the Commission DOCKET NUMBER U.S. Nuclear Regulatory Commission Washington, D.C. 20555 PETITION RULE ; .~M ...:::)0 -5.,:2

~ ~  ?.,;2.91.i)

Attention: Docketing and Service Branch

Dear Sir:

Subject:

GPU Nuclear (GPUN) Comments Re: Marvin Lewis; Petition for Rulemaking Electric Utility Financial Qualification The Commission reouested comments on the subject petition for rulemaking (Docket No. PRM-50-52) by notice in the Federal Register on Augu~t 29, 1988 at 53 FR 32913. This letter provides comments by GPUN on the subject petition.

GPUN believes the Commission should deny the petition for rulemaking submitted by Mr. Lewis. GPUN offers the following comments for the Commission's consideration:

GPUN knows of no instance where the financial condition of an electric utility has had detrimental effect on public health and safety with regard to nuclear power plant operation.

The Commission, when publishing the final rule (49 FR 35747, September 12, 1987} eliminating electric utility financial Qualification from consideration during the operating license stage, used arguments which are still valid today.

  • NO\J _ 1 1988 GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation

J. S NUClEAR REGUI ATORY COMi r '

oor:KET'NG & s RV'CE SEC!

')'f I( t .-:,- i' J~ <;f"("R(T. ',,

OF liE CCV*./'. 1, I )~J Doc- Jmer-t St~,, : r<

'r.:, ,l** Da*c 1*

  • ~ Race Vt>

\ "

1 r "01 ~ R ~r.; 3 b /(_:rt::, ::;.,

°? 2':::> t'(_,, ~? .s. a .-\J

Ratemaking authorities, while ensuring that the cost of electric service remains reasonable, have a further obligation to ensure sufficient utility revenues to maintain electric service reliability and to meet the costs of safe nuclear plant operation. It is inappropriate to presuppose that ratemaking authorities would act irresponsibly such that public health and safety are compromised.

The Commission has not relinQuished its authority to review the adeouacy of nuclear power plant licensees to operate their facilities, including utility financial Qualification, at any time.

Experience has shown that electric utilities have taken appropriate measures to ensure their nuclear facilities have adeQuate resources for safe operation even during periods of financial pressure. These measures have included securing interim rate relief, obtaining special lines of credit, deferring non-nuclear maintenance and capital improvements, suspending stock dividends and establishing other cost-containment measures. In nearly all cases, the financial pressures have been temporary.

In conclusion, GPUN believes the basis the Commission used in promulgating its final rule remains valid and the subject petition for rulemaking has no merit and should be denied.

vf.?£~'.

Director, Licensin g & Regulatory Affairs JLS/PC/pa(7622f) cc: CARIRS - TMI & O.C.

  • as OCT 28 P3 :02 OF F!C: "1 eenergy alternatives OCK[ ;

BR I.

I

      • (.t October 24, 1988 Secretary U.S. Nuclear Regulatory Commission DO£KET NlJ*.~BER Washington, D.C. 20555 PETITION RULE~RM .!:>O -~-o<..

Attention: Docketing & Service Branch t 2,F",ea.-i9 If Re: Docket No . PRM-50-52 of 10 CFR Part 50

Dear Sir:

We suppor the request that the NRC reinstate financial qualifications of utilities as a consideration in the operating licensing hearings for electric utilities.

This issue has direct and indirect bearing on public health and safety.

A utility that is under financial duress, often a result of ineffectiYe management, may take short cuts in operation and procedures which result in accidental releases of radiation that endanger the public.

Our experience in re~carching the Philadelphia Electric Company (PECo),

gives us reason to believe that large, unplanned expenses haYe greatly weakened the utility, with no relief in sigh . This weakened fiscal condition can translate into substandard operation.

We were told that PECo has poured over $350 million into refurbishing Peach Bottom, plus has the continuing monthly cost of $5 million each month (now 19 months, with no restart in sight) for replacement p ower while Peach Bottom is out of service. Another $9 million a month cost is split among the three other partner utilities. These three utilities have sued PECo $250 million to recover these costs. Early this Year some PECo stockholders announced a lawsuit against management for its gross mismanagemen of Peach Bottom.

PECo estima es it will cost $80 million to repair a radioactiYe fuel leak at Limerick I that was detected this past August.

PECo's long history of incompetence and irresponsibility should have been a factor in considering the licensing of Limerick I and II. It is irresponsible of the NRC to rescind the rule which eliminates financial qualifications from consideration in licensing.

P]ease reinsta e this rule.

Sinrerely, c;;v~W~ 11 P.O PDX 902/COLUMBIA,MD/21f}14 (30D 381-2714/433-4674

a. s. NUCLEAR REGULA TOR. y cor DOCKETING & S( R\ I I(' q:

OFFICE C F TH' ,

Of rnE rr '

o !IT' rk Da /() -.i. .:s t Cop s Rec 1,..cr' I Ad l Con*c-* -3

~ :;: t::> .!>/

p DR.,. f.!;1;:e:r .s., ,J

, \

STEVE C, GRIFFITH, .JR, DUKE POWER GOMP.ANY LEWIS F. CAMP, .JR.

RAYMOND A,.JOLLY, .JR.

LEGAL DEPARTMENT W, EDWARD POE,.JR.

ELLEN T, RUFF P. 0. Box 33189 WILLIAM LARRY PORTER

.JOHN E, LANSCHE GHARLOTTE, N. c. 28242 (704} 373- 2570 ALBERT V. CARR, .JR.

WILLIAM .J. BOWMAN,.JR.

ROBERT M. BISANAR

  • aa OCT 27 AlO :oa W. WALLACE GREGORY, .JR.

RONALD V. SHEARIN EDWARD M. MARSH, .JR, RONALD L. GIBSON on- 11 . *. :.

.JEFFERSON 0. GRIFFITH,JJ:I: DOCK (*;*.,ll'

.JEFFREY M.TREPEL GARRY S, RICE BRAN ".

LISA A. FINGER Of' COUNSEL WILLIAM I. WARD, .JR, GEORGE W, FERGUSON,.JR, October 28, 1988 DOCKET NUMBER PETIT; .,:: ;.J RULEf-- P_ ~ -~-=,...~

R~- , ;~

0 Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Docketing and Service Branch RE: Marvin Lewis; Petition for Rulemaking Docket No. PRM-50-52

Dear Mr. Secretary:

Duke Power Company (Duke) is pleased to have the opportunity to submit comments on the captioned Petition for Rulemaking. Marvin Lewis, (Petitioner) seeks a change in the Commission's regulations, at 10 CFR §§2.104(c)(4) and 50.33(f),l/ which under normal conditions exempt from NRC review of operating license applications, including hearings, the financial qualifications of applicants who are electric utilities." Petitioner alleges that the Commission's present rules prevent the financial condition of a utility from being investigated during licensing hearings, thus requiring the assumption by NRC of financial adequacy on the part of the utility which could pose a danger to the public health and safety.

For the reasons set out below, Duke believes that Petitioner's request should not be addressed in a generic rulemaking. To the extent Petitioner has stated an appropriate claim, avenues exist within current NRC regulations to allow Petitioner to raise those claims for consideration. Thus there is no need for a rulemaking of the nature sought and Duke urges the Commission to dismiss the Petition.

Petitioner, a resident of Philadelphia, Pennsylvania, appears to be concerned about the financial stability of the Philadelphia Electric Company.

Petitioner maintains that Philadelphia Electric Company, because of long-standing operating problems at Limerick and Peach Bottom, suffers financial difficulties and that such financial problems may lead to a situation in which these plants will have to be shut down. Therefore, Petitioner requests that the NRC amend its rules to reinstate review of financial qualifications as a requirement for all electric utilities, and suspend the licensing proceedings for Limerick Unit 2, until Philadelphia 1/ The Notice published in the Federal Register (53 Fed. Reg. 32913, August 29, 1988) does not specify the sections to be amended. It is believed, however, that the references i n the text are the applicable prov isions of the Commission's rules. NOV - 1 1988 AcKnoW!tt!gt'.tl ~, t~t .. .. ~ . * ; .*...*

D.S. NUCLE R r.'GU' ~ ~ o;c;1 0OCf<ETING & S' ' I - *J OF-FICE OF 11--i OF THE CO \I '

Postm arl, f O - -2 ~--?ef' Cr .

I A*-'  ! r _... ...: *; ': t *. . ~ l.!"j 43 Spec ,.;I D, 'd:i!!lion /<..:Z:b.S

- ? l)_R-; __f3_e..1$-~ _(}__,,_ _ __

Electri c can demo nstra te to NRC that it is financially qualified to safely proceed with Limerick 2 and its other nuclea r operations.

In Duke 1 s view the relief requested by Petitioner, viz., generic amendment of NRC 1 s rules, is inappropriate. Mr. Lewis appears not to have raised issues for utilities other than Philadelphia Electric and, so far as can be determined from the Notice published in the Federal Register, has presented no basis for reviewing the financial qualifications of all electric utilities. Leaving aside the question whether his allegation with respect to Philadelphia Electric raises an issue which the Commission may find cognizable, the Commission's rules as they currently are constituted provide avenues to Petitioner to raise the questions he wants considered, assuming he can make the proper showing, and thus provide him the relief he seeks without resorting to a generic ~ulemaking.

For example, if Petitioner seeks relief with respect to any aspect of operation of those Philadelphia Electric plants that currently hold operating licenses, the appropriate avenue for him to pursue is to petition the Executive Director for Operations under 10 CFR §§2.202 and 2.206 for issuance of a show cause order "to modify, suspend, or revoke [the operating license or l icenses] or for such other act ion as may be proper." If Mr. Lewis is an intervenor in the licensing proceeding for Limerick Unit 2 and seeks a financial review of Philadelphia Electric as a part of that licensing process for Limerick 2 (and it appears that he does) the proper avenue for him to follow is to petition the Commission under 10 CFR §2.758 for a waiver of or exception to the general rules set out in §§2.104(c)(4) and 50.33(f). If Mr.

Lewis is not now an intervenor in the Limerick 2 licensing proceedings he may seek permission from the NRC, under 10 CFR §2.714, to so participate to raise his concerns in that forum.

Because Mr. Lewis has existing avenues of relief open to him and because his Petition presents no compelling reason why the Commission should amend its current rules the Petition for Rulemaking should be denied.

AVC/sjr DOCKtT NUMBER PETITl:..N RULE PRM -S.;2.J

(:!.3F/?. b~I~

Marvin I. Lewis 7801 Roosevelt Blvd.#62 "88 OCT 27 A10 :05 Phi J. a * , PA 1 9152 Secretary of the NRC FF 1c~

USNRC 0 CKC 1M.1 Washington, D. C. 20555 ANt,;._

Dear Secretary,

Please accept the following as my further comments on the Petition for Rulemaking noticed in 53 FR 167:32913 dated 29 August 1988. I am adding a New York Times article to the record.

If adding the entire article infringes upon copyright rules, please add only this reference: New York Times dated 10-5-88 on

....:,.aqe Al entitled,"Lilcc,'s Cc,mpeting Vc,ices~ While still pursL\ing

. cense fc,r Shc,reham, Utility seems intent c,n abandc,ning plant."

What the article points to and what I was trying to bring out in my petition is that a utility in financial trouble perfo ms acts which are not in the interest of the health and safety of the public. A utility in financial difficulties would put the health and safety of the public on the backburner and its own financial survival ahead of everything else. This is happening right now where local utilities cannot secure enough experienced control room operators and have had to ask for less experienced operators to be approved at TMI2. The NRC would be under pressure tc, allc,w many of these practices Lmder the fear that the utility would crash without these questionable approvals.

We are facinq many financial problems ahead in the nuclear industry. A signal from the NRC to allow practices for money saving reasons only would give a green light tc utilities to practice questionably. A signal from the NRC that financial a *c,blems ~,iill again be studied as a part c,f licensing wc,uld q1ve

  • signal to public and utilities to keep the question of safety above the question of finances. The Atomic Energy Act requires that all safety questions have preference over financial questic,n.;;.

The petitioner is also Action Director fer the Environmental Coalition en Nuclear Power, and has contacted the Director. ECNP has joined and agreed with this petition for rulemaking.

: ~ :7~

7801 Roosevelt Blvd.#62 Ph1la., PA 19152 CANE Marvin Lewis NO\/ - \ 199J 7801 Roosevelt Blvd. #62 .... .......

Philadelphia, PA 19152 t.

,I Cl.~- NUCLEAR REGUlATORY COMMISSION OOCKETIMG & SEltVICE S!CTIOl-4 OFFICE OF THF. SECRETA.RV OF THE COMMISSION Doc .- iii $! ! i tics ostmark Date i s

  • ed

,a ---..,,-~r I

'{Jl> /J.. ,.

I

  • 101 I

...3

/L..!;t,..s --

~(?~<f_/V.

Lilco's Competing Voices While Still Pursuing License for Shoreham,

  • Utility Seems Intent on Abandoning Plant ByMATTHEWL.WARD /i~~/FX The Long Island Lighting Company plowed ahead thr ug efr.~~ifficult has coveted an operating license for its engineering an co truction and rip-Shoreham Nuclear Power Station for ping out and rebuilding, all the while ig-20 years, but as it nears its goal the util- noring the critics who predicted that ity is showing ambivalence, simulta- Shoreham could reduce Lllco to pen-neously seeking permission to open ury.

Shoreham while patiently Now that the opponents have been awaiting approval of an proved right - Lilco has indeed been News agreement to abandon it. impoverished by Shoreham's soaring Analysis Even if it obtains a Ii- costs, in part due to the delays the crit-cense to raise Shoreham to ics caused - Lilco is holding off claim-full power, Lilco has said it ing its prize because the reactor no will not operate the $5.3 billion, 800- longer offers the benefits it once prom-megawatt reactor as long as the agree- ised.

ment with New York State to abandon Experts on utility operations say that the plant is still up for approval by its the difference between abandoning the s *holders and the state. plant and operating it would not be as

. Monday, when Lilco finally re- stark as it would seem at first glance.

ceived approval from the Securities Engineers would lament destroying an and Exchange Commission to schedule unused machine, but even if an operat-a hareholders meeting for Nov. 4, a ing license were granted, further legal deadline of sorts was also set: If the challenges by the state and Suffolk state does not act, the tentative agree- County could delay its opening for ment allows Lilco to withdraw from it 14 days after its shareholders vote. But Continued on Page B2, Column l Lilco, having pursued its "dual track" to keep open the option of operating the plant while negotiating with the state to abandon it, may be prepared to wait longer.

A Change of Heart Lilco executives, like businessmen anywhere, have not bared their goals and negotiating strategy to the public.

But some of their thinking can be dis-cerned from their actions, their state-ments _and from talking to experts in the field.

Nc>' '"UShing toward commercial ope, ,1 reflects a change of heart. In the early 1980's, when Lilco won a li-cense for low-power operation, it quickly moved ahead, even though such operation substantially boosted the cost of an abandonment.

Operating the plant has been the cen-tral imperative of the utility, which

I Lil~O On Shoreham: Strategj Has Conflicting Goa!s Continued From Page AI Jess constrained about licensing the ishoreham to the state for $1, call~ for plant. After Inauguration Day, its view ears more. The state and the county of Shoreham may change, especially if Operating the rate increases of 5 percent a year, nr the first three years and of about that ppose Shoreham on the ground that the new President is Michael S. Duka-ong Island could not be evacuated kis, who is far less sympathetic to the plant is still an much for seven more years. Those in-creases are about what Lilco would fely in a nuclear accident. nuclear industry than the Reagan Ad- Optt"on. have received under a "Shoreham In addition, regulatory decisions and ministration has been. phase-in plan" developed two years e negotiations with the state have al- But Lilco does not seem to think it ur - - - - - - - - - - - - - - - 1 a g o by the Public Service Commission ady reduced the financial impor- gent that the commission decide soon. to get the price of the operating plant nce of opening the plant. And starting One reason may be that a court chal- That is because th e state >ublic into rates without too much shock to the huge reactor would introduce lenge to a license is likely, throwing Service Commission ruled in 19Hl that consumers.

w problems for Lilco's thinly d b

  • h h J Id Lilco had imprudently spent $14 bil-etched power network. ou t onBut erate. Just perhaps w en t e pmost ant wou op- lion, mostly through mismanagement striking The Public Relations FactorI d ff Delay in Legislature among the probable reasons for Lilco's of construction, and that that anount If there is no major financia i er-The current delay is in the State patience is that the plant's fate means could not be passed on to consumers. ence, there are nonfinancial gains to gislature. Long Island legislators much Jess to the utility than almost The commission, however, al;o de- abandoning Shoreham. One is public ntend that the settlement is too anyone could have imagined a few Lilco cided that regardless of what rwenue image; although it has not always been could expect under trad tional obvious in recent years, utilities prize nerous to Lilco. The utility, unchar- years ago. rate-making procedures, the utility their relationship with the public.

eristically, has waited patiently, al- Cost Already Reduced should not go bankrupt. So it put an- "If they close the reactor," said one ugh the period between Election Normally, utilities earn nothing on other $1.9 billion of Shoreham's cost executive of a utility with nuclear y and Inauguration Day could be their investments in generating sta- into the formula used to calculate plants in the New York metropolitan tical for Shoreham. tions until those plants enter service, at rates, even though the plant was not region, "people will stop bashing them fter Election Day, when the votes of which time rates rise to reflect the in- running. As a result, Lilco is already over the head." Another utility execu-g . ers are not a pressing con- vestment plus a rate of return. But in earning a return on that part of Shore- tive said that if Lilco gives up on Shore-n t Republican Party, the Nu- Shoreham 's case, the $5.3 billion cost ham, about $400 million a year. ham, "it will be like the Marshall Plan, ar Re latory Commission may feel has already been whittled down to In addition, the plan negotiated with with Lilco as the defeated country."

about $2 billion. the state, under which Lilco would sell For the first time in years, Lilco could


.....,===============::::;::=======:;:::::::'============ have the Service cooperation Commission andoflocal the govern-Public ments.

Part of that image is the reliability of electric supply. Since the early 70's, Lilco has argued that completing Shoreham was necessary to avoid im-minent summer brownouts and black-outs. If such events come after Shore-ham is shut by an agreement, Lilco can say, "I told you so."

Alternatively - if the experience of other utilities is any guide - even if Shoreham did begin commercial operation, there is a fair chance it would still be unavailable on peak days, posing other problems for Lilco.

Reactors like Shoreham are gen-erally available for use less than 60 percent of the year. The owners can improve the odds by scheduling main-tenance shutdowns for periods of low demand in the hope that the reactor would be ready when the busy summer months come.

Delays Are Common But unscheduled shutdowns, or delays in reopening, are common.

Reactors in Massachusetts, Pennsyl-vania, Tennessee and Alabama have if been shut for more than a year because of management problems. There is al- c8 ways the possibility of major equip-ment failures, like those that have 1 closed Indian Point 3 in Buchanan, N.Y., or Robert E. Ginna, near Roches-ter, for months at a time.

And there is always the chance of ac-cident. The Three Mile Island Unit 2 reactor was the newest in the nation at the time of its partial meltdown 10 years ago next March.

And far technical reasons, even when

,. . DOCKET NUMBER

~;l.

PETITION RULE PRM ~ OCT 24 AlO :48 1jcotber 2 ,

e F IC0~9/~

1988

~: 0;. -::: 1_

COMMEN S OF OHIO CITIZENS FOR RESPONSIBLE ENERGY, '~.- N -i. ,~ 1t*O-CR E*>

C*N PETITION FOR RULEHAKING, MARVIN LEWIS, PRM-50-52, - .. .. FED.

REG. 32913 <AUGUST 29, 1988)

PRM 2 would reinstate th financial qualifications revie at th operating license stag for nuclear power reactor-operated by electric utilities. OCRE supports this petition.

In addition to granting th p titioner's requests, the NRC should also reop n all recently complet d licensin proceedin s in Which financial qualifications was excluded as on issue due to th NRC's rulemoking. Petitioners and intervenors should be allow d to litigate the financial qualifications issue in these proc edings to ensure that financial factors do not adversely impact on safety, The NRC's rulemaking assumed that electric utilities, being r guloted entities, would always b assured an adequate rote of return. This is in fact not always true, especially in recent y ors as utilities with large and expensi v e nuclear gene~oting facilities hove attempted to recover their investments, Th-public utility commissions, mindful of public outcry against rising electric rates and of the impact of *rate shoc k*, have limited relief for these utilities, An example is th Cleveland Electric Illuminating Co., which is trying to recover its investment in Unit 1 of the Perry Nuclear power Plant in Ohio and Sea v er Valley Unit 2 in Pennsylvania. The public Utilities commission or Ohio has twice denied an emergency rate hike request for CEI, despite a finding that the utility's financial health wa precarious. This has lead the company to take the extraordinar y step of exhorting its shareholders to rite to the PUCO and to newspapers urging more favorable r gulatory treatment by the PUCO. see attached letter, This letter contains the disturbing statement that CEI does not have

  • the money for maintenance, equipment, and personnel.

truly o frightening condition power plant.

some state regulatory or a utility operating a nuclear commissions considering performance standards for hove imposed nuclear power or This pla nts.

is are This creates a dangerous incentive for cutting corners on maintenance or operating a plant when a shutdown would be more prud_nt, The state regulatory commissions s hould not necessarily be blamed for this situatio n . They are simply responding to constituent pressure and t eir manda e to balance the conomic interests of the utilities and the ratepayers. Nuclear safet y has simply not been a primary considerati on . if it is considered ot all, This is to b e xpected in the regulatory system set up by the Atomic En rgy Act, ith its federal pre-emption of radiological health ad -arety issues. But, by r~scinding the financial qualifications review at the operating license stage, the NRC has created o regulatory vacuum. Neither

  • 0 CVT 2*
  • 7** *19°~

~cknowledie d oy car .*****

(.

t *.

  • I f * *

. 9. NUCLEAR REGULATORY COMMISSION DOCKETING & SERVICE SECTION C FFl(E OF ntE S~CRET ARV

')~ T~tE COMMISSION t'"cument Statistics

,., u~ ~.,,.. t 0~.2 O-'irr _

. . . ... , **-l L

<, I , * , ,, Reproduced .3 "p ci Di* ibution an ~~t'J>~

'2l&......,_~~J--- -- -

' 1 th s t a t s ore exo ining the impact of financial pr on nuclear power plant af tY.

Ab nt a national requirement (mot likely impo ed bY congress on t st t and er oting constitutional and j uri diCtionol issu , as w ll as being unpopular and difficult to enact ) on

~tate re ulotory commi_sions to consider the nuclear safety impact of th ir rot making d cision and polici s, any such con !derotion will be voluntary, frogm nt d, and piecemeal.

such CQTISid ration are really th job Of th NRC, Which would hov uniform, national standards for financial qualifications r vi ws. Th NRC should quickl reinstat the financial quali ication tondards in plac b fore th ir reci ion.

Ind ed , it is surprising that th NRC ould not want to ensure th financial h alth of its licenses. In recent y ars the NRC has paid con ideroble attention to th costs or it r gulations on it liens e . see, e.g., th Bock it Rule, 10 CFR 50.109

  • If on-ideration of costs to liens es in nacting or enforcing r ulotery r quire nts is appropriate, t n surely it is prop r to xamine the financial health of lie nsees to d t rmin th ir fitn ss to hold an op rating icense, Th NRC -hould rant PRM-50-52 imm diat lY. A erious problem which is not being addressed, and the NRC should take opportunity to protect th e public from financially-

~roubled utiliti s.

R spectfullY submitt d,

~u an L. Hic,t 27 Munson Road M ntor, OH 44060

( 216) 2~5-3158

6200 Oak Tree Boulevard Moil Address Independence OH PO Box 94661 216-447-3100 Cleveland. OH 44101-4661 September 14, 1988

Dear Share Owner:

Six years of unfair regulatory decisions by the Public Utilities Commission of Ohio have left us frustrated and in need of your help. In the absence of adequate rate increases, it will not be possible to keep our commitment to customers to provide the high quality service they deserve and expect.

Vhile our customers may suffer in the future, you, as share owners, have al ready suffered from the PUCO's decisions. So, in your o~n self-interest, we ask that you write to the PUCO chairman, Thomas V. Chema. We will give you his address aft er a look at the recent PUCO record.

That record includes regulatory decisions that have added billions of dollars t o the costs of the new nuclear units we built to ensure a rel ia ble supply of electricity for Northern Ohio.

In the late 1970's, we asked the PUCO on several occasions to include "Construction Work in Progress" in our rate base. If the PUCO had done this, the total financing costs of building Perry Unit 1 and Beaver Valley Unit 2 would have been significantly lower. '

The Commission has consistently urged us to come up with "creat i ve solutions " to avoid the "rate shock" that would supposedly result from recovery of our investment in the nuclear units. Here are some of t he things we did:

  • The Cleveland Electric-Toledo Edison aff i liat i on saved $56 million in 1987, 67% more than was projected.
  • We put together the largest sale and leaseback of generating capacity in utili ty history. The $1. 7 billion proceeds enabled us to redeem or refund near ly a bi l lion dollars of high cost debt. Other proceeds were intended to help hold down customer rates in the future but we are having to spend that cash now to pay our bills.
  • A comprehensive evaluation ~f daily jobs and departmental activities enabled us to offer a voluntary early retirement program that 544 employees accepted. The ongoing program promises significant additional savings.
  • We developed a plan to phase in rate increases to recover our nuclear investment over a 10 year period, rather than all at once.

. The fUCO's response to these cost-cutting successes and the phase-in plan is disheartening. Last December, the Commission gave us an extremely small rate increase, then later cut even that token amount.

In January, the PUCO ordered disallowances totaling about $800 million in connection with alleged imprudent management of the construction of Perry. Our share of that is about $400 million. That decision contrasted sharply with a finding in the less hostile political environment in Pennsylvania: the Pennsy l vania Public Utilities Commission found no imprudence.

Also in January, the PUCO required us to discontinue booking an equity return as part of the carrying charges on our completed ~onstruct i on not yet in rate base.

This is a complicated accounting issue but in essence it means share owners are not getting even an IOU on their investment and will not until the PUCO orders a phase-in plan. The accounting decision has lowered our reported earnings in 1988.

The PUCO's reluctance to grant rate increases led directly to our painful decision to cut the common stock dividend last March.

' The final straw came with the PUCO's August 23 decision on our emergency rate A increase request. The PUCO conceded that Centerior's "financial health is i n

., serious peril," but nevertheless refused to grant even a nickel of the increase we badly need. Last week, the PUCO staff made recommendations in four pend i ng cases that continue th is negative regulatory record .

Not only has this record cost you as an investor, it has placed at risk our ability to continue to provide service. Ye just do not have the money for maintenance, for equipment, for people to do the work. If you find this as disturbing as we do, you may wish to write letters to your local newspaper.

Your letters will help offset the noisy acti vi sm of various anti-utility and '

anti-nuclear groups.

In particular, you may wish to write to the PUCO. Please write to Hr. Thomas V.

Chema, Chairman, The Public Utilities Commission of Ohio, 180 East Broad Street, Columbus, OH 43215.

Enclosed are some suggestions for points to make in your letter. Ye would appreciate receiving copies of any letters you send.

In the coming months we face PUCO decisions in the principal rate cases for both our operating companies and additional proposed disallowances of inves tment i n both Perry and Beaver Valley. We have appealed four of the PUCO's more onerous earlier decisions to the Ohio Supreme Court and we have asked the Commission to reconsider granting an emergency rate increase.

Ye need your help and we hope you will write Chairman Chema.

Sincerely, Robert H. Ginn Richard A. Hiller Chairman and President Chief Executive Officer

Letter writing tips Letters to Chairman Chema or to the editor of your local paper should be in your own words and no longer than necessary to make your point. You may wish to consider these suggestions:

  • The cost to you of the PUCO's decisions. (In the past two years the price of Centerior Energy common stock has f allen 50% and the dividend has been reduced 37.5%.)
  • Only a f i nancially healthy electric ut i lity can assure the high quality service necessary for local economic growth.
  • The Perry and Beaver Valley 2 units have been producing power for nearly a year. It's time for customers to begin paying for them.
  • Centerior Energy has significantly reduced its costs; further cost reductions could affect service. It's time t o raise rates.
  • The Centerior Energy phase-in rate plan is fair to customers and would enable share owners to recover their investment in facilit i es now providing power.
  • The PUCO should promptly approve the Centerior Energy phase-in rate plan.

ECOLOGY/ALE1{T

- DOC!~ET NUMBER PETITION RULE PRM ~ o~

BOX 621 o-:3;=-/<.., 3 ,2. y/4.3 BCOOM SSURG 17815 Oct 6-88 ... CC.:Kl i[ C*

E Nem ethy, sec'y thNRC Re: Docieet FRN-50-52 Sec'y - NRC Petition for rulemakin_g_

by 1~1arvin Lewis "88 (la 11 P4 :l O ATT: DOCKETING & SERVICE :aRANCH Gentlemen -

Despite Mr Lewis' speculations about the potential shut-down of Limerick 2 (which we'll bet you won't acce ~t),

he makes a strong case for the necessity for financial stability of utilities involved in nuclear power.

we feel y ou should give his petition a f air neari ng ,

admit y ou used poor Judgment in issuing a final rule on Sept 12"i!t34 - which eliminated financial qualifications during licenc e review - and rescind that ruling.

"cknow Iedg ed by card .* ***** *--**--* -

DOCKETED tJ':>NhC

[7590-01]

NUCLEAR REGULATORY COMMISSION

'*( p Docket No. PRM-50-52 Marvin Lewis; Petition for Rulemaking AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of Receipt of Petition for Rulemaking.

SUMMARY

The Nuclear Regulatory Cormiission is publishing for public comment this notice of receipt of a petition for rulemaking dated June 6, 1988, that was submitted by Marvin I. Lewis. The petition was docketed on June 8, 1988, and assigned Docket No. PRM-50-52. The petition requests that the Commission ame nd its regulations in 10 CFR Parts 2 and 50 to reinstate financial qualifications as a consideration in the operating licensing hearings for electric utilities.

DATE: Submit comments by October 28 , 1988. Comments receiveo after this da t e will be considered if it is practical to do so, but assurance of consideration cannot be given except as to comments received on or before this date.

ADDRESSES: Submit comments to: Secretary, U.S. Nuclear Regulatory Cormiission, Washington DC, 20555. Attention: Docketing and Service Branch.

For copies of the petition for rulemaking, write: Rules Review and Editorial Section, Regulatory Publications Brarach, Division of Freedom of Information and Publications Services, Office of Administration and Resources Management, Nuclear Regulatory Commission, Washington DC, 20555.

2 FOR FURTHER INFORMATION CONTACT: Juanita Beeson, Chief, Rules Review and Editorial Section, Regulatory Publications Branch, Division of Freedom of Information and Publications Services, Office of Administration and Resources Management, Nuclear Regulatory Commission, Washington DC, 20555, Telephone (301) 492-8926.

SUPPLEMENTARY INFORMATION:

Background

4t The Commission published a final rule on September 12, 1984 (49 FR 35747) that eliminated financial qualifications from consideration during the operating license review and hearings for electric utilities. The petitioner states that issuance of this final rule prevents the financial condition of a utility from being investigated during licensing hearings, that the 11

      • rule requires the assumption of financial adequacy .** , which has resulted in several problems that could pose a danger 11 to the public health and safety.

Petitioner's Interest The petitioner, Marvin I. Lewis, is a resident of Philadelphia, Pennsylvania, and is concerned about the financial stability of the Philadelphia Electric Company (PECO). PECO is the parent utility for Limerick and Peach Bottom nuclear power plants located in Pennsylvania. Mr. Lewis believes that Limerick 2 may go critical and eventually have to shutdown and that he and residents of the surrounding area will be adversely affected by the shutdown. In addition to being exposed to radiation from the radioactive waste produced by Limerick 2, Mr. Lewis is also concerned about the many costs associated with health risks, rate hikes, and other unknown potential problems.

3 Grounds for the Petition Mr. Lewis cites several long-standing operating problems at Limerick 1 and 2 and Peach Bottom plants that he claims have placed a financial burden on PECO.

Mr. Lewis asserts that PECO has admitted to being under financial pressure and that the cost of Limerick 1 and 2 has placed the company billions of dollars in debt. Mr. Lewis indicates that the financial problems facing PECO will lead to a situation such as the shutdown of Shoreham nuclear power plant after it became radioactive. Mr. Lewis states that Shoreham was granted a license despite the sha~ financial condition of the parent utility, Long Island Lighting Company (LILCO). He claims that LILCO has admitted that it does not have sufficient monies to pay for decorrmissioning of the nuclear power plant.

General Solution to the Problem The petitioner requests that NRC reinstate financial qualifications as a requirement for electric utilities and suspend the licensing proceedings

- , for Limerick 2 until the parent utility, PECO, can demonstrate to the NRC that it is financially qualified to safely proceed with Limerick 2 and its other nuclear operations. The petitioner requests that the 3O-day comment period for this petition be reduced in order to prevent further financial hardship on PECO.

4 Conclusion Mr. Lewis believes that Limerick 2 is going "critical, 11 i.e., will begin to generate power, and may be closed. Even if the plant stays open, Mr. Lewis states that the shipment of radioactive waste will expose him to radiation without corresponding benefit, which he claims is in violation of the Atomic Energy Act. Mr. Lewis states this Act exhorts the Federal Government to protect health and safety of the public and that the Nuclear Regulatory Commission has been charged with enforcing this mandate.

Notice Regarding Petitioner 1 s Request to Reduce 30-day Comment Period The staff has read the petitioner's letter to waive the 30-day coment period for this notice of petition for rulemaking and determined that it is impractical to do so, therefore we are publishing this notice of receipt of the petition for rulemaking with an opportunity for the public to corrrnent.

Petitioner's Proposal Part 2 The petitioner requests that Part 2 be amended to revise §§2.4(s), 2.104(c)(4),

and paragraph VII.(b) (4) of Appendix A to reflect the language prior to issuance of the final rule published September 12, 1984 (49 FR 35747).

5 Part 50 The petitioner requests that Part 50 be amended to revise §§50.2(x), 50.33(f),

50.40(b), and 50.57(a)(4) to reflect the language prior to issuance of the final rule published September 12, 1984 (49 FR 35747).

Dated at Rockville, MD. this *z:>cl day of August 1988.

For the Nuclear Regulatory Commission.

'88 JlN 21 PA :QO "88 J.N -8 P5 :OS MarvJ n J. LeWJ.!:

'/!::H >1 Rc,c,seve> l t l:::11 vdJri'fl':- , ; : :

1-'h J la.

  • 1-'A 1 "-r 1 =..2 OOCKr°* *Nr: -.~ -~ '/,~-/

bec.re ,~r ,,- QP ,\ N*~

  • USNl-<1, Wa5hJnqton. u. L.

Attentic,n: Lhiet. uc,cket1nq and Service> l:lranch 1-*1ease accept: thl!s pC?t1t1on re.lated tc, loLF-f< 2..1:11..>c<aJ

  • 1<.>

Ci-R 2.1::!l.lc. (a) sta:1te:s, 11 Any interested persc.,n may pet1t3c,n the Lomm1ss1on to 1sst1e. amend c*r rescind any regulation .. "

1 respectTully petition the Comm1ss1on to rescind the rule

.411111iih1ch has el1m1nated,-tinanc1al qual1f1cat:1c,ns from cons1derat1c,n 9n tho J 1cens,ng o't "electric ut1lit1es ( ;,.1u*R S0.2(x) 1Jef1n1t:1ons." > W:> a,-e presently taced with the very problem!:':

which l stated or predicted 1n my S-28-1::14 comments on the rl1le-10CI-R 2.104(cJ(4) and 50.88(fJ eliminated tinanc1al qual1~Jc.at1ons from consideration 1n the electric ut1l1ty ope,-at.1ni;:1 J 1cense hearings. lhese prc,blems are a danger tc, the health and s~toL~ oT the public.

> I 14 I E:::111::.1.J I UI- ~'HUl::<L E:.r-1 :

lhe? tJ11.:an=1a1 (..ptal1t1cat1c n ru!e dc.,e;;; 1,ot a.lJc,~, the t1nan!:L=:posed to radiation d11r1r1g past c*pC?ratJon, T11ture cleanup and transpo,-tation o-r- the radioactive wastes. lhe expc,sures. are necessary during clean up and decomm1ss1on1ng ot the radioactive plant. lhe Shoreham reacto, p.-oduced 11cg1ig1b1e commercial electricity. Comm~rc1a1 elect, 1c1ty is the only benefit which Shoreham operation would have p,oduced.

ln s 11m,  ::ihci, el1::1in r,perat1c,n hc1s p,-r,d11ced no bene.-t1t but hDs increased h~aJth costs.

14 s1m1 la, sit1.1at1c,n is c,cc:urr1nq w1th the L1mer1c:k c'tnd

~eaLhbottom Nuclear ~ower ~*tants. these plants Rre part oi PE:.Lo. the same ut1J itv. I hey all ha-18 st:.::eab!e prc,blems n:?1:::1te-d to i.1nanc:Jnq.

1-'eac.hbo I tc,m lia;:; :;;11 tiered !c,ng shu tdc,~*1,,s due to many v10Jat1ons. lhc J~tcst shutdown m~y go past JRnuary 1~8~

accc,rd .111g to s ta tem~nts i l I the Pl::.L.:o 1 n *he,, 1se news! etter, the Susq111:::trann<::< LJqhi (S:?t:? aJ l April and May iss*AC?s.)

l 11ne1 1ck 1 has tac:ed many shutdc,wns, since starting !o~, pow2,-

0perat1on. lhe p~lsonnel who are qualiti~d to work on L1mer1c:k a<bLtsq11c,ha11na L19ht, May and Apr11 1Y88 Jss11cs) have 1nst.ead be.*en

~ressed 1nto 5erv1~e to return Peachbottom ta operation. Ou~ to lack o t persc,nnoi, the PE:.L;o organ1 zat 1 c,n has exp er 1enced *101/4 ovei*tlm r~t~ Jn solected labor forces. All these problems 1nci-ease the f1namcial burden *

.t1c.,th L1me;r1c~* l and 11 receive cc,oJinq water trom the Sus1111eha11n:3 RJ ,:e,. lhe 1Je.l.aLY3re> Rivei* t:1as111 Comm1 ss1on c:c,nti c, Is the var 11Rr1c.es 1.n1dm ~1h.1.ch L1mer1ck 1 has obtained coed 1ng Hc1tE.-1.

A ma 1c.. - prc,bab1ll ty exists that the b11sqwr:*han,1a w111 ta11 tc, prc,vJd::: suttJc.Jent \vRt::.?r tc.,r either c., bcd,h I .1.me1*1c.k plants. lh.

subseq11e11t shutdc.,~i11 Hl!J retlect pc,c,r!f 11po11 the ear rung po~E:::, c,t the P~Lo orqanizat1on.

the s1h1.:atio11 111 th PE:.Cc, se1v.1c.e,, "'11-ea 1n.1.m.1cs the s1tuat-tc111 wh11..h !,as c,c.c.1111 crl 1n the llLL'c, serv1ce a, :::a.

L 11,e ;;;.i;:r,.*Jcc area 1s grossly overli1111t. ! t L1mer1ck 11 comes on lJnc, I 1mm 1c.:k ..(I will increase the cap"c1ty ot the:

syst£m to 601/2 mo,c capacity than 1s needed tor summer peak load

-t~A t-'I.IL I c1tE: cas:::) 1:165. > 5 c!.. Irie mad~ot: tu1- out ot service a,ea sales 1s probJemat.1cal.

Landrje p1 o~cntJ} s~lls power at a very low rate, and the rul~s oi the F-edei-al E:.n£nJy Lomm1ss1on require uti11t1es to buy 1011,est avaJJabJe elec.t11cal power available trom the grid. lheretor&.

PE:.L;o's electric sa.1es suttcr from compet1t1on with t;anadian el2ctr1c. Jmports.

,:j. I he F-cde,-a 1 PUkPA rcqu1 res PE.Lo to buy c.ogenerated eloctr1c1ty at least cost. Sales required by PUHPA are boom1ng, and threaten the need for add1t1onal electric supply.

4. P~Co has admitted to being under tinanc1al pressure. the cost ot L1merick 1 and 11 has left P~Co with billions ot dollar~

in debt. l he rules and rog1Jlat10ns ot both the 1-'A law and tho PA PUC requ 1 re that I mnecess.ary and u,,nc-eded c. a.pac 1 ty may not be ch~sged 1n tha I c1.tt? base. Capital recc,very 1s nsar impossible.

1t,10 t1,1::1,,c:1:1J p,*oblern: tac1nq F'l::.Lc, ~JJ!l !~ad tc, a sttu-3t1c,,1 m1m1t.:.kJ11q tl,c: bht,i 21larn SJ tuc:1t1c,n. A :hutdc*~~n t*t c*n8 c,r rnc,rG c,t the f-'E:Lc, n11c1ca,* po1r,~r plants will lead tc, a s1tuat1ein much !Jke bh~i-ch~m. ~c:c.omrnJss1on1nq a radJo~ct1v~ po~er plant wiJJ e :p85C many ~\lorkers :1nd 1*E?s1de11ts to u1111ec. ..*ssary and unneeded rc1d 1 ::1 t- 1c-11, expoeur::?s. lhese added health r1sl--'s involve added costs whJch w111 occur i t Limerick I I goes critical.

Gen:?1 aJ Solution to the Problem.

A 11,e problem 15 that anc,ther ni1clca, ro1r,cr plant i,nll be

  • clos::?d atter bQC.t 1 m1nq rad1oactJve. l.imC?l ir.l; J J' 1s the plant ve,-),

likely to be ctic,::;en. lhe General bo1ut1011 JS tc, require f-'E:Lc, to d~mc,nstratC? tin.=-nc1aJ quaJitication s11ttJLJent tc, decomnnssic,n a nuc1eai po~~er plant. Alsc,. L1me1* ic~ I l lc,w power license and ope1 at1ng J1c:r.ns:::::- h:?ar1ngs need tc, stop nc,~,iJ 1he stop ot h;:,arJng!:

tor Limericl-- 11 WJ!J a11c,u time? to deteinrine:: financial qualiricatic*n betc,1-s L1m2rick 1l gc*F= c:rJtJc.al and become?!:

radioactive.

Action Reque::;ted to Suspend Licensii*,q ProcE.>eding.

Ille pi c::c:::nt tJnancial condition ot* f-'l::.Co requir::?s a suspens1c1 r, ot licc,,sJnc;i to determine .3dequatc- tinar,cial qualification. lhe new s1t11atJc1 1, tac11,q 1-'l::.Co requires that NRL tinds 1-'l:::Cc, fina11LJ=1l l f q113J J tJcd to proceed with Linrer1cl--' 11 and its c,the,-

n11clc:>a1 c,pe:ratjc,ns in safety. lhe pet1t1c,ner req11C?sts an e1mmcdJat.e st:c.,p ]ll all Pl::.Lo hear11,gs to allc,u time tc,r the NHC tc, dC?tei*mlnC! t,11..=\t t-'l::.Cu 1s tinancJalJy qual1tJcd tc, proceed WJthcc1Jt endai,gerino the health and safety ot tl,e public.

Hequest tor bpacd *

.-.etJ tir,n!:.', , E.>spe::cttul ly req11ests that tlie ~(l day noti t 1cat10,1 in 2.t:J02(:::?J bo redut:ed fc,r gc,c,d cause!. Additional time wj lJ c,nJ),

place P~Lo in greater financial hardsh1p ,*educing PECo's ability to pi otec.. t the h::::!al th and satety or the p11b J ic.

f-'et1tJerner's grc,unds tor the ac:t1c1 n n:*qucstcd:

l t the Limerick 11 plant goes critical. the Petitioner ~,1JJ be EndMngered by the radioactive wastes shipped thru 1-'h1ladeJph1c1. lhe \-adt,aste prc,duced by a nuclear pc,wer plant adds to the da11c::ier a,1d e~:posure ot r es1dents.u lhe petitioner nc,r a,-ea residents w1ll receive no benetit as the area has a vast overcapacity ot cJectric production. the grc,unds are simply that the pctit1onor w1J1 b~ exposed to many costs; health risks, rate:: h1kcs, and ll11kl,own problems. wl11l£ ,cceiv1ng nE'gl1c;:iib1c correspond1ng benet1t.

f-'ct1t1L*f1e1*'s Jnti?s est 1n the action , cqttest:ed.

Hy 1nt~rest 1s that a nuclear powet plant 1n this area go1ng cr1t1ca1 and ;;ubscqt1ently closing 11n11 e>:pose me tc, rad1at1c,n without corre:ponding ben::?tJt and in violatJc*n to the requ,r2ment ot tl,e:, Atomic E.11e:-1 q,, Act. lhe Atomic EnerQy Act e>:hc,rts the t-~dera l GovE<r nwent t:o "prc,tect the heal th and safety ** ,- the pubJ H .* *' lt,c Lha, t-ci- ot the Nucle~r Regulatory Comm1ssic,n c:ha,*ges the Co,r,mJ s5 J c,n PJ t:h tha responsib 1 l 1 tv tc, ent ecrr:e parts r,t the Atomic: Energy Act. Spec1t1c:ally the ~omm1s&10n is char~ed with entc.,1 Llng tr,::: requ1rr::>ment stated nine time!:: in the Act tc, "pl'C'*l:e.*c.t thE! he:dth and satcty c,t the public." lhe- pet1t1oner 1s a m:?mbP.r CJ't tha pttb 11c whc, w111 be adverse! y attectod by the abc,ve shutdown ot an rad1c,act1ve r,Ltc:lc>a, power plant.

  • 511~~ ~. , . 7P 1 e~-,/s ~

?tlo :J l*foei 5eve l t .1::.tl vd. #62 f-'ts .1 1 a * !' PA 1 9152

( 21 :5 >6c'1 J =i'74 6-6-88.

DOCKETED USNRC

~liiilrvi n J

  • Lc,w1. =
  • "88 JIii -a Ps :os

"/!:!Ot Hc,c.,sevt?lt l::llvd..Jt6i.f_ ~~-*-**-

-h.l uA 1u1~*~ Uf.-F!C._ uF )-l*,*tt.'A,.;'f a.* ' " ..,;--,:v1c*r*

I-' 1 7

./L
. DOCKETING"

. t. r ,

l:lGlCretc=u-y 8RANC~ .

USNkC wa~hinoton, D. L.

(-\t.tE!ntic,n: (;hje;. l>oc~~etinq and Se1*vice=- l::lr.anch Dei=\l' SP-er elar y; 1-'leasr,;, ac.cc>pt: tins p<?titic,n rel-:=ttt?cl to 1c.>LFR 2.802(a)

  • 10 L~t-*R 2.1:loc. (a) stat8s, 11 Any interested p<?rsc.,n ma*; peb t1.on the Lc,mmission to issue, amend c,r re:-st:ir1d any n:~qu1ation."

l re:pect*t'uJ Jy pE-tition the Commi=,sjc.,n to r<?sc:ir,d th~ ruJe

~lllllnch hc1s e) 1m1nat.ed nnancial qua] j f LcationE: *from c.onsid8ration

~nth::? J:ic:cms:ing c,*f "eJec.trjc L1tilJties (JOLt-'R 50.2L:)

1J<?t1nit::ic,ns. 11 '> ~-Je a,*e presently iac:ed 1,-n-t-h the v<=,*y problem!::

which 1 st:ai:<?d or predicted in my :::i-2!:l-!:<4 como,t:nts c,n lhE! rulE-.

10(.;f-f< i=.104(c>(4) anc.l =..0.33(t) e)imir,al:ec.l fl11anc:1al qLt~Ji1icc"ltic.ins ;*1*01n r:on!:'-ideratic.,n in the pJectric util1ty OfH?'i*atinq l1cense hearjngs. *rhese problems a,-e a dc1ng<?, tc, t:h<?

health and 5:i:3.jea,\,y eit tile public.

!:n i-) r l t-lE:.M r UF PF<U.l:IL E:.M:

  • 1ti1? tin::\ncJaL qualiricat1c,n ,*ule doe2.- not al101r, the tini!.nci'll cc.,nclJtJon 01.. the ul:ility tc, be investigat<?d during l1censJnq hec1rings. '!'hu ,*u1e requ1.-.*E-s the assumpl;10,1 ot finc:inciaJ adc:,,qui:3.c-y.

rhjs Rssumpt1c,n c,t tinancjal r1dequacy has JE-d to s<?v<?ral real problems ~~hich lead to u1111E.'c:essary cand 11n,1eeded i*ar.li.ation

pc.,5uree,.
  • 1 n the cc1se ot th1= !:ihoi*eham shu tdo~-m, the p 1 ant w.::1s grant Ed a 1 ic<?,1!::<? cJC=?spj i:e the sllaky finc"lncial condi tJon of the parent u t i l i t y , L.0119 Lslc.111d Lightinq Cr,. L1 tco has adn,ittf')d that ,it* dnes not hav<? sufficient monJes to PRY for dE!com1nissJoning. fhe Stat~

ot M::i,J Yc11*k has ti:tg,i::?8d to picl: up pa,-t of' th!? decommiseiorung cc..st.s.

f-\nc,t:hP.,- co!3t be::!3ides t:inancial is the c:eost in addP-d ,wd!c:1ti.c,n expc,sui*ms. J nci*eRsC?d rad 'i at 1.c,n P.:-:pos1 ti-c? i nr.:-.-ea!::es canc<?r .i:'tnd c,ther health risks. *1hese a:1dded health *,*isl:E in"t.t!VE- added cosl*s which 1..,iould not hc:1vo oc.curr<?d 1t* Shc,rehc:1m hc1r.l nc-,t gc.,nE' crjt.:icaJ, Shc.11-eham ~Jtq*J.-:e,*;s and publit: c11*e l?Xpused tc, rad!c:1t:1or, d11rJriq past C'}..*t?ri:'ttior,, 1uttn-e cl<?c:inLlp and trc1n=1-pr,i-tRtjc-,ri c.,t lho radic,act1ve waste!:. fhe e-=-:pc,sures are, necessary du1*1.ng clean 11p cil1d dt:>c.ommissJonirig c,f the ,adic,active plant. 'fh~ l:lhor2hc1m r<?ac l:o-.* pi*c-,r:fuc.:ed ,*,ug 1 i g i bl e con,me,*c i a 1 e 1 ec ti* l city. (.;c,m11,t:ri: l ,::_;l, J oJ l:..'c l;r ic1. ty j s i.lic> nllJ. y benet*1 t ~\lhich Shon~llt:'1111 c.,p<?rai:1on v-ic-,uJ d h.::1.;E! rJ1*oducE:?d.

i

\

L* , ..

e.

I. 5. NUCI H £! ~FGUl ATORY COMMISSIOO Dor'"* *- '< SEl?.VICt SECTION C * "* '"ECi\ET ARY

,SSION OSI"'" ~ -r., -B" r

c; I

,d, pew,!

ln :2*.1m, oho,*l?harn oµerat;ion has p,*c1 d1.1c.:ed no bene::fit but, h~is Jnc:reased lwa!th r.*c,sts.

(~ similar situatic,n is occ:un in<J wltl, tll<= Limcric:I{ c1nd

!-"C?c1c.l,bcd.:tc.,m NuclQar i-:*(.)wer Plants. these i:ilant:s are pc11*t c,"t P~Lo, the same u t i l i t y . !hey all hav~ slzeab1e problems relat~d tc, 1"' i nanc. l ng.

1-'eac.:hbcit:tom has 5UtferE!d lonCJ shul.:d1.)\.'11,s due to ma:1ny vJolRtions. fh<= Jc:1tost shutdc*~*in may go pc-15t .Jc-1.r,uar'y 1<-;i89 ac:co1*d1,1g tc, st-atC'!rncnts ir, the PE:.Co i,1--house ,1e1--:slE!tter, the SusquC?hrr.1.nna Light <See r.\ll April and May ls:1le5.)

l.i.me,-i.ck '( has tv1r.ed m.:any shutdowns sinem stai*ting lM~ powt:r operai:ion. Yhe pGrsnnneJ who are quRlit.it:?d to 1.-Jorl, on l imm-,ck

-llSCJlt<?hanna L i1;:1ht, 11ay ar,d April !Yi:::18 J::-!:3111:D':'- ) h<71Vf? inatei::lr:I b!:2'£?()

~ C:?S5[.)d into !E'ervict:! tc, return Peac:hbc,t l..c.,1,1 tt, op£:rat ion. Du:: to lac:k c.,*f penac,nnul~ tl,e P~Co orgclnl;-211:1011 !las experienced '/()1/,

ovC?rtJmE rRt~ Jn sC?lec:ted lr.\bor fc.,rces. All thAse problems inc:1--e.ase* the financial burdE!11.

B0th LJmerir.k I and Ji rec:eJve cooling water ~rom the SLtsqttE!hanna Ri'-'er. -,h~ .1Je1a,.,ia,*1:? R1v12r l:!asln Commission c:c.,ntrols the vari&nces und~r ~hiLh Limerlc:I~ I has obtRined c:c.,ollng water.

A majc"* p,*c,babi. Li ty C?xist:s that the SusqLtE!hai',na wiJ ! *f-ai) to prc,vid:::- sut*1"Jcien1: wat::::-r t*c.,r either c,r bc.d:h l.imerich p)Rnts, !"hi=:-

SLtbsr-1r~-11en t shu tdc,~*u1 ~H)) re1' lect pc,c,r l y ttpc,n t:llE! eai Yll 119 pc,~*J.:r c, r*

the Pt.Co c,rgc-1,nizat:ion.

  • 1hc, =-j tu~t.1cin i,1 the- PF..Co sei*vi<.::e ::ll"E!-.l mi.mies th~ situation wh1c.h l1as occ.111rc>r:I in the I.XI.Co E:-er\.1L.:e c1C<?i::\.
I. The*s1:0r,vic.:E.: 3.n~a is grc,ssly c.,ved.Juilt. If Limer1ck iX c.omes c.,n line:::, LL,ic:::rlck 11 will inc.rec1se th<l! caµ.Rc.::ity c.,t* the

.,-stem tc, 6u1/2 m1.,rE> c-apacity than is n<=et.lec.l tc,r summer peal~ load W'A  !-'UC rate case ~6~.)

i:!.. rhe m::11*kel: fc.,r out ot 5ervlce area sales is probJemattcaJ.

t..::Ani::\Ja prGsantJy sells power al: a very low rate, And the r~Jc::.,s ot the F-ec.k*ral En~n;Jy Commissic,n req111rE- uti Ll'l:i<::::s to bit'/ ]r,wesl.:

ava:iJable E.-l<?c.ti*icnJ power RvailRblP,"trc,m the gi:id._ ther:e"tore, PE.L:c, "s el ec tr i c Si:'11 es sut*fc::-r fr-o'in compet i t Lon tr,ti th C..1n-':id i an el~ctr1c Jmports.

8. The F-c-der al PURPA 1*c-qui1*es PEC.:o tD btty r.c*<.,1ii.'ne1*at<?ci e.tectricity clt Jeast c.ost. SaJras req,l:in.::-d by PURl-'A ..,re booming, and thn-!aten tl,e 11£-!?d toi* c:1ddit1onal eJe::c:t1*lc surply.
11. f't::Co has r.1dmi-l:ted tc, being unde,* 1"-Jnanc:i.al press:ur~. *rhe c:ost c.,f Limerick l i..1nd 11 has lc.:*ft PE.Co trnth billions ot* dollars in debt. *rhe rule5 and rw!g1.1lat:ions c,t- bcd*h the !-'A lat'II and th::> PA 1-'UC i*equi rn that unrn:?C1?!::'!Sc1ry Bnd unnE"eded cc1pc1c i ty may not be c.hR~ged in thG rRto b8se. CRp:itRl rec:c.,very is near :impossib18.

rhP. t*JnaricJo7t.l p1*obiP.m<: facing F'l::.Lo t*JjlJ lead to r.1 sJtuati.on mimiclnng tho Shor2ham sj tu.;:d:ion. (4 sh1.1tdo~\ln c.,-f c,ne or mc,rC? o-f the Pr:.t..:o mtt:lcar po1.,ie:,r plants wil 1 ll?ad to a s1t.ui::\tio11 much li.l~e Shc.cn:?hc:1.m. Docc.cmmissic,nin(] a radic*c-1ctivC? powr::ff plant w't.JJ e:;po1=e many wo,*l~e,s ::ir,d 1*e.-sidC:.1nts to un, 18c.:e.-ssa,*y and unne>l?ded ,*c1d ti:\ ti on

<::.>:.-q:.:cc.,1:urt:?s. 1*hl?S:i: addsd hem1l l:h r i sl~s i nvc-. 1 V<? _ addP.d cc.,str=- ~\lh :i.ch wil L c-.ccLu- i t Liin8rick I I gc,es c.:,*1tical. '

lhe:- problf:)m i:;; that; anc.,the1* n11c!oar 11oucr plant 1,,1il) be clossd r.\tter bl?c.oming 1*i:-'ld1oactive. l.imel*i.c!~ 11 1s the plant ve=?,y likely tc, be chc*EE'-!11. *rhc GenE'ral oolut.ion b:, tr.i reqt1ire PECc., tc, demonstrate tinancic:-d q1.1alit.jci:\tion s1:tt*t-it.:iP.rit to decommjssjon a nucl1?a1* po1*m!r µlant. ?Use,, Limericl-: 11 low powe,* lice.-nse and opel ai'jng licsnsQ l,raarings need to stop nc*~-L !'he stoµ c.i*f hearing!:

for Limerick l I i,dll alloH t1m1? to de:,termine fini::\nclcil quRlit'icntjon bstcq*s Ljmer1cl~ I i goF>s critical and becomes

,*adioactive.

Actic,n Requei5tP.d t:o Suspend Licensing Pi*oc.eedinc;:i.

fhe prC?sent t*1nanc.1al cc,ndj-\..Jon c,f Pt:::L'.o reqLdres a suspens;jc,n ot* licf:)r1sini;1 to d1::term1ne adt?qual-~ finc:incial qualification. "fhe nr:?w sjtuRl:1011 taclrrq f'C:Cc., rsqujr<?s that NRC t"inds Pl:::Cc-.

a-nancj-::1.ll}' qualJ-tjed to proceed with Limerick lJ and its c,thei*

1111191clear operatic*ll!3 ln sa.t*et;. Thea p~tjtic.111<?r re::qu~st:s an jmmelJj,3'\-:e stc,p h1 aJJ f-'EL:o hearinqs tc., i:!llecw time for the NF<C to deter111JnC? tllc1t t~c.Co 1s f:inanc.jalJy quali*fjnc;:! to proceed wii;hnut endarn;:i<?r i ng the:! hP.al th <3nd safety i:,f thC'"! pub l Jc-.

Rl?quest ~or SrC?aci.

PetJt.1ecner 1*espi::ct-tully 1*eqltests tha::it the 80 day nc.,tif-ication jn 2.80J:'!(::u !Jr:i r edur.8r.l t*c.,r- gc,od r.r:1usn. l'=ir.lditlccnal timQ wj J l c,nly place PEL:o in gn:;:-,.ter financial hardship *,*educing PECc,'s a!Jility l:o p,*rd,e:,1.:t l:llG< hoi:'tlth ancl si:\f<:ty 01.- tl,e pubUc-.

rt* tht:t Limc*ric.l, n: pJant gc,es crjti.cal, i'he Petitic.ine.- will be cncJ.-"1ngcffd by the ,adioactivl? ~\lastes shipped thru PhilRdelphJR. *1h<? 1-i::\d1t,c\St<? p,oducl.:'d by a nuclC?ai- µe<W£:ff pli::\nt adds tc, the da,*1g8i" a,1d e):pc.,su,P. c,f ,*C?sictent,;,. The petitior,er r,or a,-ea1

,esi dent= wi J l ,P.CC"!J ve no tie.-,c;,-f i t as th:: a,C?i-i. hns c1 vast overc:;ipac1ty of lc,:>e tr*1c rJrocJ1.1ct1c,n. "fhe qrounds are simplv thc.1t i-he:- pci.il-Jon::r wLJl bm e\:posed to mi::\nV cc,sts, he,-dth ,js!,::.

rc1te> ld!~os. i:<nd ur,h,c.,vm 11roblems, while 18C-:P.iv1n<J neqJii_.:ijbJm cr.iri*8sponding bene-f1t.

My 1ntE-resl; j!:S thF.\t a nuclP.ar powe1* plc\nt in this F.\rea gc,Jng c,*it;ical and suhsequf='r,tly c-lc,sing 11,ill e;:µc,st::- sn to r ...1didtic1 11 wJt!iout correspond1n1:1.)b<=n:::>t'jt anct in violRtjcin tc, th<: requir::,n,e,,nt c,t the f tomic E,1cn1y ?)ct. (he Atomic Eneryy Act; £:?'>:ho,- ~s the r'C?doral 8c,ve111mGmt i:o "prc,tect the health anu :afety c-,t tho pub 1 ic." 11 The i..;har l;~1- o*r the tluc J P.c:,r* R<.:~gu 1 atc*i-y Commission chr.1r~es 1,he cc.,rnmissiDn t,d th thr-> ,12spc,risibi J j ty tCJ <.:mt*c,n:e- pc:1r t'.."'- o*f the

.Atc-,mic t:.nei*l)y Ac.t. Spucifically the i..;ommil!:i-01011 is charged wii;li

  • elltorcjng th~ n.?r.p1i,en,c;,nt stated njne Umes in the Acl. -\.c.i
  • "pn:**t8ct rhe health and sc:1tciv c.,t t;11e:- 11uul1c. 11 '!h8 p8t;il;ic,ner i.s a mt::.>mbr.;,r t<-f thm public who will be adver:C?ly c1t'fer:b.:>d by -\.1,e above sl,ut.dDwn ot ::111 l .ar:lioactJVE- 11t1cJec:1,- pe<*H*.>r plant.

ea,-.ir, L  ;,,,.7~

'l!-:!01 R1)C*SP.-12lt: Bl\,d.#62

~./,';?cf?

Pf Ii J i:.\ r

  • f-'i~ l 'i 1 !:i?,

{r J :; ) t,~ri J ::i 11 ~

6-6-88.