ML23131A105
ML23131A105 | |
Person / Time | |
---|---|
Site: | 07109400 |
Issue date: | 05/31/2023 |
From: | NAC International |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML23131A103 | List: |
References | |
ED20230071, EPID L-2023-NEW-0002 | |
Download: ML23131A105 (1) | |
Text
May 2023
Revision 23B
PALADIN Package (PAckage for LArge DImensional coNtents)
ANALYSISSAFETY REPORT
BPMI Application Supplement NON-PROPRIETARY VERSION
Docket No. 71-9400
Atlanta Corporate Headquarters: 3930 East Jones Bridge Road, Norcross, Georgia 30092 USA Phone 770-447-1144, Fax 770-447-1797, www.nacintl.com to ED20230071 Page 1 of 2
Enclosure 1
List of SAR Changes
PALADIN Package SAR, Revision 23B
Supplement to the Initial Application
May 2023 to ED20230071 Page 2 of 2
List of SAR Changes, PALADI N Package SAR, Revision 23B
Chapter 1
Page 1.1-1, modified text in the first paragraph of Section 1.1 where indicated.
Page 1.3-3, modified revision of Proprietary Drawing 50059-L002 where indicated.
Note: non-proprietary drawing was not revised.
Chapter 2
No changes.
Chapter 3
No changes.
Chapter 4
No changes.
Chapter 5
No changes.
Chapter 6
No changes.
Chapter 7
No changes.
Chapter 8
No changes.
ED20230071 - Enclosure 2 Page 1 of 2
Enclosure 2
List of Drawing Changes
PALADIN Package SAR, Revision 23B
May 2023
ED20230071 - Enclosure 2 Page 2 of 2
List of Drawing Changes, PALADIN S AR, Revision 23B
50059-L002, Containment Vessel (CV) Assembly, PALADIN, Rev 1P to ED20230071 Page 1 of 1
Enclosure 3
LOEP and SAR Pages
PALADIN Package SAR, Revision 23B
Application Supplement
May 2023 May 2023
Revision 23B
PALADIN Package (PAckage for LArge DImensional coNtents)
ANALSAFETY YSIS REPORT
NON-PROPRIETARY VERSION
Docket No. 71-9400
Atlanta Corporate Headquarters: 3930 East Jones Bridge Road, Peachtree Corners, Georgia 30092 USA Phone 770-447-1144, Fax 770-447-1797, www.nacintl.com This page intentionally left blank PALADIN Package SAR May 2023 Docket No. 71-9400 Revision 23B
List of Effective Pages
Chapter 1 Page 4.4-1......................... Revision 23A Page 1-i thru 1-ii............... Revision 23A Page 4.5-1......................... Revision 23A Page 1-1............................ Revision 23A Page 1.1-1.......................... Revision 23B Chapter 5 Page 1.1-2......................... Revision 23A Page 5-i thru 5-iii.............. Revision 23A Page 1.2-1 thru 1.2-10....... Revision 23A Page 5-1............................ Revision 23A Page 1.3-1 thru 1.3-2......... Revision 23A Page 5.1-1 thru 5.1-2......... Revision 23A Page 1.3-3.......................... Revision 23B Page 5.2-1 thru 5.2-2......... Revision 23A Page 5.3-1 thru 5.3-5......... Revision 23A Page 5.4-1 thru 5.4-8......... Revision 23A 6 drawings (see Section 1.3) Page 5.5-1......................... Revision 23A
Chapter 2 Chapter 6 Page 2-i thru 2-iv.............. Revision 23A Page 6-i............................. Revision 23A Page 2-1............................ Revision 23A Page 6-1............................ Revision 23A Page 2.1-1 thru 2.1-18....... Revision 23A Page 2.2-1 thru 2.2-7......... Revision 23A Chapter 7 Page 2.3-1 thru 2.3-4......... Revision 23A Page 7-i............................. Revision 23A Page 2.4-1 thru 2.4-2......... Revision 23A Page 7-1............................ Revision 23A Page 2.5-1 thru 2.5-4......... Revision 23A Page 7.1-1 thru 7.1-6......... Revision 23A Page 2.6-1 thru 2.6-17....... Revision 23A Page 7.2-1 thru 7.2-2......... Revision 23A Page 2.7-1 thru 2.7-33....... Revision 23A Page 7.3-1 thru 7.3-3......... Revision 23A Page 2.8-1......................... Revision 23A Page 7.4-1......................... Revision 23A Page 2.9-1......................... Revision 23A Page 7.5-1......................... Revision 23A Page 2.10-1....................... Revision 23A Page 2.11-1....................... Revision 23A Chapter 8 Page 2.12-1 thru 2.12-3..... Revision 23A Page 8-i thru 8-ii............... Revision 23A Page 8-1............................ Revision 23A Chapter 3 Page 8.1-1 thru 8.1-3......... Revision 23A Page 3-i thru 3-iii.............. Revision 23A Page 8.2-1 thru 8.2-7......... Revision 23A Page 3-1............................ Revision 23A Page 8.3-1......................... Revision 21A Page 3.1-1 thru 3.1-5......... Revision 23A Page 3.2-1 thru 3.2-3......... Revision 23A Page 3.3-1 thru 3.3-7......... Revision 23A Page 3.4-1 thru 3.4-10....... Revision 23A Page 3.5-1......................... Revision 23A
Chapter 4 Page 4-i thru 4-ii............... Revision 23A Page 4-1............................ Revision 23A Page 4.1-1 thru 4.1-3......... Revision 23A Page 4.2-1......................... Revision 23A Page 4.3-1......................... Revision 23A
Page 1 of 1 This page intentionally left blank PALADIN Package SAR May 2023 Docket No. 71-9400 Revision 23B
1.1 Introduction
The PALADIN transport system is designed as a Type B(U) per 10 CFR 71.4 [1.8] and Category III container per Regulatory Guide 7.11 [1.7]. In more detail, Type B(U) packaging refers to fissile material packaging together with its fissile material contents that requires unilateral approval of international shipments. Whereas a Category III container specifies that contents have less than 30,000 Ci as well as 30 A2 and A 1 quantities of both special and normal f orm radioactive material. However, for the purpose of this SAR, the packages currently authorized radioactive contents consist of an irradiated Reactor Vessel, containing residual water and absorbent materials with limited quantities of Transuranic (TRU ) and fissile waste, such that they do not exceed Type A quantities. The package is designed to be transported by rail, sea, and highway via railcar, barge, and heavy-haul vehicle, respectively, under exclusive-use controls. The Maximum Normal Operating Pressure (MNOP) of the package is with a vessel design pressure of used for structural evaluation and fabrication testing.
The packaging, described in greater detail in Section 1.2.1, consists of two (2) main components; a Containment Vessel (CV) and an Impact Limiter System (ILS), as shown in Figure 1-1. The CV is a stainless-steel vessel with a bolted closure designed to the leak-tight containment criterion in accordance with ANSI N14.5-2014 [1.1]. Additionally, the CV provides shielding, structural, and thermal protection to the contents. The ILS consists of both permanently installed and removable components designed to reduce the direct impact loading and protect the package containment boundary from the effects of the Normal Conditions of Transport (NCT) free drops and Hypothetical Accident Conditions (HAC) free drops.
This SAR demonstrates the packaging meets the applicable requirements of 10 CFR 71 [1.8].
The basis for qualification is the safety analysis contained herein.
NAC International 1.1-1 PALADIN Package SAR February 2023 Docket No. 71-9400 Revision 23A
Figure 1-1 PALADIN Packaging
NAC International 1.1-2