ML23130A148

From kanterella
Jump to navigation Jump to search
Submittal of Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report
ML23130A148
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/19/2023
From: Hilbert L
Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
23-083
Download: ML23130A148 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 19, 2023 United States Nuclear Regulatory Commission Serial No.:* 23..:033 Attention: Document Control Desi< NAPS: CNC.

Washirgton, D. C. 20555 Docket Nos.: 50-338/339

  • 72-16 72-56 Licens~* Nos.: NPF-4/7 SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Enclosed is the 2022 Annual Radioactive Effluent Release Report. This. report is provided pursuant to No,rth Anna Units 1 and 2 Technical Specification 5.6.3 [10 CFR 50.36a] arid North Anna Independent Spent Fuel Storage Installation Technical Specification 5.5:2c [10 CFR 72.44(d)(3)].

If you have any questions or require additional information, please contact Mr. Marcus A. Hofmann at (540) 894-2100 ..

Very truly ~Js,A __,, *

. ~U1zf)f Lisa Hilbert Site Vice President Enclosure Commitments made in this letter: None

re*J/f

. fJ"15:_5 '2-~

,;J/i<_

/Uf--1S?

Serial No.23-083 NAPS Annual Radioactive Effluent Release Report Page 2 of 2 cc: U. S. Nuclear Regulatory Commission (w/o Enclosure)

  • Region II
  • Marquis One Tower 245-Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management (w/o Enclosure)

Office of Nuclear .Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555 NRG Senior Resident Inspector (w/o Enclosure)

North Anna Power Station