MEMORANDUM TO: Michael J. Wentzel, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF FEBRUARY 17, 2023, MEETING TO DISCUSS RADIANT INDUSTRIES QUESTIONS ON MANUFACTURING LICENSES AND REGULATORY GUIDE 1.232 On February 17, 2023 (Agencywide Documents Access and Management System Accession No. (ADAMS) ML23046A038), the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting to discuss Radiant Industries questions pertaining to manufacturing licenses and Regulatory Guide (RG) 1.232, Guidance for Developing Principal Design Criteria for Non-Light Water Reactors. Staff from Radiant Industries (Radiant) used the slides in ADAMS Accession No. ML23048A271 to guide the discussion.
The NRC staff addressed Radiant Industries questions pertaining to activities that are permissible prior and after obtaining a manufacturing license. In addition, the NRC staff clarified that Criterion 17 of RG 1.232 discusses two power sources, an onsite and an additional power system for meeting the redundancy requirement. Radiant Industries staff also asked if a high temperature gas reactor design that utilizes peripheral control drums for reactivity control and shutdown can satisfy RG 1.232 criterion 26 by utilizing 3 independent groups of drums. The NRC staff indicated that Radiant Industries should consider submitting a white paper providing additional details pertaining to their design to obtain feedback from the NRC staff on this matter.
The meeting attendee list is enclosed.
Project No.: 99902106
Enclosures:
As stated CONTACT:
Adrian Muniz, NRR/DANU 301-415-4093 May 11, 2023 Signed by Muniz Gonzalez, Adrian on 05/11/23
ML23128A103 NRC-001 OFFICE NRR/DANU/UAL2/PM NRR/DANU/UAL2/BC NRR/DANU/UAL2/PM NAME AMuniz MWentzel AMuniz DATE 5/10/2023 5/10/2023 5/11/2023 List of Attendees NAME ORGANIZATION Doug Bernauer Radiant Industries Elliott Korb Radiant Industries Ben Betzler Radiant Industries Chris Fanning Radiant Industries James Tomkins Radiant Industries Adrian Muniz U.S. Nuclear Regulatory Commission (NRC)
Amy Cubbage NRC Jeffrey Schmidt NRC Michael Wentzel NRC William Kennedy NRC Julie Ezell NRC Mike Montecalvo TerraPower Christopher Chwasz Idaho National Laboratory Leigh Lloveras The Breakthrough Institute Rani Franovich The Breakthrough Institute Adam Stein The Breakthrough Institute Rob Burg Bryce Salmi James Kinsey R. Sweeney Jana Bergman Curtiss Wright Brian Mettenbrink