ML23122A319

From kanterella
Jump to navigation Jump to search
Cyber Security Inspection Report 05200025/2023401
ML23122A319
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/04/2023
From: Read M
Division Reactor Projects II
To: Whitley B
Southern Nuclear Operating Co
References
IR 2023401
Download: ML23122A319 (1)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION (U) Brian H. Whitley Nuclear Development Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243 (U)

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 - CYBER SECURITY INSPECTION REPORT 05200025/2023401 OUO (U)

Dear Brian H. Whitley:

(U) On March 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Unit 3 and discussed the results of this inspection with Tim Drouin and other members of your staff. The results of this inspection are documented in the enclosed report.

(U) Three findings of very low security significance (Green) are documented in this report. Three of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

(U) If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Vogtle Electric Generating Plant, Unit 3.

(U) The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.1] - Resources, one [H.8] -

Procedure Adherence, and one [H.9] - Training.

(U) If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response (NSIR); and the NRC Resident Inspector at Vogtle Electric Generating Plant, Unit 3.

May 3, 2023

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION B. Whitley 2

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION (U) This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

(U) The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

(U) Sincerely, (U) Mac M. Read, Jr., Chief Engineering Branch 2 Division of Reactor Safety (U) Docket No. 05200025 License No. NPF-91 (U)

Enclosure:

As stated (U) cc w/o encl: Distribution via LISTSERV Signed by Read, Carey on 05/03/23

ML23122A319 (Cover letter)

Cover Letter Only:

X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DRS RII/DRS HQ:NSIR RII/DRS NAME P. Braaten M. Singletary M. Brown M. Read DATE 05/02/2023 05/03/2023 05/02/2023 05/03/2023