MONTHYEARML25055A2132025-02-24024 February 2025 NRR E-mail Capture - Fyi Spring 2025 Steam Generator Inspection Calls (Vogtle Unit 2 Not Selected) ML25052A2562025-02-21021 February 2025 Acceptance Review - Vogtle Units 3 and 4 - LAR to Move SRs from TS 3.3.15 and 3.3.16, ESFAS Actuation Logic - EPID L-2025-LLA-0013 ML25042A1112025-02-11011 February 2025 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - License Renewal Commitment Item 20 - a Plant-specific Analysis of Certain Reactor Vessel Internal Components (L-2025-LLL-0002) ML25041A1942025-02-10010 February 2025 NRR E-mail Capture - Acceptance Review - SNC Fleet - Quality Assurance Topical Report (QATR) and Nuclear Development Quality Assurance Manual (Ndqam) Change Under 10 CFR 50.54(a) to Adopt RG 1.8, Rev. 4 (L-2025-LLQ-0000) ML25041A1952025-02-10010 February 2025 NRR E-mail Capture - Acceptance Review - SNC Fleet License Amendment Request (LAR) to Relocate TS 5.3.1 to Quality Assurance Topical Report (QATR) and Nuclear Development Quality Assurance Manual (Ndqam) (L-2025-LLA-0010) ML25034A2382025-02-0303 February 2025 Document Request for Vogtle Electric Generating Plant Units 1&2 Baseline Radiation Protection Inspection Inspection Report 2025 01 ML25029A0052025-01-28028 January 2025 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 License Renewal Commitment No. 12 - a Plant-Specific Analysis of Nickel Alloy Management Program (L-2025-LLL-0000) ML25021A2492025-01-21021 January 2025 Email Capture - Acceptance Review - Vogtle, Units 1 and 2-Proposed LAR to Revise TS SR 3.6.6.8 ML25013A2582025-01-13013 January 2025 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - License Amendment Request to Increase Flexibility in Mode Restraints ML25010A0682025-01-0909 January 2025 NRR E-mail Capture - Acceptance Review for Vogtle 2 Alternative Request for 2A and 2B Charging Pumps ML25008A1032025-01-0808 January 2025 Acceptance Review of Amendment Request to Implement TSTF-554 ML25008A0202025-01-0808 January 2025 NRR E-mail Capture - (External_Sender) Question - Southern Nuclear Operating Co., Inc. Fleet Physical Security Exemptions ML24365A1172024-12-28028 December 2024 57483-EN 57483 - Attachment Removed - Part 21 Report. Ametek Solidstate Controls Interim Part 21 Notification ML24346A0342024-12-11011 December 2024 NRC Email Dated December 11, 2024, - Draft Meeting Summaries - Pre-Submittal Meeting - Vogtle 3 and 4 - Proposed Modes 5 and 6 LAR ML24345A2572024-12-0909 December 2024 SNC Email Dated December 9, 2024, - Meeting Summary - Pre-Submittal Meeting - Vogtle 3 and 4 - Proposed Modes 5 and 6 LAR ML24339B8202024-12-0404 December 2024 Vogle Electric Generating Plant, Units 3 and 4 - Email Capture - Acceptance Review - Vogtle 3 and 4 - TS 3.3.8 ESFAS - SR Neutron Flux Doubling ML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing 2025-02-03
[Table view] |
Text
From:
Cayetano Santos Sent:
Monday, May 1, 2023 12:55 PM To:
Vogtle PEmails
Subject:
SNC presentation for 5-25-23 public meeting on late-filed allegations Attachments:
late filed allegation-public meeting.pdf
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
662 Mail Envelope Properties (MW4PR09MB90101EDDAFA08D84A7F9FF1CE56E9)
Subject:
SNC presentation for 5-25-23 public meeting on late-filed allegations Sent Date:
5/1/2023 12:54:33 PM Received Date:
5/1/2023 12:54:37 PM From:
Cayetano Santos Created By:
Cayetano.Santos@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>
Tracking Status: None Post Office:
MW4PR09MB9010.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3
5/1/2023 12:54:37 PM late filed allegation-public meeting.pdf 207423 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Amanda Tyson Project Manager-Allegations Southern Nuclear Operating Company May 25, 2023 Late Filed Allegation Response
2 Late Filed Allegation Response SNC Resources:
Designated Teams - Investigator & Subject Matter Expert 24/7 Coverage SNC Reports & Attributes:
Background
ITAAC Related / Safety Related / Overriding Safety Issue Evaluation & Response Extent of Condition SNC Point of
Contact:
Amanda Tyson
3 Late Filed Allegation Response Comments and Feedback