Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:
ANO Unit 2 First Exam Date:
3/15/2023 Written Exam Outline (10/21/22)
Comment Resolution 1 NRC Generated None Required 2 Verify Written Admin Date Written Date - 3/15/2023 Admin Date - 3/20/2023 Administrative JPM Outline (10/21/22)
Comment Resolution 1
Absolute minimum required on new material; discuss possibility of seeing some more new JPMs.
Discuss with chief Control Room / In-Plant System JPM Outline (10/21/22)
Comment Resolution 1
Absolute minimum required on new material; discuss possibility of seeing some more new JPMs.
Discuss with chief 2 JPM P1 - Discuss possibility of using the mock-up for this JPM Using mock-up
OBDI 202 - IOLE Process Rev 3 Simulator Scenario Outline Comments (10/21/22)
Comment Resolution 1
All - Review critical tasks to ensure bounding criteria are as specific as is possible, including detailed explanation for bounding criteria (time limit, even if an approximation, if possible).
(Discussion item)
Discuss with chief.
2 All - Discuss any potential similarities with past exams (Discussion item)
Discuss with chief.
3 Scenario 1, CT1: Is there a time limit expectation for completion of SPTAs?
Discuss with chief 4 Scenario 1, CT 2: Where does the 30 minutes come from?
From ops approved critical task list 5 Scenario 1 has no contingency action procedure entry None Required (noted for tracking) 6 Scenario 2, CT 1: Where does the 30 minutes come from?
Operations management expectation 7 Scenario 2, CT 2: Why 70 inches?
70 inches triggers once through cooling 8 Scenario 2 has no contingency action procedure entry None Required (noted for tracking) 9 Scenario 3 must be part of the scenario set, as it is the only scenario with entry into contingency action procedures None Required (noted for tracking)
DRAFT SCHEDULE In scenarios, two examiners should be assigned three applicants, and two examiners should be assigned two applicants (assign Clyde three with at least one of the upgrades, please)
Add one simulator JPM to administer at end of day Tuesday and Wednesday; administer three simulator JPMs Thursday