ML23111A233

From kanterella
Jump to navigation Jump to search
Email- S. Murray (GEH) to G. Wertz (NRC)- Review of Proposed GEH Lr License - Summary of Changes Oath & Affirmation
ML23111A233
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 04/21/2023
From: Murray S
GE-Hitachi Nuclear Energy Americas
To: Geoffrey Wertz
NRC/NRR/DANU/UNPL
References
Download: ML23111A233 (1)


Text

From: Murray, Scott P. (GE Power Portfolio)

To: Geoffrey Wertz Cc: Linh Tran; Duane Hardesty; Michael Balazik; McConnell, Thomas J (GE Power Portfolio); PEDLEY, CHARLES (GE Power Portfolio)

Subject:

[External_Sender] RE: Review of proposed GEH LR license - Summary of Changes/Oath & Affirmation Date: Friday, April 21, 2023 12:17:13 PM Summary of NTR R-33 license changes from Amendment 25:

Items 2 B (2) b and c: Have been deleted due to experiments utilizing these materials are no longer performed.

Items 2 B (2) d and e: Have been combined and re-written as Item 2 B (2) b.

Item 2 B (4): Has been deleted due to experiments utilizing these materials are no longer performed.

Item 2 B (2) d: GEH has requested a reduction in the SNM limit. Requirements of LC 2 B (2) d and 2 B (2) e have been combined into new LC 2 B (2) b.

Proposed LC 2.B.(3).b: adding a limit of 0.03 curies to byproduct material in the form of sealed sources for instrument calibration and source checks.

I declare under penalty of perjury that this information is true and correct.

Executed on April 21, 2023 Scott Murray From: Geoffrey Wertz <Geoffrey.Wertz@nrc.gov>

Sent: Thursday, April 13, 2023 4:08 PM To: McConnell, Thomas J (GE Power Portfolio) <thomas.mcconnell@ge.com>; Murray, Scott P. (GE Power Portfolio) <Scott.Murray@ge.com>; PEDLEY, CHARLES (GE Power Portfolio)

<CHARLES.PEDLEY@ge.com>

Cc: Linh Tran <Linh.Tran@nrc.gov>; Duane Hardesty <Duane.Hardesty@nrc.gov>; Michael Balazik

<Michael.Balazik@nrc.gov>

Subject:

EXT: Review of proposed GEH LR license.

WARNING: This email originated from outside of GE. Please validate the sender's email address before clicking on links or attachments as they may not be safe.

Hi Tom, as discussed, attached is a draft of the proposed renewal license for GEH NTR.

Please perform a final review and advise if any changes are needed.

Also, GEH staff requested removal of license conditions (LCs): 2.B.(2) b, 2.B.(2) c, and 2.B.

(4), as they are no longer needed. Provide affirmation of your request to remove these LCs in your email response.

GEH also requested a change (reduction) in the SNM limits provided in current LC 2.B.(2) d., and that the requirements be combined with current LC 2.B.(2).e. in proposed LC 2.B.

(2).b. Provide affirmation of this change.

Finally, note that your email response will need to include an Oath and Affirmation statement, and will be made publicly available in our documents system, ADAMS.

Thanks Geoffrey Wertz, P.E.

Non-Power Production and Utilization Facility Licensing Branch (UNPL)

Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)

Office of Nuclear Reactor Regulation Work 301-415-0893 Mobile 434-485-6159 geoffrey.wertz@nrc.gov