Constellation" SVP-23-013 April 11, 2023 U.S. Nuclear Regulatory Commission Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR 30 NRC Docket No. 50-254 and 50-265 10 CFR 50
Subject:
Core Operating Limits Reports for Quad Cities Unit 1 Cycle 28 and Quad Cities Unit 2 Cycle 27 Revised
References:
Letter from Brian Wake (Constellation Energy Generation, LLC) to the U.S. NRC (Regional Administrator, Region Ill), "Core Operating Limits Report for Quad Cities Unit 2 Cycle 27," dated April 8, 2022 Quad Cities Nuclear Power Station (QCNPS) Unit 1 was shutdown for Refuel Outage 27 (01 R27) on March 27, 2023. In accordance with Technical Specifications Section 5.6.5.d, enclosed is the Core Operating Limits Report (COLR) for Quad Cities Unit 1 Cycle 28.
QCNPS Unit 2 has been in Cycle 27 since April 2022. Technical Specification scram speeds have been updated with License Amendment Numbers 292 and 288 which required revision to the COLR. In accordance with Technical Specifications Section 5.6.5.d, enclosed is the revised COLR for Quad Cities Unit 2 Cycle 27.
Should you have any questions concerning this letter, please contact Mark Humphrey at (309) 227-2800.
Respectfully, Brian Wake Site Vice President Quad Cities Nuclear Power Station
Enclosures:
Core Operating Limits Report for Quad Cities Unit 1 Cycle 28 Core Operating Limits Report for Quad Cities Unit 2 Cycle 27 - Second Revision cc:
Regional Administrator - NRC Region Ill NRC Senior Resident Inspector-Quad Cities Nuclear Power Station