ITAAC Notification Checklist (Ipcnc) 2.5.02.07a for ITAAC (Index No. 534) for Vogtle Unit 4 Combined License (VOG4)
ML23096A004
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/05/2023
From: Garry Armstrong
NRC/NRR/VPOB
To:
References
IPCNC 2.5.02.07a for ITAAC Index No. 534
Download: ML23096A004 (2)


Text

ITAAC Closure Verification Evaluation Form (VEF-IPCN)

A Lead Reviewer in concert with other reviewer(s) assigned to an ITAAC closure review will complete this form for the ITAAC under review.

Docket No: 5200026 Plant Name: Vogtle Unit 4 Combined License Licensee Name: Southern Nuclear Operating Combined NPF-92 Company, Inc License No:

ITAAC ID No: 2.5.02.07a ITAAC Type: Targeted ITAAC Family Designation or 10E enter N/A:

ITAAC Post-Closure Notification (IPCN) ADAMS ML No: ML23093A199 Lead Reviewer: Garry Armstrong Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.

a. Yes The IPCN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number and (4) plants docket number.
b. Yes The ITAAC as stated in the IPCN matches the version of the ITAAC in the combined license.
c. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Determination Basis (IDB) of the IPCN, in combination with its associated ICN of record, contains sufficient information including a summary of the methodology for performing the ITAAC to demonstrate that the licensee has successfully performed the inspection, test, and/or analysis stated in the ITAAC.

The methodology described in the IDB of the IPCN either was reviewed and approved by the NRC or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.

d. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the IDB of the IPCN, in combination with its associated ICN of record, contains sufficient information to demonstrate that the licensee has fully met the entire acceptance criterion stated in the ITAAC.
e. N/A For ITAAC specified as being re-performed on as-built structures, systems, or components (SSCs): If the licensee performed the inspections, tests, and/or analyses of the ITAAC at locations other than Page 1 of 2

ITAAC Closure Verification Evaluation Form (VEF-IPCN) the final installed location, the licensee has based on the guidance in NEI 08-01 either summarized a technical justification or provided a reference to a generic technical justification in the IDB of the IPCN that establishes why it was acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC was not re-performed at a remote location or if the ITAAC is not specified as as-built.]

f. N/A If ITAAC is a Reference ITAAC, all the ITAAC it references have been verified as successfully completed. (Enter N/A if ITAAC is not a reference ITAAC.)
g. Yes All planned inspections for this ITAAC (if any) have been completed as indicated in the Construction Inspection Program Management System (CIPIMS). Either NRC inspectors found no ITAAC findings for this ITAAC or any ITAAC findings are closed as indicated in CIPIMS and the IPCN for this ITAAC.
h. Yes The IPCN indicates that the licensee maintained the ITAAC in a closed state as affirmed by the signature of a licensee representative.
i. No During concurrence review, a potential problem was identified which prevents verifying the completion of the ITAAC.
j. No An additional reviewer was assigned to the ITAAC closure review with his or her name entered into the blanks at the top of this page based on his or her expertise being required.

If the reviewers have verified that the licensee successfully completed the inspections, tests, and analyses prescribed for this ITAAC, and that the acceptance criteria have been met, then this determination is based on information available at the time and is subject to the licensees ability to maintain the condition that the acceptance criteria are met. If the staff receives new information suggesting that the staffs determination on this ITAAC is incorrect, then the staff will determine whether to reopen this ITAAC. A positive NRC staff determination on this ITAAC will be used to support a subsequent finding, pursuant to 10 CFR 52.103(g), at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure verification process is not finalized for this ITAAC until the NRC makes an affirmative finding under 10 CFR 52.103(g).

Lead Reviewer: Garry Armstrong Date: 4/5/2023 Lead Approver: Christopher Welch Date: 4/5/2023 Licensing PM: Garry Armstrong Page 2 of 2