PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules
Letter Sequence Meeting | |
---|---|
EPID:L-2023-LRM-0021, (Open) | |
MONTHYEARPMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023
[Table View]Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules Project stage: Meeting ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 Project stage: Meeting ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements Project stage: Meeting 2023-04-05 |
ML23095A055 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 04/05/2023 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20230288 | |
Download: ML23095A055 (3) | |
Similar Documents at Peach Bottom | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20241330, Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-10-18018 October 2024
[Table view]Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20240898, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-07-0808 July 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20240449, Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-05-10010 May 2024 Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 ML24109A0412024-04-18018 April 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL & Sus ML24100A0552024-04-15015 April 2024 Constellation - Closed Meeting Notice Regarding a Future Topical Report Submittal PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20168A2782020-06-16016 June 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) Corrected Registration Link ML20139A1532020-05-18018 May 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19136A0962019-05-15015 May 2019 Notice of Category 3 Public Meeting (Webinar) - Joint Annual Assessment Meeting for Beaver Valley, Limerick, Peach Bottom, Susquehanna, and Three Mile Island ML19109A0362019-04-23023 April 2019 License Amendment Request to Revise Technical Specifications for a Temporary One-Time Extension of Completion Time ML18100A2112018-04-26026 April 2018 Notice of Public Meeting May 24, 2018 ML17090A1282017-04-0505 April 2017 Notice of Public Meeting with Exelon Generation Company, LLC to Discuss Nrc'S Assessment of Safety Performance at Peach Bottom Atomic Power Station for 2016 ML16081A3492016-03-21021 March 2016 Notice of Annual Assessment Meeting - Peach Bottom Atomic Power Station, Units 2 & 3, on April 6, 2016 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML15070A5272015-03-11011 March 2015 April 16, 2015 Notice of Public Meeting on Peach Bottom Atomic Power Station, Units 2 & 3, with Exelon Generation Company, LLC ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14071A5892014-03-12012 March 2014 Notice of Category 3 Meeting with Exelon to Discuss Peach Bottom Performance During Calendar Year 2013 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13077A4392013-03-18018 March 2013 Notice of Public Meeting - Peach Bottom Atomic Power Station, Units 2 and 3, to Discuss the Nrc'S Assessment of Safety Performance for 2012 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML12116A0812012-04-25025 April 2012 Update - Peach Bottom Atomic Power Station - Notice of Public Meeting with Exelon Generation Company, LLC, on April 25, 2012 ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML12080A0332012-03-20020 March 2012 Notice of Public Meeting with Exelon to Discuss Performance at Peach Bottom During Calendar Year 2011 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109101082011-04-0101 April 2011 Annual Assessment Meeting Notice-REVISED-LOCATION Change ML1106911972011-03-10010 March 2011 Notice of Licensee Meeting - Peach Bottom Atomic Power Station, Units 2 and 3, to Review Results of Nrc'S Assessment of Safety Performance of Peach Bottom Atomic Power Station for Calendar Year 2010 ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML1007605232010-03-17017 March 2010 Notice of Licensee Meeting 4/19/2010 ML0928704322009-10-14014 October 2009 Revised Meeting Notice for Exelon Re Pre-application Meeting to Discuss Exelon Plans to Submit Power Uprate Requests ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet 2024-07-08 Category:Meeting Agenda MONTHYEARPMNS20241330, Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-10-18018 October 2024
[Table view]Meeting with Constellation Energy Generation, LLC to Discuss a Planned Licenseamendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-10-0909 October 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 PMNS20240898, Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-07-0808 July 2024 Meeting with Constellation Energy Generation, LLC to Discuss a Planned License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) PMNS20240449, Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 32024-05-10010 May 2024 Meeting with Constellation Energy Generation, LLC to Discuss a License Amendment Request for a Digital Instrumentation and Controls Upgrade at Peach Bottom Atomic Power Station, Units 2 and 3 PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19298C0222019-11-0505 November 2019 Agenda - Peach Bottom APS 2 and 3 Sc Draft Meeting Agenda - Sc - November 5, 2019 ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109101082011-04-0101 April 2011 Annual Assessment Meeting Notice-REVISED-LOCATION Change ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML1007605232010-03-17017 March 2010 Notice of Licensee Meeting 4/19/2010 ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0908404402009-03-25025 March 2009 Notice of Meeting with Exelon Generation Co., LLC, Peach Bottom, Units 2 & 3, to Discuss Result of Nrc'S Assessment of Safety Performance ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0809406822008-04-0303 April 2008 Notice of Public Meeting with Exelon Generation Co., LLC, Peach Bottom SCWE ML0802501172008-01-15015 January 2008 1/15/2008 Slides from Drop-in Visit Exelon/Amergen ML0732006962007-11-16016 November 2007 Notice of Meeting with Exelon Generating Company, NRC Staff Will Inform Exelon Management of Results of NRC Follow-Up Inspection (November 5-9, 2007), That Continued Review Security Events at Peach Bottom Atomic Power Station ML0707804282007-03-19019 March 2007 Notice of Meeting with Exelon Generating Company, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Peach Bottom for Calendar Year 2006 ML0705700372007-03-13013 March 2007 Summary of Meeting with Exelon Generation Co. on Pre-Submittal of Licensing Amendment for an Alternate Source Term for Peach Bottom, Units 2 & 3 ML0706003912007-02-27027 February 2007 Revised Notice of Meeting with Exelon Generation Co., LLC to Discuss Licensing Issues and Schedule of Upcoming Licensing Activities with the Exelon Fleet of Nuclear Power Plants (Braidwood, Units 1 and 2, Byron, Unit Nos. 1 and 2; Clinton.. ML0703605402007-02-15015 February 2007 Forthcoming Meeting with Exelon Generation Company to Discuss Licensing Activities 2024-07-08 |
Text
March 24, 2023
Title:
Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules Date(s) and Time(s): April 11, 2023, 01:30 PM to 03:30 PM ET Location: Webinar Category: This is an Observation Meeting. This is a meeting in which attendees will have an opportunity to observe the NRC performing its regulatory function or discussing regulatory issues. Attendees will have an opportunity to ask questions of the NRC staff or make comments about the issues discussed following the business portion of the meeting; however, the NRC is not actively soliciting comments towards regulatory decisions at this meeting.
Purpose:
The U.S. Nuclear Regulatory Commission (NRC) staff and Constellation Energy Generation, LLC (the licensee) will discuss the licensee's plans to request an exemption from Part 26 regulations pertaining to work-hour requirements.
Contact:
Audrey Klett Elena Herrera Sujata Goetz 301-415-0489 301-415-8208 301-415-8004 Audrey.Klett@nrc.gov Maria.HerreraTorres@nrc.gov Sujata.Goetz@nrc.gov
Participants:
NRC External Office of Nuclear Reactor Regulation Constellation Energy Generation, LLC URL Meeting Number Password Webinar:
https://teams.microsoft.com/l/meetup- (301) 576-2978 430188943#
join/19%
3ameeting_OTgyNWY4MzEtMzUyZC00ZjB lLTg2NzQtMTM5NzVmNmUyYTFl%
40thread.v2/0?context=%7b%22Tid%22%
3a%22e8d01475-c3b5-436a-a065-5def4c64f52e%22%2c%22Oid%22%3a%
2294597a67-4fa9-4814-92a1-b86d5c96e363%22%7d Docket No: 05000277 05000278 Comments: All meeting times are in Eastern time.
The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting or need a meeting notice or the transcript or other information from a meeting in another format (e.g. braille, large print), please contact Anne Silk, NRC Reasonable Accommodations Coordinator, at Anne.Silk@nrc.gov or call directly at 301-287-0745.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Ten (10) days advance notice is requested to try to ensure availability; however, every effort will be made to address a request for reasonable accommodations with less notice.
PUBLIC MEETING AGENDA
Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules April 11, 2023, 01:30 PM to 03:30 PM ET Webinar
ADAMS Accession Number: ML23095A055 Distribution:
Office NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM Name Audrey Klett KEntz Hipo Gonzalez Audrey Klett Date 03/22/2023 03/22/2023 03/23/2023 03/24/2023 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20230288 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 86 FR 14964, March 19, 2021 ADAMS No. ML21050A046 https://www.nrc.gov/reading-rm/doc-collections/commission/policy/index.html