ML23088A135

From kanterella
Jump to navigation Jump to search
Enclosure 6 - Attachment to License Amendment No. 166 for COL No. NPF-92
ML23088A135
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/04/2023
From: Bill Gleaves
NRC/NRR/VPOB
To: Brown K
Southern Nuclear Operating Co
References
Download: ML23088A135 (1)


Text

Technical Specifications ESFAS Startup Feedwater Flow Instrumentation 3.3.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.11.1 -----------------------------------------------------------------------

- NOTE -

This surveillance shall include verification that the time constants are adjusted to within limits.

Perform CHANNEL CALIBRATION in accordance 24 months with Setpoint Program.

SR 3.3.11.2 Verify ESF RESPONSE TIME is within limit. 24 months on a STAGGERED TEST BASIS VEGP Units 3 and 4 3.3.11 - 2 Amendment No. 168 (Unit 3)

Amendment No. 166 (Unit 4)