ML23088A135
Jump to navigation
Jump to search
| ML23088A135 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/04/2023 |
| From: | Bill Gleaves NRC/NRR/VPOB |
| To: | Brown K Southern Nuclear Operating Co |
| References | |
| Download: ML23088A135 (1) | |
Text
Technical Specifications ESFAS Startup Feedwater Flow Instrumentation 3.3.11 VEGP Units 3 and 4 3.3.11 - 2 Amendment No. 168 (Unit 3)
Amendment No. 166 (Unit 4)
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.11.1
- NOTE -
This surveillance shall include verification that the time constants are adjusted to within limits.
Perform CHANNEL CALIBRATION in accordance with Setpoint Program.
24 months SR 3.3.11.2 Verify ESF RESPONSE TIME is within limit.
24 months on a STAGGERED TEST BASIS