ML23088A134
Jump to navigation
Jump to search
| ML23088A134 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/04/2023 |
| From: | Bill Gleaves NRC/NRR/VPOB |
| To: | Brown K Southern Nuclear Operating Co |
| References | |
| Download: ML23088A134 (1) | |
Text
Technical Specifications SDM 3.1.1 VEGP Units 3 and 4 3.1.1 - 1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)
LCO 3.1.1 The SDM shall be within the limits specified in the COLR.
APPLICABILITY:
MODE 2 with keff < 1.0.
MODES 3, 4, and 5.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
SDM not within limits.
A.1 Initiate boration to restore SDM to within limits.
15 minutes SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM to be within limits.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />