ML23073A374
From kanterella
Jump to navigation
Jump to search
ML23073A374 | |
Person / Time | |
---|---|
Site: | WM-00110 |
Issue date: | 12/31/2022 |
From: | Church G, Turvy K US Dept of Energy, Office of Environmental Management |
To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk |
Shared Package | |
ML23073A373 | List: |
References | |
DOE-EM/GJRAC2040-L | |
Download: ML23073A374 (1) | |
Similar Documents at WM-00110 | |
---|---|
Category:Report
MONTHYEARML24242A3212024-08-29029 August 2024
[Table view]DOE - Issue Briefing Memo, Disposition of Rail Materials from Fernald ML24183A3732024-05-31031 May 2024 DOE - Moab Umtra Project Final Remedial Action Plan and Site Design for Stabilization of Moab Title I Uranium Mill Tailings at the Crescent Junction, Utah, Disposal Site, Revision 3 ML24183A3782024-04-30030 April 2024 DOE - Addendum E, Final Remedial Action Plan DOE-EM/GJ1547 - Remedial Action Inspection Plan (Raip) ML24183A3762024-03-31031 March 2024 DOE - Addendum C, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Drawings ML24183A3792024-03-31031 March 2024 DOE - Addendum F, Final Remedial Action Plan DOE-EM/GJ1547 - Rock Source Data ML24183A3812024-03-31031 March 2024 DOE - Addendum H, Final Remedial Action Plan DOE-EM/GJ1547 - Field Demonstration Plan for Construction of the ET Cover Surface Admixture Layer ML24183A3742024-03-31031 March 2024 DOE - Addendum a, Final Remedial Action Plan DOE-EM/GJ1547 -DOE Responses to NRC Comments ML24183A3752024-03-31031 March 2024 DOE - Addendum B, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Specifications ML24183A3802024-03-31031 March 2024 DOE - Addendum G, Final Remedial Action Plan DOE-EM/GJ1547 - Evapotranspiration Cover System Post-Construction Monitoring Plan ML24011A2862023-12-31031 December 2023 Dwyer Engineering LLC, Crescent Junction Disposal Site, Evapotranspiration Cover System Design Report ML24183A3772023-12-31031 December 2023 DOE - Addendum D, Final Remedial Action Plan DOE-EM/GJ1547 - Crescent Junction Disposal Site Evapotranspiration Cover System Design Report ML23073A3762022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix B. Photographs ML23073A3742022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Moab Umtra Project Crescent Junction Disposal Cell Interim Completion Report Addendum - L, Revision 0 ML23073A3772022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L, Configuration Management Plan for Design and Construction Design Change Control Procedure Construction Interface Document ML23073A3752022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix A. Construction Verification Data ML22336A2122022-12-0202 December 2022 EPA-909-R-11-007, Closing Small Tribal Landfills and Open Dumps How to Design Environmentally Safe Covers Including Additional Design Guidance for Arid Regions ML22336A2092022-12-0202 December 2022 DOE Moab Umtra Responses to Nuclear Regulatory Commission (NRC) Staff Comments on Crescent Junction Disposal Site Alternative Final Cover System 90 Percent Design Report ML21298A0692021-11-0202 November 2021 Enclosure 1 NRC Comments on DOE 60 Percent Design Documents ML22336A2132020-09-0909 September 2020 Laboratory Report for Dwyer Engineering LLC, Crescent Junction Project ML22336A2112013-02-28028 February 2013 LMS/GRJ/S07112, Cover Performance Enhancement Tests at the Grand Junction, Colorado, Disposal Site: Construction Documentation, Material Testing, and Instrument Calibration ML22336A2152010-06-30030 June 2010 A7. Cap Rock and Armoring Cap Rock Durability and Gradation Test Results 2024-08-29 Category:Technical MONTHYEARML24183A3732024-05-31031 May 2024
[Table view]DOE - Moab Umtra Project Final Remedial Action Plan and Site Design for Stabilization of Moab Title I Uranium Mill Tailings at the Crescent Junction, Utah, Disposal Site, Revision 3 ML24183A3782024-04-30030 April 2024 DOE - Addendum E, Final Remedial Action Plan DOE-EM/GJ1547 - Remedial Action Inspection Plan (Raip) ML24183A3762024-03-31031 March 2024 DOE - Addendum C, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Drawings ML24183A3792024-03-31031 March 2024 DOE - Addendum F, Final Remedial Action Plan DOE-EM/GJ1547 - Rock Source Data ML24183A3812024-03-31031 March 2024 DOE - Addendum H, Final Remedial Action Plan DOE-EM/GJ1547 - Field Demonstration Plan for Construction of the ET Cover Surface Admixture Layer ML24183A3742024-03-31031 March 2024 DOE - Addendum a, Final Remedial Action Plan DOE-EM/GJ1547 -DOE Responses to NRC Comments ML24183A3752024-03-31031 March 2024 DOE - Addendum B, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Specifications ML24183A3802024-03-31031 March 2024 DOE - Addendum G, Final Remedial Action Plan DOE-EM/GJ1547 - Evapotranspiration Cover System Post-Construction Monitoring Plan ML24011A2862023-12-31031 December 2023 Dwyer Engineering LLC, Crescent Junction Disposal Site, Evapotranspiration Cover System Design Report ML24183A3772023-12-31031 December 2023 DOE - Addendum D, Final Remedial Action Plan DOE-EM/GJ1547 - Crescent Junction Disposal Site Evapotranspiration Cover System Design Report ML23073A3762022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix B. Photographs ML23073A3742022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Moab Umtra Project Crescent Junction Disposal Cell Interim Completion Report Addendum - L, Revision 0 ML23073A3772022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L, Configuration Management Plan for Design and Construction Design Change Control Procedure Construction Interface Document ML23073A3752022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix A. Construction Verification Data ML22336A2122022-12-0202 December 2022 EPA-909-R-11-007, Closing Small Tribal Landfills and Open Dumps How to Design Environmentally Safe Covers Including Additional Design Guidance for Arid Regions ML22336A2092022-12-0202 December 2022 DOE Moab Umtra Responses to Nuclear Regulatory Commission (NRC) Staff Comments on Crescent Junction Disposal Site Alternative Final Cover System 90 Percent Design Report ML21298A0692021-11-0202 November 2021 Enclosure 1 NRC Comments on DOE 60 Percent Design Documents ML22336A2132020-09-0909 September 2020 Laboratory Report for Dwyer Engineering LLC, Crescent Junction Project ML22336A2112013-02-28028 February 2013 LMS/GRJ/S07112, Cover Performance Enhancement Tests at the Grand Junction, Colorado, Disposal Site: Construction Documentation, Material Testing, and Instrument Calibration ML22336A2152010-06-30030 June 2010 A7. Cap Rock and Armoring Cap Rock Durability and Gradation Test Results 2024-05-31 |
Retrieved from "https://kanterella.com/w/index.php?title=ML23073A374&oldid=3709032"