ML23046A097
ML23046A097 | |
Person / Time | |
---|---|
Issue date: | 08/25/2023 |
From: | Office of Nuclear Reactor Regulation |
To: | NRC/OCIO |
Shared Package | |
ML23027A021 | List: |
References | |
OMB-3150-0151, NRC-2023-0048 | |
Download: ML23046A097 (1) | |
Text
TABLE 1 ANNUAL REPORTING BURDEN DNRL LIGHT WATER REACTORS & DANU NON-LIGHT WATER REACTORS (burden numbers combined below)
GENERAL PROVISIONS Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.7 (Respondent is same as in Subpart C below.) application for exemption 1 25 25 360 9000 $2,610,000 Regulatory Guide (RG) 1.206, "Applications for Nuclear Power conduct of pre-application activities 1 1 1 25,000 25000 $7,250,000 Plants" Subtotal: General Provisions 2 26 34000 $9,860,000 SUBPART A: EARLY SITE PERMITS (ESPs)
NRC expects 0 new ESP applications over the next 3 years. (0/3=0)
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.17(a)(1) site safety analysis report 0 0 0 6000 0 $0 52.17(b)(1) submitting information on physical 0 0 0 20 0 $0 characteristics of the proposed site that could pose a significant impediment to the development of emergency plans 52.17(b)(2)(i) and 52.17(b)(3) without ITAAC propose major features of the emergency 0 0 0 1000 0 $0 plans in the site SAR 52.17(b)(2)(i) and 52.17(b)(3) with ITAAC propose major features of the emergency 0 0 0 2667 0 $0 plans in the site SAR 52.17(b)(2)(ii) and 52.17(b)(3) propose complete and integrated 0 0 0 2000 0 $0 emergency plans in the site SAR 52.17(b)(4) include a description of contacts and 0 0 0 40 0 $0 arrangements made with Federal, State, and local governmental agencies with emergency planning responsibilities 52.29(a) requirements for a renewal application of 0 0 0 6000 0 $0 any ESP 52.35 requires the holder to notify the agency of 0 0 0 40 0 $0 the non-nuclear use 52.39(b) applicants for a CP, OL, or COL who have Burden covered under 10 CFR 52.79(b) filed an application referencing an ESP to update their emergency preparedness information provided under 52.17(b) 52.39(d) an applicant referencing an ESP may 0 0 0 120 0 $0 include in its application a request for a variance from one or more site characteristics, design parameters, or terms and conditions of the ESP, or from the site SAR Subtotal: Subpart A 0 0 0 $0
SUBPART B: STANDARD DESIGN CERTIFICATIONS (DCs)
NRC expects 1 new NLWR DC applications and 0 new NLWR or LWR DC renewal applications over the next 3 years. (1/3=0.33)
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.45 an application for a DC may be filed even if Burden covered under 10 CFR 52.46 and 52.47 an application for a CP or COL for such a facility has not been filed 52.47(a), except (a)(6) & (a)(27) requires that a DC application contain a 0.33 1 0.33 35,300 11,649 $3,378,210 Final Safety Analysis Report (FSAR) 52.47(a)(27) requires a DC application to contain a 0.33 1 0.33 45,400 14,982 $4,344,780 FSAR that describes the design-specific probabilistic risk assessment (PRA) and its results 52.47(b)(1) requires that a DC application contain 0.33 1 0.33 25,300 8,349 $2,421,210 proposed inspections, tests, analyses, and acceptance criteria (ITAAC) 52.47(c)(1) requires that an application for certification Burden covered under 10 CFR 52.47(a) and 52.47(b) of a nuclear power reactor design that is an evolutionary change from light-water reactor (LWA) designs of plants must provide an essentially complete NPP design except for site-specific elements.
52.47(c)(2) requires that an application for certification Burden covered under 10 CFR 52.47(a) and 52.47(b) of a nuclear power reactor design that differs significantly from the LWA designs described in paragraph (c)(1) or uses simplified, inherent, passive, or other innovative means to accomplish its safety functions must provide an essentially complete nuclear power reactor design except for site-specific elements and meet the requirements of 10 CFR 50.43(e).
52.51 requires that applicants for DC must submit Burden covered under 10 CFR 52.47(a) a design control document (DCD) prior to completing a proposed rule for certifying a standard design by rulemaking is essentially the same requirement of Section 52.47(a).
52.57(a) provides a procedure for application for 0 0 0 10,000 0 $0 renewal of a DC 52.63(b)(1) n/a Burden covered under 10 CFR 52.7 Subtotal: Subpart B 0.33 1 34,980 $10,144,200
[1]
Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
SUBPART C: COMBINED LICENSES (COLs)
NRC expects 1 new LWR COL application and 2 new NLWR COL applications over the next 3 years (3/3=1 responses/year) 0 new LWR or NLWR COLs referencing a DC application (0/3=0 responses/year) 1 LWR COLs under construction; 0 NLWR COLs under construction; 0 COLs decommissioning NRC expects to receive a total of 1 LWR and 0 NLWR All ITAAC Complete Notifications over the next 3 years (1/3=0.33)
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.79(a), except (a)(45) & (a)(46) addresses a COL application that does not 0.67 1 0.67 58,420 39,141 $11,351,006 reference any other type of Part 52 license, certification, or approval 52.79(a)(46) requires a COL application to contain a 1 1 1 54,000 54,000 $15,660,000 FSAR that describes the plant-specific probabilistic risk assessment or analysis (PRA) and its results 52.79(b) addresses a COL application that 0 0 0 102,368 0 $0 references an ESP 52.79(c) addresses a COL application that 0.33 1 0.33 46,460 15,332 $4,446,222 references a design approval 52.79(d) addresses a COL application that 0 0 0 31,460 0 $0 references a DC 52.79(e) addresses a COL application that 0 0 0 36,460 0 $0 references a manufactured reactor licensed under Subpart F of 10 CFR Part 52 52.79(b) & (d) addresses a COL application that 0 0 0 26,560 0 $0 references both an ESP and DC 52.80(a) - 40,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for applications which do not reference a DC requires that a COL application contain the 1 1 1 40,000 40,000 $11,600,000 application proposed inspections, tests, and analyses, including those applicable to emergency planning, that the licensee shall perform 52.80(a) - 10,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> for applications that do reference a certified requires that a COL application contain the 0 0 0 10,000 0 $0 design proposed inspections, tests, and analyses, including those applicable to emergency 52.80(d) l i applicants requires th t th li for powerh reactor ll f 1 1 1 300 300 $87,000 operating licenses under Part 52 to include in their applications information on the plan for implementing the requirements of 10 CFR 50.155(b), and the requirement and planned locations of the equipment on which the strategies and guidelines will rely.
52.93(a) allows applicants for a COL under this Burden covered under 10 CFR 52.7 subpart, or any amendment to a COL, to include in the application a request for an exemption from one or more of the Commissions regulations. Information submitted with an exemption request would be used to determine if the exemption is authorized by law, will not present an undue risk to public health and safety, and is consistent with the common defense and security, or if other special circumstances are present requiring consideration of the exemption request.
52.93(b) allows applicants for a COL referencing an Burden covered under 10 CFR 52.39 ESP to include in the application a request for a variance from one or more site characteristics, design parameters, or terms and conditions of the permit, or from the site SAR. The NRC would use the information in an applicants request for a variance to determine if the information that did not conform to the ESP was in conformance with the NRCs regulations.
52.93(c) allows applicants for a COL referencing a Burden covered under 10 CFR 52.171 nuclear power reactor manufactured under a ML to include in the application a request for a departure from one or more design characteristics, site parameters, terms and conditions, or approved design of the manufactured reactor. The NRC would use the information in an applicants request for a departure to determine if the information that did not conform to the ML or approved design of the manufactured reactor was in conformance with the NRCs regulations.
52.99(a) requires licensees to submit to the NRC, no 0.33 1 0.33 20 7 $1,914 later than 1 year after issuance of a COL, a detailed schedule for completing the inspections, tests, or analyses in the ITAAC and provide updates to the ITAAC schedule every 6 months thereafter 52.99(c)(1) requires that, after issuance of the COL, the 0.33 41 13.53 40 541 $156,948 licensee notify the NRC that the inspections, tests, or analyses in the ITAAC have been successfully completed and that the corresponding acceptance criteria have been met (ITAAC Closure Notification)
52.99(c)(2) requires that the licensee notify the NRC in 0.33 2 0.66 20 13 $3,828 a timely manner of new information that materially alters the basis for determining that either inspections, tests, or analyses were performed as required, or that acceptance criteria are met (ITAAC Post-closure Notifications) 52.99(c)(3) requires that, if the licensee has not 0 1 0 40 0 $0 provided, by the date 225 days before the scheduled date for initial loading of fuel, the notification required by paragraph (c)(1) of this section for all ITAAC, then the licensee must notify the NRC that the inspections, tests, or analyses for all uncompleted ITAAC will be successfully completed and all acceptance criteria will be met prior to operation (Uncompleted ITAAC Notifications) 52.99(c)(4) requires that the licensee to notify the NRC 0.33 1 0.33 8 3 $766 that all ITAAC are complete (All ITAAC Complete Notification) 52.99(d)(1) & 52.99(d)(2) These sections states that in the event that Burden covered under 10 CFR 52.39 (variances) and 52.7 (exemptions) an activity is subject to an ITAAC derived from a referenced ESP or standard DC and the licensee has not demonstrated that the ITAAC has been met, the licensee may take corrective actions to successfully complete that ITAAC, request a variance from the ESP ITAAC, or request an exemption from the standard DC ITAAC, as applicable. In the event that an activity is subject to an ITAAC not derived from a referenced ESP or standard DC and the licensee has not demonstrated that the ITAAC has been met, the licensee may take corrective actions to successfully complete that ITAAC or request a license amendment under
' 52.98(f). The information submitted under this section would be used by the NRC to determine if the applicant met the NRCs requirements related to the particular ITAAC that had not been successfully completed.
52.103(a) requires that the licensee shall notify the 0.33 1 0.33 10 3 $957 NRC of its scheduled date for initial loading of fuel no later than 270 days before the scheduled date and shall notify the NRC of updates to its schedule every 30 days thereafter
52.110(a) requirements for when a licensee has 0 0 0 20 0 $0 determined to permanently cease operations 52.110(d) requires that, before or within 2 years 0 0 0 3,000 0 $0 following permanent cessation of operations, the licensee submit a post shutdown decommissioning activities report 52.110(g) requirements following submittal of the 0 0 0 20 0 $0 post-shutdown decommissioning activities report 52.110(h)(3) requires that within 2 years following 0 0 0 20 0 $0 permanent cessation of operations, if not already submitted, the licensee shall submit a site-specific decommissioning cost estimate 52.110(h)(4) requirements for decommissioning activities 0 0 0 20 0 $0 Subtotal: Subpart C 1.33 19.18 149,340 $43,308,641
SUBPART E: STANDARD DESIGN APPROVALS NRC expects 0 new LWR and 1 new NLWR design approval applications over the next 3 years (1/3=0.33 responses per year)
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.137(a), except (a)(6) & (a)(25) requires that a design approval application 0.33 1 0.33 42,000 13,860 $4,019,400 contain a FSAR 52.137(a)(25) requires a design approval application to 0.33 1 0.33 54,000 17,820 $5,167,800 contain a FSAR that describes the design-specific PRA and its results Subtotal: Subpart E 0.33 0.66 31,680 $9,187,200 SUBPART F: MANUFACTURING LICENSES NRC expects 0 LWR and 1 new NLWR manufacturing license applications over the next 3 years (1/3=0.33 responses per year).
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually 52.157, except 52.157(f)(9) & (f)(31) requires that a ML application contain a 0.33 1 0.33 50,000 16,500 FSAR 52.157(f)(31) requires a ML application to contain a 0.33 1 0.33 54,000 17,820 $5,167,800 FSAR that describes the design-specific PRA and its results 52.158(a) require that a ML application contain the 0.33 1 0.33 30,000 9,900 $2,871,000 proposed inspections, tests and analyses that the licensee who will be operating the reactor shall perform, and the acceptance criteria 52.177 contains requirements for renewal of an 0 0 0 10,000 0 $0 application for a ML previously issued by the NRC Subtotal: Subpart F 0.33 1 44,220 $8,038,800 APPENDIX A: ABWR DESIGN CERTIFICATION RULE NRC expects 0 COL applicants referencing the ABWR Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix A NOT under construction over the next 3 years.
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually X.A.2 requires an applicant or licensee who Burden covered under 10 CFR 52.99(c)(1) references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.B.1 requires applicants or licensees who 0 0 0 0 0 $0 reference the DC to submit reports on plant-specific departures from the DCD X.B.2 requires applicants or licensees who 0 0 0 0 0 $0 reference this DC to submit updates to its DCD X.B.3.c states that after the Commission has Burden covered under X.B.1 and X.B.2 authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Appendix A Total 0 0 0 $0 APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the System 80+ Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix B under construction over the next 3 years Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually X.A.2 requires an applicant or licensee who Burden covered under 10 CFR 52.99(c)(1) references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.B.1 requires applicants or licensees who 0 0 0 8 0 $0 reference the DC to submit reports on plant-specific departures from the DCD X.B.2 requires applicants or licensees who 0 0 0 500 0 $0 reference this DC to submit updates to its DCD X.B.3.c states that after the Commission has Burden covered under X.B.1 and X.B.2 authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Appendix B Total 0 0 0 $0 APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 0 applicants to reference the AP600 Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix C under construction over the next 3 years Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually X.A.2 requires an applicant or licensee who Burden covered under 10 CFR 52.99(c)(1) references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.B.1 requires applicants or licensees who 0 0 0 8 0 $0 reference the DC to submit reports on plant-specific departures from the DCD X.B.2 requires applicants or licensees who 0 0 0 500 0 $0 reference this DC to submit updates to its DCD X.B.3.c states that after the Commission has Burden covered under X.B.1 and X.B.2 authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Appendix C Total 0 0 0 $0 APPENDIX D: AP1000 DESIGN CERTIFICATION RULE
NRC expects 0 COL applicants to reference the AP1000 Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix D under construction over the next 3 years.
NRC expects 0 COL licensees referencing Appendix D NOT under construction over the next 3 years.
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually X.A.2 requires an applicant or licensee who Burden covered under 10 CFR 52.99(c)(1) references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.B.1 requires applicants or licensees who 0 0 0 8 0 $0 reference the DC to submit reports on plant-specific departures from the DCD X.B.2 requires applicants or licensees who 0 0 0 500 0 $0 reference this DC to submit updates to its DCD X.B.3.c states that after the Commission has Burden covered under X.B.1 and X.B.2 authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Appendix D Total 0 0 0 $0 APPENDIX E: ESBWR DESIGN CERTIFICATION RULE NRC expects 0 COL applicants to reference the ESBWR Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix E NOT under construction over the next 3 years.
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually IV.A.2.a, c, h Section IV.A.2.a requires a plant-specific Burden covered in 10 CFR 52.79 DCD as part of the COL application. This section partially fulfills the requirements for contents of applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD.
Section IV.A.2.c requires plant-specific technical specifications (10 CFR 50.36 and 50.36a) as part of the COL application.
This information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79).Section IV.A.2.h requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires reports on departures from and Burden included in X.B below updates to the DCD, under Section X.B of Appendix G, as part of the COL application. This section ensures that the IV.A.2.b COL application is up-to-date.
requires applicants or licensees who X.B.1 reference the DC to submit reports on plant- 0 0 0 0 0 $0 specific departures from the DCD requires applicants or licensees who X.B.2 reference this DC to submit updates to its 0 0 0 0 0 $0 DCD requires submittal of reports and updates to Burden covered in 10 CFR 52.79 the generic DCD with the initial COL application. This requirement ensures that X.B.3.a the initial application is up-to-date and partially fulfills the requirements contents of applications in 10 CFR 52.79.
requires that during the period of review of Burden covered in X.B.1, X.B.2 the application and construction of a facility that references this design certification, summary reports on changes to the design must be submitted semi-annually. These X.B.3.b reports are needed to provide timely notification of design changes during the critical period of application review and facility construction.
states that after the Commission has Burden in 10 CFR 50.59(d) + 10 CFR 50.71(e) authorized operation of the nuclear plant, X.B.3.c the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Appendix E Total 0 0 0 $0 Subtotal: Appendices A through E 0 0 0 $0
[1]
Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
APPENDIX F: DESIGN CERTIFICATION FOR THE APR1400 DESIGN NRC expects 0 combined license applicants to use Appendix F over the next 3 years.
No. of Responses / Total No. of Burden per Total Annual Section Description of requirement Cost @ $290/Hr Respondents Respondent Responses Response Burden (Hrs) requires a plant-specific DCD as part of the COL application. This section partially fulfills the requirements for contents of IV.A.2.a ) (COL applicant) Burden covered under 10 CFR 52.79 applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD.
requires reports on departures from and updates to the DCD, under Section X.B of IV.A.2.b (COL applicant) Appendix G, as part of the COL application. Burden included in X.B below This section ensures that the COL application is up-to-date requires plant-specific technical specifications (10 CFR 50.36 and 50.36a) as part of the COL application. This IV.A.2.c (COL applicant) Burden covered under 10 CFR 52.79 information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79).
requires information demonstrating compliance with site parameters and IV.A.2.d (COL applicant) interface requirements as part of the COL Burden covered under 10 CFR 52.79 application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires the COL applicant to address COL IV.A.2.e (COL applicant) items in the generic DCD as part of the Burden covered under 10 CFR 52.79 COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR 52.47(a), that is not within the scope of this IV.A.2.f (COL applicant) design certification, as part of the COL Burden covered under 10 CFR 52.79 application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR 52.47(a), that is not within the scope of this IV.A.2.g (COL applicant) design certification, as part of the COL Burden covered under 10 CFR 52.79 application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR 52.47(a), that is not within the scope of this IV.A.2.h (COL applicant) design certification, as part of the COL Burden covered under 10 CFR 52.79 application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires the COL applicant to include, in the plant-specific DCD, the proprietary and safeguards information referenced in the generic DCD to ensure that the applicant IV.A.3 (COL applicant) Burden covered under 10 CFR 52.79 has actual notice of these requirements.
This section fulfills part of the requirements for contents of applications for a COL (10 CFR 52.79).
requires COL applicants or licensees who reference this design certification to submit X.B.1 (COL applicant) reports on departures from the plant- 0 1 0 8 0 $0 specific DCD. This section is similar to the requirements in 10 CFR 50.59(d)(2).
requires COL applicants or licensees who reference this design certification to submit updates to its plant-specific DCD that reflect X.B.2 (COL applicant) generic changes to and plant specific 0 1 0 500 0 $0 departures from the generic DCD. This section is similar to the requirements in 10 CFR 50.71(e).
requires submittal of reports and updates to the generic DCD with the initial COL application. This requirement ensures that X.B.3.a Burden covered under 10 CFR 52.79 the initial application is up-to-date and partially fulfills the requirements contents of applications in 10 CFR 52.79.
requires that during the period of review of the application and construction of a facility that references this design certification, summary reports on changes to the design X.B.3.b must be submitted semi-annually. These Burden covered under X.B.1, X.B.2 reports are needed to provide timely notification of design changes during the critical period of application review and facility construction.
states that after the Commission has authorized operation of the nuclear plant, X.B.3.c the frequency for submitting reports and (Burden covered under 10 CFR 50.59(d) + 10 CFR 50.71(e))
updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively.
Total 0 0 0 0 APPENDIX G: DESIGN CERTIFICATION FOR THE NUSCALE DESIGN NRC expects 0 combined license applicants to use Appendix G over the next 3 years.
Description of requirement No. of Responses / Total No. of Burden per Total Annual Cost @ $290/Hr Respondents Respondent Responses Response Burden (Hrs) requires a plant-specific DCD as part of the COL application. This section partially fulfills the requirements for contents of IV.A.2.a applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD. (Burden covered under 10 CFR 52.79) (COL applicant) requires reports on departures from and (Burden included in X.B below) (COL applicant) updates to the DCD, under Section X.B of Appendix G, as part of the COL application. This section ensures that the IV.A.2.b COL application is up-to-date.
requires plant-specific technical Burden covered under 10 CFR 52.79) (COL applicant) specifications (10 CFR 50.36 and 50.36a) as part of the COL application. This IV.A.2.c information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79).
requires information demonstrating (Burden covered under 10 CFR 52.79) (COL applicant) compliance with site parameters and interface requirements as part of the COL application. This section fulfills part of the IV.A.2.d requirements for a COL (10 CFR 52.79).
requires the COL applicant to address COL (Burden covered under 10 CFR 52.79) (COL applicant) items in the generic DCD as part of the IV.A.2.e COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR (Burden covered under 10 CFR 52.79) (COL applicant) 52.47(a), that is not within the scope of this IV.A.2.f design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR (Burden covered under 10 CFR 52.79) (COL applicant) 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the IV.A.2.g requirements for a COL (10 CFR 52.79).
requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the (Burden covered under 10 CFR 52.79) (COL applicant) requirements for a COL (10 CFR 52.79). n/a IV.A.2.h requires the COL applicant to include, in the (Burden covered under 10 CFR 52.79) (COL applicant) plant-specific DCD, the proprietary and safeguards information referenced in the generic DCD to ensure that the applicant has actual notice of these requirements.
This section fulfills part of the requirements for contents of applications for a COL (10 CFR 52.79).
IV.A.3 requires the COL applicant to include, as (Burden covered under 10 CFR 52.79) (COL applicant) part of the COL application, information demonstrating that an entity other than NuScale Power is qualified to supply the NuScale design, unless NuScale Power supplies the design for the COL applicants use.
IV.A.4 requires COL applicants or licensees who reference this design certification to submit X.B.1 (COL applicant) reports on departures from the plant- 0 0 0 0 0 $0 specific DCD. This section is similar to the requirements in 10 CFR 50.59(d)(2).
requires COL applicants or licensees who reference this design certification to submit updates to its plant-specific DCD that reflect X.B.2 (COL applicant) generic changes to and plant specific 0 0 0 0 0 $0 departures from the generic DCD. This section is similar to the requirements in 10 CFR 50.71(e).
requires submittal of reports and updates to (Burden covered under 10 CFR 52.79) the generic DCD with the initial COL application. This requirement ensures that the initial application is up-to-date and partially fulfills the requirements contents of X.B.3.a applications in 10 CFR 52.79.
requires that during the period of review of (Burden covered under X.B.1, X.B.2) the application and construction of a facility that references this design certification, summary reports on changes to the design must be submitted semi-annually. These reports are needed to provide timely notification of design changes during the critical period of application review and facility construction.
X.B.3.b states that after the Commission has (Burden covered under 10 CFR 50.59(d) + 10 CFR 50.71(e))
authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required X.B.3.c by 10 CFR 50.59 and 50.71, respectively.
Total 0 0 0 0 0 $0
- The respondents in X.B.1 and X.B.2 are the same entity and should not be double counted in the total.
APPENDIX N: STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS:
COMBINED LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF IDENTICAL DESIGN AT MULTIPLE SITES NRC expects 0 combined license applicants to use Appendix N over the next 3 years.
Section Description of requirement Number of Responses per Total Responses Burden per Total Annual Estimate Annual Respondents Respondent Annually Response Burden Hours Cost @ $290/hr Annually Annually Paragraph 2 requires that each COL application 0 0 0 10 0 $0 submitted pursuant to this appendix be submitted as specified in 52.75 and 10 CFR 2.101 and that each application state that the applicant wishes to have the application considered under 10 CFR Part 52, Appendix N Paragraph 3 requirements for what each application 0 0 0 40 0 $0 should include
Paragraph 4 This paragraph requires that each COL Burden covered under 10 CFR 52.80© application submitted pursuant to this appendix contain an ER as required by 52.80(b), and which complies with the applicable provisions of 10 CFR Part 51 and states that the application may incorporate by reference a single ER on the environmental impacts of the common design.
Subtotal: Appendix N 0 0 0 $0 Total Part 52 Reporting Burden 4 48 294,220 $80,538,841 TABLE 3 ANNUAL REPORTING BURDEN UNDER 10 CFR 52.99(a) 10 CFR PART 52 NOTE: Bell Bend, Callaway, Calvert Cliffs, Comanche Peak, Grand Gulf, Nine Mile Point, River Bend, Lee, Shearon Harris, Bellefonte, and Victoria County COL applications are suspended or withdrawn; and therefore have been removed from the table Summer Levy and South Texas Project COLs were terminated at the request of the licensees; and therefore have been removed from the table Applicant/Licensee Name Reporting Section 2024 2025 2026 NuScale DC application Subpart B A (Feb 2023)
NuScale SDA application (30 month review started March 2023) Subpart B N N N CFPP/UAMPS COL application
- Subpart C N N N AP1000 DC renewal application
- Subpart B N N Vogtle Unit 3 COL Subpart C & Appendix D Z Vogtle Unit 4 COL Subpart C & Appendix D Z COL A (non-LWR reactor)* Subpart C N N N COL B (non-LWR reactor)* Subpart C N ML (non-LWR reactor)* Subpart F N N SDA (non-LWR reactor)* Subpart E N N DC (non-LWR reactor)* Subpart B N N Notes:
- = new application submitted during this reporting period N = license/permit/design certification not yet issued; A = license/permit/design certification issued; Z = initial fuel load Continue ITAAC complete notifications 12 per year until notification of all ITAAC met For reporting purposes it is assume that each unit will submit a separate report
TABLE 2 ANNUAL RECORDKEEPING BURDEN 10 CFR PART 52 NRC expects 5 new NLWR applications (includes 1 DC, 2 COLs, 1 ML, a 1 SDA) and 1 new LWR COL application to be submitted over the next 3 years NRC expects 0 new DC renewal applications to be submitted over the next 3 years.
NRC expects there to be 2 COL licensees who reference a standard DC by the end of January 2027 NRC expects there to be 1 LWR COL licensee who references a standard design approval by the end of January 2027 Section Description of requirement Number of Record Burden Hrs. per Record keeper Total Annual Burden Estimate Annual Cost @
keepers Hours $290/hr 52.47 requirements for the contents 2 500 1,000 $290,000 of applications for the certification of a standard plant design Regulatory Guide (RG) 1.206, provides guidance on the 2 5000 10,000 $2,900,000 "Applications for Nuclear Power format and content of Plants" applications and on the conduct of pre-application activities submitted under 10 CFR Part 52.
52.57(a)-renewals provides a procedure for 0 500 0 $0 application for renewal of a DC
- requires updating any of the information that was submitted under Sections 52.46 and 52.47 52.63(b)(2) requires that licensees who 2 1,500 3,000 $870,000 reference a standard DC must maintain records of all changes to the facility 52.63(c) & 52.73(b) requires applicants for CPs, 1 500 500 $145,000 OLs, or COLs who reference standard DCs, SDAs, or MLs to acquire or complete, and make available for audit, detailed design-related information normally contained in procurement, construction, and installation specifications Subtotal 7 14,500 $4,205,000 Recordkeepers under 52.63(b)(2) and 52.63(b) are noted as the same record keeper and are only counted once.
APPENDIX A: ABWR DESIGN CERTIFICATION RULE NRC expects 0 applicant to maintain records for the ABWR Design Certification Rule over the next 3 years.
Section Description of requirement Number of Record Burden Hrs. per Record keeper Total Annual Burden Estimate Annual Cost @
keepers Hours $290/hr X.A.1 requires that the applicant for 0 34 0 $0 the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced X.A.2 requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.A.3 requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license.
X.A.4.a Requires the applicant for the 0 1 0 $0 amendment to the U.S. ABWR design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal)
X.A.4.a Requires the applicant for the 0 1 0 $0 amendment to the ABWR design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal)
Appendix A Total 0 0 $0
[1]
Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE NRC expects 0 applicant to maintain records for the System 80+ Design Certification Rule over the next 3 years. (This certified design has expired)
Section Description of requirement Number of Record Burden Hrs. per Record keeper Total Annual Burden Estimate Annual Cost @
keepers Hours $290/hr X.A.1 requires that the applicant for 0 0 0 $0 the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced X.A.2 requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.A.3 requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license.
Appendix B Total 0 0 $0 APPENDIX C: AP600 DESIGN CERTIFICATION RULE NRC expects 0 applicant to maintain records for the AP600 Design Certification Rule over the next 3 years. (This certified design has expired)
Section Number of Record Burden Hrs. per Record keeper Total Annual Burden Estimate Annual Cost @
keepers Hours $290/hr X.A.1 requires that the applicant for 0 0 0 $0 the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced X.A.2 requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.A.3 requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license.
Appendix C Total 0 0 $0 APPENDIX D: AP1000 DESIGN CERTIFICATION RULE NRC expects 1 applicant for two plants to maintain records for the AP1000 Design Certification Rule over the next 3 years Section Description of requirement Number of Record Burden Hrs. per Record keeper Total Annual Burden Estimate Annual Cost @
keepers Hours $290/hr X.A.1 requires that the applicant for 1 34 34 $9,860 the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced X.A.2 requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.
X.A.3 requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license.
Appendix D Total 1 34 $9,860 APPENDIX E: ESBWR DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the ESBWR Design Certification Rule over the next 3 years.
Description of requirement Total Annual Burden Section No. of Recordkeepers Burden Hours per Recordkeeper Cost @ $290/Hr Hours
requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards X.A.1 information referenced in the 1 34 34 $9,860 generic DCD for the period that the appendix may be referenced requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain X.A.2 the plant-specific DCD throughout the period of the application and for the term of the license.
requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its X.A.3 changes to this design certification throughout the period of the application and the term of the license.
Appendix E Total 1 34 $9,860 APPENDIX F: APR1400 DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the APR1400 Design Certification Rule over the next 3 years Description of requirement Total Annual Burden Section No. of Recordkeepers Burden Hours per Recordkeeper Cost @ $290/Hr Hours X.A.1(similar burden to 10 CFR requires that the applicant for this 1 34 34 $9,860 50.71(e)) (DCD applicant) appendix shall maintain a copy of the generic DCD that includes all generic changes that are made to Tier 1 and Tier 2, and the generic TS and other operational requirements.
requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of X.A.2 the license.
requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and X.A.3 the term of the license.
X.A.4.a (DCD applicant) requires that the applicant for the 1 3 3 $870 APR1400 design shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal)
X.A.4.b (COL applicant) 1 3 3 $870 requires that the applicant or licensee who references this appendix shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) throughout the pendency of the application and for the term of the license (including any periods Appendix F Total 1 40 $11,600 APPENDIX G: NUSCALE DESIGN CERTIFICATION RULE NRC expects 1 applicant to maintain records for the Nuscale Design Certification Rule over the next 3 years.
Description of requirement Total Annual Burden Section No. of Recordkeepers Burden Hours per Recordkeeper Cost @ $290/Hr Hours X.A.1(similar burden to 1 103 103.0 $29,870 10 CFR 50.71(e)) (DCD applicant) requires an applicant or Burden covered under 10 CFR 50.71(e) licensee who references this design certification to maintain X.A.2 the plant-specific DCD throughout the period of the application and for the term of the license.
requires an applicant or Burden covered under 10 CFR 50.59(d) licensee who references this design certification to prepare and maintain the bases for its X.A.3 changes to this design certification throughout the period of the application and the term of the license.
requires the applicant for this design certification to maintain a copy of the aircraft impact assessment (AIA) performed X.A.4.a (DCD applicant) to comply with the 0 3 0 $0 requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal).
requires COL applicants or licensees who references this design certification to maintain a copy of the AIA performed to comply with the requirements X.A.4.b (COL applicant) of 10 CFR 50.150(a) 0 3 0 $0 throughout the pendency of the application and for the term of the license (including any period of renewal).
Appendix G Total 1 109 103 $29,870 Total Part 52 Recordkeeping 11.00 14,711 $4,224,720 Burden Total Storage Cost $1,706.48 TABLE 1 Applicant/Licensee Name Recordkeeping Section From 2020 not in 2023 NuScale DC application 52.47 Oklo COL (non-LWR reactor)
- Subpart C NuScale SDA application 52.47 Summer Unit 2 COL Subpart C & Appendix D UAMPS COL application* 52.47 and 52.63(c) & 52.73(b) Summer Unit 3 COL Subpart C & Appendix D AP1000 DC renewal application* 52.47 ABWR DC Renewal Subpart B Vogtle Unit 3 COL 52.63(b)(2) Bellefonte 1 COL Subpart C Vogtle Unit 4 COL 52.63(b)(2)
COL A (non-LWR reactor)* 52.79 COL B (non-LWR reactor)* 52.73(b)
ML (non-LWR reactor)* 52.157 SDA (non-LWR reactor)* 52.137 DC (non-LWR reactor)* 52.47 Notes:
For reporting purposes it is assumed that each unit will submit a separate report.
Burden Totals Part 52 Renewal Hours Responses Reporting 294,220 47.8 Recordkeeping 14,711 11.0 Total 308,931 58.8 Total cost
@$290/hr $ 89,590,031 Additional costs (item #14) $ 1,706