ML23040A451
ML23040A451 | |
Person / Time | |
---|---|
Site: | 07100935 |
Issue date: | 02/14/2023 |
From: | Rivera-Verona A NRC/NMSS/DFM/IOB |
To: | EnergySolutions |
Shared Package | |
ML23040A449 | List: |
References | |
Download: ML23040A451 (1) | |
Text
1. APPROVAL NUMBER 0935 NRC FORM 311 U.S. NUCLEAR REGULATORY COMMISSION (10-2019)
QUALITY ASSURANCE PROGRAM APPROVAL FOR RADIOACTIVE MATERIAL PACKAGES REVISION NUMBER 11 Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 4 by the organization named in Item 2, the Quality Assurance Program identified in Item 4 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.
- 2. NAME EnergySolutions STREET ADDRESS 299 South Main Street, Suite 1700 CITY Salt Lake City STATE UT ZIP CODE 84111
- 3. DOCKET NUMBER 71-0935
- 4. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S) 5/21/07; 10/15/07; 7/15/08; 12/8/12; 7/15/13; 3/3/15; 6/1/16; 2/15/17; 3/26/19; 6/4/19; and 11/2/22
- 5. CONDITIONS
- 1. Activities conducted regarding transportation packagings are to be executed under applicable criteria of 10 CFR Part 71, Subpart H. Authorized activities include: design, procurement, fabrication, assembly, testing, modification, maintenance, repair, and use of transportation packagings.
- 2. Records shall be maintained in accordance with the provisions of 10 CFR 71. Specifically:
- a. Records of each shipment of licensed material shall be maintained for 3 years after that shipment
[10 CFR 71.91(a)].
- b. Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71.91(d)]
- c. Records describing activities affecting packaging quality shall be maintained for 3 years after this Quality Assurance Program Approval is terminated [10 CFR 71.135].
- 3. Planned and periodic audits of all aspects of the Quality Assurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct responsibility in the areas being audited, in accordance with 10 CFR 71.137.
EnergySolutions Part 71 Subpart H, Quality Assurance Program approval organization and facilities (as applicable) located in Salt Lake City, Utah; Clive, Utah; Oak Ridge, Tennessee; Bear Creek, Tennessee; Erwin, Tennessee; Memphis, Tennessee; Clinton, Tennessee; Barnwell, South Carolina; and Charlotte, North Carolina.
FOR THE U.S. NUCLEAR REGULATORY COMMISSION SIGNATURE DATE AIDA RIVERA-VARONA, CHIEF INSPECTION AND OVERSIGHT BRANCH DIVISION OF FUEL MANAGEMENT OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS NRC FORM 311 (10-2019)
February 14, 2023 Signed by Rivera-Varona, Aida on 02/14/23