ML23033A080
ML23033A080 | |
Person / Time | |
---|---|
Site: | 07109380 |
Issue date: | 02/08/2023 |
From: | Pierre Saverot Storage and Transportation Licensing Branch |
To: | Jacob Zimmerman Division of Fuel Management |
References | |
EPID L-2023-LLA-0004 | |
Download: ML23033A080 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 MEMORANDUM TO: Jake Zimmerman, Deputy Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Pierre Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
SUMMARY
OF JANUARY 19, 2023, MEETING WITH WESTINGHOUSE ELECTRIC COMPANY LLC
Background
On January 19, 2023, an Observation Public Meeting was held by teleconference between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives from Westinghouse Electric Company LLC (Westinghouse) to discuss a pending amendment request for the Model No. Traveller STD and XL packages. This pre-application meeting was noticed on January 10, 2023 Agencywide Documents Access and Management System (ADAMS)
Accession No. ML23010A156).
The meeting attendance list is provided as Enclosure No. 1.
Discussion Westinghouse requested this meeting to advise staff of an amendment request for its Model No.
Traveller STD and XL packages (Docket No. 71-9380) that would be submitted as early as Friday January 20 or no later than Monday January 23, 2023.
The amendment request will include revised licensing drawings to correct typographical error in the current drawings and safety-related part lists related to the top axial restraint component materials. Westinghouse self-identified this error and clarified, in response to staffs questions, that the components, and thus the package as a whole, were designed and fabricated to the correct material requirements, as previously reviewed and approved by the NRC staff.
The applicant explained that the submittal of a revised application (SAR Rev. 3) along with revised drawings did not introduce any change in the actual design, fabrication, or safety performance of the package.
CONTACT: Pierre Saverot, NMSS/DFM 301-415-7505February 8, 2023 Signed by Saverot, Pierre on 02/08/23
J. Zimmerman 2
The applicant presented proprietary pictures, as well as the drawings of the internals of the package, to show where the materials, i.e., rubber pad, stainless steel, and T6 Aluminum were located and where they were incorrectly identified on the Bill of Material.
To meet a first of a kind accident tolerant fuel, high enrichment lead test assembly delivery from the Westinghouse UK fuel fabrication facility to a U.S. reactor in July 2023, Westinghouse requested an expedited review by the NRC staff to allow for subsequent expedited Competent Authority (UK, Netherlands, Canada) revalidations.
The NRC staff assured Westinghouse that this amendment request will receive the highest priority. No regulatory commitments were made during this meeting.
Docket No. 71-9380 EPID L-2023-LLA-0004
Enclosure:
- 1. Meeting Attendees Meeting Between Westinghouse Electric Company LLC and the U. S. Nuclear Regulatory Commission January 19, 2023 Meeting Attendees
U. S. Nuclear Regulatory Commission
Pierre Saverot Jake Zimmerman Yoira Diaz-Sanabria Dave McIntyre
Tanya Sloma-DeLosier Wes Stilwell Brian Hempy
Enclosure
Memo ML23033A080 OFFICE NMSS/DFM/STLB NSIR/DPR NMSS/DFM/STLB NMSS/DFM/STLB NAME PSaverot PS JGoodridge JG YDiaz-SanabriaYD PSaverot PS DATE Feb 2, 2023 Feb 2, 2023 Feb 8, 2023 Feb 8, 2023