ML23031A338

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Additional Protocol Report - 2022
ML23031A338
Person / Time
Site: Hermes
Issue date: 01/31/2023
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23034A058 List:
References
KP-DOC-2301-001
Download: ML23031A338 (1)


Text

,*-~~J), Kairos Power KP-DOC-2301-001 January 31, 2023 15 CFR 783 US Department of Commerce Treaty Compliance Division 1401 Constitution Avenue, NW Room 4515 Washington, D.C. 20230 ATTN : AP Reports

Subject:

Kairos Power LLC Additional Protocol Report - 2022 This letter is to inform the U.S. Department of Commerce of activities subject to the Additional Protocol to the U.S.-IAEA Safeguards Agreement in accordance with 15 CFR 783 and 10 CFR 75.

Enclosure 1 provides form AP-1, AP-2, and the associated AP-3 forms. Note that the activities on Form AP-3 for Kairos Power's Advanced Reactor Demonstration Project (ARDP) award are being conservatively reported in this period although a contract has not been finalized with the Department of Energy for this award. Additionally, there are two activities that were identified during this reporting year which may have been potentially reportable in the 2020 reporting year, and one activity that may have been potentially reportable in the 2019 reporting year. One of the 2020 initiated activities and the 2019 initiated activity are ongoing and are identified as a "New activity" in Section 3.4 of the associated AP-3 form . The other 202 initiated activity concluded in 2022 and is identified as a "Ceased activity" in Section 3.4 of the associated AP-3 form. Kairos Power requests this information be withheld from public disclosure consistent with Section 231 of the U.S. Additional Protocol Implementation Act.

Contact information is provided on form AP-2 for both Kairos Power California and New Mexico locations. Please note that Kairos Power does not have 24/7 staffing at either location . The Access Point of Contact (A-POC) and Alternate A-POC can be reached during regular business hours.

~c:1;~~

St-. DINc)o r.,, l1c~rS* ~ -~

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

Form AP-1, AP-2, and Associated AP-3 Forms xc (w/enclosure):

US Nuclear Regulatory Commission, NMSS ATTN: Document Control Desk Kairos Power LLC www.kairospower.com 5201 Hawki ng Dr SE, Unit A 2115 Rexford Rd, Suite 325 707 W Tower Ave, Suite A Albuquerque, NM 87106 Charlotte, NC 28211 Alameda, CA 94501