ML23006A226

From kanterella
Jump to navigation Jump to search
200700062 - Quarterly October - December 2022 Report on the Status of Public Petitions Submitted Under Title 10 of the Code of Federal Regulations, Section 2.206
ML23006A226
Person / Time
Issue date: 01/20/2023
From: Jamie Heisserer
Plant Licensing Branch II
To: Mark King
Office of Nuclear Reactor Regulation
Buckberg P
References
200700062, CAC TM2058
Download: ML23006A226 (1)


Text

January 20, 2023 MEMORANDUM TO: Michael F. King, Deputy Director Reactor Safety Programs and Mission Support Office of Nuclear Reactor Regulation Digitally signed by Jamie M.

FROM: Jamie M. Heisserer, Deputy Director Jamie M. Heisserer Date: 2023.01.20 14:46:50 -05'00' Heisserer Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

200700062 - QUARTERLY OCTOBER DECEMBER 2022 REPORT ON THE STATUS OF PUBLIC PETITIONS SUBMITTED UNDER TITLE 10 OF THE CODE OF FEDERAL REGULATIONS, SECTION 2.206 (CAC NO. TM3058)

This memorandum transmits the quarterly status report of petitions being evaluated under Title 10 of the Code of Federal Regulations (10 CFR), Section 2.206, Requests for action under this subpart. This report covers open and closed petitions from October 1 through December 31, 2022, including their age statistics.

Enclosure:

Quarterly 10 CFR 2.206 Status Report October - December 2022 cc: SECY EDO OGC OCA OPA OCFO CONTACT: Perry Buckberg, NRR/DORL 301-415-1383

Quarterly Status Report of Public Petitions Submitted Under Title 10 of the Code of Federal Regulations (10 CFR), Section 2.206 October - December 2022 For each open or closed petition listed below, the individual status page summarizes the issues raised by the petitioner, the background, and the next steps.

When a petition is received, the submittal is evaluated against the screening criteria in Management Directive (MD) 8.11, Review Process for 10 CFR 2.206 Petitions, to determine if consideration by a Petition Review Board (PRB) is warranted or if the submittal will be dispositioned outside of the 10 CFR 2.206 process. If a submittal is currently being screened, it will not be included in this report. If a submittal has been screened and dispositioned outside of the 10 CFR 2.206 process, the submitter will be notified, and the submission will not be included in this report.

If PRB consideration is warranted, the petition will be referred to as an open petition under consideration in this report. If a PRB makes its final determination to not accept a petition for further review, the submitter will be notified, and the petition will be listed as a closed petition.

If a PRB accepts a petition for further review under 10 CFR 2.206, the petition will continue to be listed as an open petition under consideration until the U.S. Nuclear Regulatory Commission (NRC or the Commission) staff formally grants or denies the requested actions in a Directors Decision (DD). After issuing a DD, the petition will be listed as a closed petition.

Licensee/Facility Petitioner/Ticket No. Page OPEN PETITIONS UNDER CONSIDERATION Tetra Tech EC, Inc. David Anton 2 OEDO-17-00454 NextEra Energy/Seabrook Station C-10 Research & Education 4 Foundation OEDO-22-00419 Enclosure

OPEN PETITION UNDER CONSIDERATION OEDO-17-00454 (Petition Age: 66 months)

Facility: Tetra Tech EC, Inc.

Licensee Type: Materials Petitioner(s): David Anton Date of Petition: June 29, 2017 DD to be Issued by: Office of Nuclear Material Safety and Safeguards Acknowledgment Letter Issued: Not Applicable Closure Letter Issued: Not Applicable Last Contact with Petitioner: December 2, 2022 Petition Manager: James Smith Case Attorney: Lorraine Baer Issues/Actions Requested:

The petitioner requested that the NRC revoke the materials license for Tetra Tech EC, Inc.

(Tetra Tech), due to concerns about its role in the cleanup of Hunters Point Naval Shipyard (HPNS) in San Francisco, California, including remediation of radiological contamination. The submittal was lengthy with multiple attachments and included requests and concerns outside of the scope of 10 CFR 2.206.

Background:

On June 29, 2017, the petitioner filed a petition for enforcement action under 10 CFR 2.206 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18178A067).

On July 20, July 22, and August 1, 2017, the petition manager and petitioner discussed timing of a public meeting.

On October 19, 2017, the PRB met and decided to hold the petition in abeyance because the issues raised are the subject of ongoing reviews separate from the 10 CFR 2.206 process.

On December 6, 2017, the petition manager informed the petitioner that the processing of the petition was taking longer than the usual amount of time due to the need to obtain results from ongoing reviews outside the 10 CFR 2.206 process.

On February 13, 2018, the petitioner supplemented the petition with information pertaining to other HPNS site areas that may have included work done by Tetra Tech at Parcels C and E at HPNS (ML18212A267).

On June 18, 2018, the petition manager discussed with the petitioner the petition status and the next possible opportunity to address the PRB.

On August 15, 2018, the PRB met to discuss whether the petition meets the MD 8.11, Review Process for 10 CFR 2.206 Petitions criteria for acceptance.

On September 13, 2018, the petitioner and the petition manager discussed logistics of a tentative meeting.

On October 17, 2018, the petitioner addressed the PRB in a public meeting. The petitioner did not submit additional information during the meeting, but the transcript is considered a supplement to the petition (ML18299A174).

On October 29, 2018, the PRB met to discuss the information provided by the petitioner during the October 17, 2018, public meeting.

As a result of several internal deliberations, the PRBs initial determination was to reject the 10 CFR 2.206 petition.

On February 22, 2019, the petition manager informed the petitioner via telephone that the PRBs initial determination was to reject the petition (ML19057A539). The petitioner requested a second opportunity to address the PRB.

On June 25, 2019, the petitioner addressed the PRB in a second public meeting. The transcript is considered a supplement to the petition (ML19196A076). The petitioner also provided supplemental information after the meeting.

On August 9, 2019, the licensee provided a response to the PRB regarding statements made by the petitioner during the June 25, 2019, public meeting and the petitioners supplement submitted after the meeting (ML19226A211).

On September 12, 2019, the PRB met to discuss the final recommendation.

On December 19, 2019, a letter was issued by the NRC stating that the petition will be held in abeyance and will be reassessed after the legal resolution of the Department of Justice civil complaint against Tetra Tech (ML19309F257).

On April 24, 2020, August 24, 2020, and December 21, 2020, the petition manager informed the petitioner that the petition was still being held in abeyance pending legal resolution of the Department of Justice civil complaint against Tetra Tech.

On December 22, 2020, the petitioner informed the petition manager of changes to the petition contacts.

On May 7, 2021, September 7, 2021, December 3, 2021, February 28, 2022, June 6, 2022, and September 6, 2022, the petition manager informed the petitioner that the petition was still being held in abeyance pending legal resolution of the Department of Justice civil complaint against Tetra Tech.

Actions Completed This Quarter/Next Steps:

On December 2, 2022, the petition manager informed the petitioner that the petition was still being held in abeyance pending legal resolution of the Department of Justice civil complaint against Tetra Tech.

The petition manager will continue to check for updates regarding the civil complaint. The petition manager will inform the petitioner if any emergent petition-related activity occurs and will inform the petitioner whether or not there is a change to the abeyance status of the petition.

OPEN PETITION UNDER CONSIDERATION OEDO-21-00547 (Petition Age: 3 months)

Facility: Seabrook Station Licensee Type: Power Petitioner(s): C-10 Research & Education Foundation Date of Petition: October 4, 2022 DD to be Issued by: Office of Nuclear Reactor Regulation Acknowledgment Letter Issued: Not Applicable Closure Letter Issued: Not Applicable Last Contact with Petitioner: December 14, 2022 Petition Manager: James Kim Case Attorney: Sara Kirkwood Issues/Actions Requested:

The petitioner requests that the NRC issue an Order to NextEra seeking to hasten its compliance with the regulatory requirements related to Seabrook Station concrete degradation, the NRCs March 11, 2019, license amendment and the March 12, 2019, renewal of the operating license.

Actions Completed This Quarter/Next Steps:

On October 4, 2022, the petitioner filed a petition for enforcement action under 10 CFR 2.206 (ML22278A133).

On October 13, 2022 (ML22287A147), the petition manager informed the petitioner that the NRC had determined that immediate action was not warranted. The petition manager informed the petitioner that a PRB would begin its evaluation of the petition.

On November 17, 2022 (ML22321A252), the petition manager informed the petitioner that the PRBs initial assessment was that the petition did not meet the MD 8.11 criteria for accepting petitions under 10 CFR 2.206. The petition manager offered the petitioner an opportunity to address the PRB.

On December 14, 2022, the petitioner addressed the PRB in a public meeting and provided written supplements to the petition (ML22350A103 and ML22349A106). The meeting transcript is also considered a supplement to the petition (ML23009B136).

The PRB continues to evaluate the petition, as supplemented, in accordance with MD 8.11 Section III.C to determine if it should be accepted into the 10 CFR 2.206 process.

ML23006A226 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/DD NAME PBuckberg RButler DWrona (JDanna for) JHeisserer DATE 1/06/2023 1/9/2023 1/11/2023 1/20/2023