Engineering Inspections Update Presentation- ROP Public Meeting January 2023
ML23005A282
Person / Time
Issue date: 01/05/2023
From: Douglas Bollock
NRC/NRR/DRO/IRIB
To:
References
22258A303
Download: ML23005A282 (1)


Text

2 Technical/process and inspection implementation training for inspectors completed.

Training included table-top scenarios NRC Technical and Programmatic leads identified. Observing first inspections in each region NRC internal cross-regional panels will be held post inspection

3 Inspection Procedure IP71111.21N.04 completed December 20, 2022 (ML22210A107).

Objectives To verify that engineering performance and maintenance activities to address age-related degradation for structures and components (SCs) are being conducted in a manner that provides reasonable assurance of the safe operation of the plant.

To verify that age-related degradation for plant SCs are appropriately identified, addressed, and corrected.

4 This is NOT an aging-management program inspection.

Verify engineering performance and maintenance activities address age-related degradation Age-related issues, aging components or phenomenon that accelerates the age of components.

12-24 samples, both active and passive components, selection heavily informed by operational experience.

5 Technical and inspection implementation training will be developed and conducted for each regions engineering inspectors.

Training will include table-top scenarios NRC will identify Technical and Programmatic leads NRC internal cross-regional panels will be held post inspection to ensure consistency

6 Questions?

Douglas Bollock Senior Reactor Operations Engineer Office of Nuclear Reactor Regulation Division of Reactor Oversight Reactor Inspection Branch Email: douglas.bollock@nrc.gov; Phone: 301-415-6609 7