Similar Documents at Erwin |
---|
Category:E-Mail
MONTHYEARML23355A1502023-12-21021 December 2023 12-21-2023 Email: Acceptance Review of Exemption Request (Letter 24G-23-0022) ML23318A4492023-11-0909 November 2023 2023-004 NFS NCS Document Request ML23244A0152023-08-22022 August 2023 Correspondence (Email) from Barbara O Neil (Erwin Citizens Awareness Network); Regarding NFS U Metal Project, Appalachian Elktoe ML23187A4872023-07-0505 July 2023 07-05-2023 Email: Acceptance of Revised Physical Protection Plan for NFS - Enterprise Project Identifier L-2023-SPR-0002 ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) ML23131A3612023-05-0404 May 2023 Comments from State of Tennessee on NFS U-Metal Draft Environmental Assessment ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on Nrc'S Response to Nfs' Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70 ML23114A0522023-03-27027 March 2023 2023-002 NFS NCS Document Request ML23027A0452023-01-26026 January 2023 Limited Appearance Statement from Karen M. Burgos in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23027A0412023-01-26026 January 2023 Limited Appearance Statement from Adrianne Hess in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23026A1802023-01-26026 January 2023 Limited Appearance Statement from Creel Allen Pickel, Jr. in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23026A1722023-01-25025 January 2023 Limited Appearance Statement from Katharine C. Shearer in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23025A0762023-01-24024 January 2023 Limited Appearance Statement from Edward Davis in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23024A0632023-01-23023 January 2023 Example of Email Distributing the Atomic Safety and Licensing Board Memorandum Regarding Submission of 10 C.F.R. 2.315(a) Limited Appearance Statements ML23023A2572023-01-23023 January 2023 Limited Appearance Statement from Brita Larsen Clark in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A2552023-01-23023 January 2023 Limited Appearance Statement from Ted V. Jackson in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1762023-01-22022 January 2023 Limited Appearance Statement from Ken Jones in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1742023-01-21021 January 2023 Limited Appearance Statement from Kel Basav in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1712023-01-20020 January 2023 Limited Appearance Statement from Warren Berg in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1682023-01-20020 January 2023 Limited Appearance Statement from Dorothy Sulock in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1672023-01-20020 January 2023 Limited Appearance Statement from Claire Lovelace in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23023A1662023-01-20020 January 2023 Limited Appearance Statement from Anne Craig in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23019A3582023-01-19019 January 2023 Limited Appearance Statement from Rachael Bliss in the Matter of Nuclear Fuel Services, Inc. License Amendment Application ML23003A8122023-01-0202 January 2023 01-02-2023 Email: NFS U-Metal Amendment - RAI Date 2nd Extension ML22362A0392022-12-28028 December 2022 Nuclear Fuel Services - NRC Document Request for Ops Safety Inspection (IR 2023-001) ML22356A0572022-12-21021 December 2022 12-21-2022 Email - Request for Withholding Information from Public Disclosure - Application of 10 CFR 71.15 (C)(1) for Waste Shipments ML22333B0852022-11-16016 November 2022 11-16-2022 Email: Acceptance of Updated Decommissioning Documents for NFS - Enterprise Project Identifier L-2022-DFA-0009 ML22334A2332022-10-31031 October 2022 10-31-2022 Email: NFS U-Metal Amendment - RAI Date Extension ML22271A9762022-09-28028 September 2022 Action Referral - Appeal of Denial of SUNSI Access - Nuclear Fuel Services, Inc. License Amendment Application ML22265A0962022-09-21021 September 2022 Document Request - Emergency Preparedness and Fire Protection Inspection at Nuclear Fuel Services (IR 2022-004) ML22236A0592022-08-23023 August 2022 Email 082322 OGC NLO for re-issuance of FRN on NFS U-metal Acceptance ML22220A2062022-08-0303 August 2022 Document Request - NRC Operational Safety and Transportation Inspection at NFS (IR 2022-003) ML22111A1802022-04-19019 April 2022 E-mail from N.Mertz to J.Downs Providing no-legal-objection on the Federal Register Notice for NFS ML22026A0902022-01-25025 January 2022 01-25-2022 Email: Acceptance of Updated Decommissioning Documents for NFS - Enterprise Project Identifier L-2021-DFA-0009 ML21299A0792021-10-25025 October 2021 NRC Doc Request NFS NCS-PMA IR 2021-004 ML21298A0842021-10-20020 October 2021 Acceptance of NFS Request for Exemption from Certain Force-On-Force Exercise Requirements Due to Covid-19 ML21273A3782021-09-29029 September 2021 09-29-2021 Email: Request for Additional Information on the NFS Request for Exemption from the Biennial Emergency Preparedness Exercise ML21273A3792021-09-29029 September 2021 09-29-2021 Email: Request for Supplemental Information on the NFS Request for Exemption from the NRC-Observed Force-on-Force Exercise ML21179A2192021-06-25025 June 2021 Document Request - NRC Inspection on August 9, 2021 ML21089A0872021-03-26026 March 2021 Email to L.Modica NFS Purification and Conversion ML21033A5822021-02-0101 February 2021 NRC Document Request - NFS IR 2021-001 ML20314A0332020-09-15015 September 2020 Email to NFS for follow-up Information on the RAI Responses Regarding the Category II & III Physical Protection Plans ML20211L7542020-07-29029 July 2020 Document Request - NRC Plant Modifications Inspection on August 17, 2020 ML20175A6572020-06-22022 June 2020 Email to NFS for Request for Additional Information on the Category II & III Physical Protection Plans ML20162A1802020-06-0808 June 2020 NFS Email 10 CFR 70.50(b)(1) Exemption Request Enterprise Project Identification L-2019-LLA-0114 ML20073L8022020-03-12012 March 2020 J.Downs March 12, 2020, Email to A. Morie NFS RAI - Exemption Request from 24-Hour Reporting Requirement ML19211B2242019-07-26026 July 2019 E-mail to Taknowles, Nfs Receipt of Emergency Plan, Revision 25 ML19189A3502019-07-0808 July 2019 Email to Tknowles, Nfs Re Extension of Time to Submit Funding Instruments ML19182A3492019-07-0101 July 2019 Email to Tknowles, Nfs Receipt of Letter Transmitting 4 Security Plans 2023-08-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A4492023-11-0909 November 2023 2023-004 NFS NCS Document Request ML23198A0422023-07-17017 July 2023 NFS OPS 2023-003 Document Request ML23114A0522023-03-27027 March 2023 2023-002 NFS NCS Document Request ML22362A0392022-12-28028 December 2022 Nuclear Fuel Services - NRC Document Request for Ops Safety Inspection (IR 2023-001) ML22265A0962022-09-21021 September 2022 Document Request - Emergency Preparedness and Fire Protection Inspection at Nuclear Fuel Services (IR 2022-004) ML22111A2812022-04-28028 April 2022 Letter to Tim Knowles Re NFS Uranium Purification and Conversion Services (U-Metal Project) Environmental Requests for Additional Information ML22014A4212022-01-21021 January 2022 Request for Supplemental Information: Information-Application for U-Metal License Amendment-Enterprise Project Identification Number Number L 2021 LLA-0213 ML21299A0792021-10-25025 October 2021 NRC Doc Request NFS NCS-PMA IR 2021-004 ML21273A3792021-09-29029 September 2021 09-29-2021 Email: Request for Supplemental Information on the NFS Request for Exemption from the NRC-Observed Force-on-Force Exercise ML21273A3782021-09-29029 September 2021 09-29-2021 Email: Request for Additional Information on the NFS Request for Exemption from the Biennial Emergency Preparedness Exercise ML21179A2192021-06-25025 June 2021 Document Request - NRC Inspection on August 9, 2021 ML20314A0332020-09-15015 September 2020 Email to NFS for follow-up Information on the RAI Responses Regarding the Category II & III Physical Protection Plans ML20175A6572020-06-22022 June 2020 Email to NFS for Request for Additional Information on the Category II & III Physical Protection Plans ML20073L8022020-03-12012 March 2020 J.Downs March 12, 2020, Email to A. Morie NFS RAI - Exemption Request from 24-Hour Reporting Requirement ML18207A3512018-08-13013 August 2018 Nuclear Fuel Services, Inc. Request for Additional Information Concerning Final Status Survey Report (Enterprise Project Identifier L-2018-DFI-0000) ML18207A3502018-08-13013 August 2018 Enclosurequest for Additional Information Concerning Final Status Survey Report 2023-07-17
[Table view] |
Text
Joel Rivera Ortiz From: Rivera Ortiz, Joel Sent: Friday, December 23, 2022 10:35 AM To: 'Holly, Thomas C' Cc: Lindsey Cooke; Larry Harris; Cynthia Taylor; Todd Shewmaker; 'Gibson, Clifton T'
Subject:
Document Request - NRC Inspection on January 23, 2023 Attachments: NRC Inspection Document Request - NFS Ops Safety IR 2023-001.pdf
Dear Mr. Holly,
The NRC will conduct a routine inspection at the Nuclear Fuel Services facility on January 23, 2023. The inspection will implement the following NRC inspection procedure (IP):
IP 88020 - Operational Safety (Inspectors: Joel Rivera, Cynthia Taylor, and Todd Shewmaker)
This email requests a number of documents that we would like to obtain for our preparation activities (see attachment). If practical, we would like to have the documents at least a week prior to the inspection to facilitate our preparation and be able to conduct a productive inspection. In the attachment, we also specified some items that we will need during the on-site portion of the inspection.
If you have any questions or concerns regarding this request, please contact me to discuss.
Best Regards, Joel Rivera-Ortiz Sr. Fuel Facility Inspector U.S. Nuclear Regulatory Commission/Region-II Division of Fuel Facility Inspection Projects Branch 1 404-997-4825 Joel.Rivera-Ortiz@nrc.gov 1
U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.
Atlanta, GA 30303-1200 December 23, 2022 INSPECTION DOCUMENT REQUEST Licensee: Nuclear Fuel Services, Inc.
Facility: BWXT-Nuclear Fuel Services (Erwin, TN)
Docket Number: 07000143 License Number: SNM-124 Inspection Report 2023-001 Number:
Enterprise Number: EPID: I-2023-001-0051 Inspection Dates: January 23 - 27, 2023 Inspection IP 88020 - Operational Safety, Rev. 1/10/2021 Procedure(s):
Inspector(s): Joel Rivera-Ortiz (Team Leader)
Sr. Fuel Facility Inspector P: 404-997-4825 U.S. Nuclear Regulatory Commission (NRC) E: Joel.Rivera-Ortiz@nrc.gov Region-II Office Division of Fuel Facility Inspection (DFFI)
Cynthia Taylor P: 404-997-4480 Sr. Fuel Facility Inspector E: Cynthia.Taylor@nrc.gov U.S. NRC Region-II Office/DFFI Todd Shewmaker (Trainee)
Fuel Facility Inspector P: 404-997-4673 U.S. NRC Region-II Office/DFFI E: Todd.Shewmaker@nrc.gov
Inspection Document Request for NRC Inspection at Nuclear Fuel Services, Inc.
The following is a request of documents the U.S. Nuclear Regulatory Commission (NRC) inspectors are interested in reviewing prior to the on-site inspection visit consistent with the guidance in NRC Inspection Manual Chapter 0620, Inspection Documents and Records.
The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Please provide the current version of these documents unless specified otherwise. If any of the information requested below does not apply to the facility, please specify in your response. The licensee is not required to provide documents that are already available in ADAMS. Electronic media is preferred for receiving the information, if readily available (preferably Microsoft Word format or searchable
.pdf files). The NRC can establish a secure cloud-based file storage service to facilitate document sharing as needed. If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.
INSPECTION PROCEDURE 88020 - OPERATIONAL SAFETY Documents Requested in Advance for In-Office Preparation
- 1) Latest version of the license application (if different from the revisions submitted to the NRC in calendar year 2020)
- 2) Latest version of the Integrated Safety Analysis (ISA) Summary (if different from the revision submitted to the NRC in January 2022)
- 3) Procedures governing the implementation of the following management measures, as applicable to items relied on for safety (IROFS) and/or other safety controls credited in the license application:
Configuration Management Maintenance Training and Qualifications Procedures Development and Implementation Audits and Assessments Incident Investigations and Corrective Action Records Management Quality Assurance (QA) for IROFS
- 4) List of corrective action program documents generated in the last 12 months related to problems with IROFS, including degraded or failed IROFS. Please include a brief description of the problem, if practical.
- 5) List of temporary compensatory measures put in place in the last 12 months to support degraded or failed IROFS. Please include a brief description of the compensatory measure, if practical.
- 6) List of plant changes implemented in the last 12 months that affected IROFS; including modifications of existing controls, elimination of previous controls, and addition of new controls
- 7) List of changes in the operations organization in the last 12 months that were subject to the position-specific requirements of the license application 2
- 8) Copy of the most recent self-assessment and/or audits report in the area of operational safety, including chemical and fire safety
- 9) Contact information for key personnel expected to support the operational safety inspection Documents/Support Requested for On-site Portion of the Inspection
- 1) The inspectors intend to focus the inspection on process exhaust ventilation systems in Building 301 and the 300 Complex. However, inspection focus areas may change as deemed necessary to meet the inspection procedure requirements. The inspectors will select a sample of credited safety controls (e.g., IROFS) in the selected process areas for review. Due to the sensitive nature of some the safety information related to those process areas, the IROFS will most likely be selected onsite. For the IROFS to be selected for review, the inspectors will need the items below.
- a. Plant procedures showing the specific operation and implementation of the IROFS. For example, operating procedures showing the implementation of administrative controls or the operation of active engineered controls.
- b. Procedures and recent records of management measures performed to demonstrate availability and reliability of the IROFS. For example, recent records of testing, inspection, calibration, and preventive maintenance performed on the selected IROFS.
- c. Procedures and records showing that training requirements for the selected IROFS have been maintained
- d. Complete configuration management package for recent changes affecting the selected IROFS
- 2) The inspectors will need site support to conduct plant tours and observe ongoing operations in the control room (if applicable) and other production areas.
- 3) The inspectors will need site support to coordinate interviews with plant operators.
- 4) The inspectors will need site support to attend the plan of the day meetings.
- 5) Please keep inspectors informed of plant operations on a daily basis.
- 6) Please inform the inspectors of any updates to the operational safety program that have occurred since this document request was issued.
3
PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response.
Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
4