GEH Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments
ML22350A470
Person / Time
Site: 07200001
Issue date: 12/12/2022
From: Mcfadden A
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
References
M220171
Download: ML22350A470 (1)


Text

  • HITACHI GE Hitachi Nuclear Energy

Anthony E. McFadden Plant Manager

GEH Morris Operation 7555 E. Colhns Rd Morris, IL 60450 USA M220171 T (815) 942-5590 x174 F (815) 942-5631 anthony.mcfadden@ge.com December 12, 2022

A TIN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

GEH Morris Operation Submittal of Biennial Report 1 OCFR72.48; Changes, Tests, and Experiments

Reference:

SNM-2500 Docket 72-1

This letter is submitted, on behalf of GE Hitachi Nuclear Energy Americas, LLC (GEH),

per the requirements of 10CFR72.48(d)(2) for the period of Dec 2020 to Dec 2022 for GEH Morris Operation (MO).

One 72.48 evaluation was conducted from the period of 08 Dec 2020 to 12 Dec 2022. No evaluations warranted an amendment to the current NRC license (SNM-2500).

A brief description and summary of the evaluation is included in the attached enclosure (Encl 1 ).

Please do not hesitate to contact me if there are any questions.

An ony cFadd/n~k~

Plant Manager GEH Morris Operation

Commitments: No commitments have been made in this letter.

Enclosures:

1. 72.48 Evaluation for Revision of Consolidated Safety Analysis Report (Rev 15)

Cc: PM 22-009 72.48 AppiiCIIblllty Analpls for Changes, Testa, Eltpetlmenta Review Number: SC-2021-48-01 Deecrlptlon of A... -*..::!.:

Revise MO CSAR NEDC).2132B (f8VIslon 16). CSAR update In a/lgntnMt with lflellcenslng 8Cftvll/ea.

r* 0 Requl,. m Mlenchnent to the Hoe.... 8

  • clue co a chlnllllln tKhnlcal X apeolftoallo*?

X Reault Ia men than

  • mlnlmallncntaseln the frequenGJ of oc:cU~N~W:e of an accident prevlaualr evalualadiD the CIAR?

Reaulllllllltft thin

  • mlnlmallncn1Hin tile lllcellhoad of occurrence of
  • X malfUnction of
  • aptam. etructu~w, or oomJIOIIIftt (88C) lmpcwtant to aaretr

.........,eva..... In tlleCIAR?

X Reault pravloullr evaluabldln tMCSAR? In more tltu a mfnlmlll.-ueln tiHt coneequenca of an accident X.. Reault 8IC Important to..r.ty prevlolllly anluatld In lila CSAR? In mo.. than a~nlnlmallnc:Naeln tile COftHCIUancn or a malfunction of X c..- a poaelbllty for an accident of a.-....nt.,. than any prwioualy evaluated In ella CIAR?

X Crelta a poaalbllty for a ~Mifunctlon of an sse Important to 8lfety with

  • dJfferat ruult...,. the prwloallr enluatlldln tile CSAR?

X b8ult In a clellgn bull limit for llnlon product barrier a deKrlbed In the CSAR baing elU*Idecl or alf8lwcl?

X Rftult In a dapaJture 11om a method of.valuation cltlcrlbadln the C8AR uaed In aalllblllhlng the clallgn...._or In the...., analylel?

Jlt:*** _. and NRC.. to aay appranl...,to lmplemlntatlon. of tile qalla*ln theletwfll NqUire an amendment to thellcanaa.

If detelmlnldlon a1,..,.... tlult.. 1M chMga. tat, llA Wl'lttlll raco* abaU be produced which provide the *..,.,..,._. daN not require allaanla....,...t. bula for the

Cta.ngee and.v.. uatlan..,.......,... ahalla. *portH to tile NRC fN8f'J twa yura.

.....,eu Prepared.*. a..A~~Pnmltiliiiii'fiftiGtllll-....-uo** **~~~;;.-~... by: F. C. Partnev.

Title:

rJJ~,;:..,.-------OMC Da : 212312021

Operations & Mulfanance Coordinator: -i~~~f::='~-- DM<< i~~

Administrator, EHS & PtOCUtema1t Date: 40

~~~----Date:.?~~' :......:.~~~c=--- oata: 1

Maw. AddllloniiPII*Miiflle......_.to prov~c~e.-lllo............. NllldrecltDIIddna anr Gftheabove........

  • HITACHI Morris Ope18tlon Employees Only Morris Operation Instruction M0/-430

72.48 Applicability Analysis for Changes, Tests, Experiments Review Number: SC-2021-48*01 Description of Activity:

Revise MO CSAR NED0-21326 (revision 15). CSAR update in alignment with re.licensing activities.

11 NO" Justification

Sections 1*11 and Appendices A-1 through A-17 were updated for revision 15 of the MO CSAR.

In general, the updates reflect administrative changes such as updated local business names and population density data. There are many instances of formatting changes and header/footer updates.

Occasionally language was added to clarify previous claims and/or justifications. But in no instance is there a change to tests, processes, or monitoring requirements that are not conservative or essentially the same. And in no instance is there an increase of the likelihood of an event that reduces the safety of the facility or impacts the design basis for the safety evaluation.