Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:
Grand Gulf First Exam Date:
10/10/2022 Written Exam Outline (5/6/22)
Comment Resolution 1 NRC Generated None Required 2 Verify Written Admin Date Written Date - 10/17/2022 Admin Date - 10/10/2022 Administrative JPM Outline (5/6/22)
Comment Resolution 1
Ensure R3 not too similar to 2021 exposure JPM
- 1) 2021 JPM is in an Alert which automatically raises the Dose Limit to NRC levels. The 2022 JPM is in an Unusual Event which does not raise the limit.
- 2)
The applicant is given a different task to perform and in a different location. In 2021 the expected dose is given, in 2022 the applicant is given a RP room map and must determine expected dose by knowing where the components are located within the room.
Control Room / In-Plant System JPM Outline (5/6/22)
Comment Resolution 1
SRO-U has only the minimum alternate path JPMs (2). Suggest SRO-U do an alternate path JPM in-plant so they have minimum +1 and that would also provide an in-plant alternate path JPM for everyone (discuss)
An in-plant alternate path JPM has been given in the last 3 exams, to prevent the possibility of being repetitive, request to change the SROU to perform 3 alternate path JPMs in the Simulator and only 2 in the plant (approved).
2 Eight new JPMs - impressive None Required
OBDI 202 - IOLE Process Rev 3 Simulator Scenario Outline Comments (5/6/22)
Comment Resolution 1
All - Review critical tasks to ensure bounding criteria are as specific as is possible, including detailed explanation for bounding criteria (time limit, even if an approximation, if possible).
(Discussion item)
Discussed with chief.
2 All - Discuss any potential similarities with past exams (Discussion item)
Discuss with chief.
3 A table listing all TS information (such as was done with the critical tasks) would be great.
Created TS table in the associated event.
4 Scenario 1 - Typo in Event 5?
(thunderview)
Thunderview is acceptable, will discuss with chief.
5 Scenario 2, Event 7 (cover sheet) -
NOTE indicating instrument failure being used to replace reactivity not necessary (clearly allowed by NUREG 1021)
None Required 6 Scenario 3, Event 5 (cover sheet) - see comment 4 None Required 7
Scenario 3, Event 3 - Sentence following bullets appears to be missing some words.
Sentence is clarified.