ML22342B249

From kanterella
Jump to navigation Jump to search
10 Draft Operating Test Comments
ML22342B249
Person / Time
Site: Grand Gulf 
Issue date: 10/14/2022
From: Heather Gepford
Operations Branch IV
To:
Entergy Operations
References
50-416/22-10 50-416/OL-22
Download: ML22342B249 (1)


Text

Grand Gulf 2022-10 Draft Operating Test Comments NOTE: This summary is being provided in lieu of Form 2.3-3, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.

Scenario 1:

Added cue for expected alarm on power change Replaced Event 7 Scenario 2:

Modified Event 8 Scenario 3:

Event 4 - Add cue for operator on back panel Changed CT numbering so that text and summary match Scenario 4: N/A JPMs (Generic)

The JPM task standards appear to be just a list of critical steps. Is this how youve always done it? Not sure it meets intent of where the applicant must correctly end up with the task (discuss). Discussed; in the future, please at least mention what task the applicant is trying to accomplish along with the list of critical steps.

JPM S1 End JPM after step 18 JPM S-2 Must go to manual on B Feed Pump prior to scram (critical)

Helper allowed to silence alarm JPM S-3 Step 1 not critical Provide all 4 pages of Attachment 3 Stagger with S4

JPM S-4 Steps 1 and 7 are not critical Stagger with S3 JPM S-5 No comments JPM S-6 Replaced due to similarity to scenario Step 2 critical in replacement JPM JPM S-7 Validation time changed to 5 minutes JPM S-8 No comments JPM P-1 Added light cue in first and last step Added more specificity to test cock cues JPM P-2 No comments JPM P-3 Start JPM at Step 5 Revised last step to be consistent with task JPM SA-1:

No comments

JPM SA-2:

No comments JPM SA-3:

Replaced; same as task in Scenario 1 JPM SA-4:

Added within 15 minutes to task standard in Step 2 JPM SA-5:

Does this need to be administered individually (verifying correct actions taken on computer)? YES JPM RA-1:

Modified initiating cue to say determine any limits that have been exceeded JPM RA-2:

No comments JPM RA-3:

Added no EAL declaration has been made in initial conditions Add determine total dose is 1000 mRem in task standard JPM RA-4:

Looks like this one needs administered individually (telephone cues)? YES