ML22336A213
From kanterella
Jump to navigation
Jump to search
ML22336A213 | |
Person / Time | |
---|---|
Site: | WM-00054, WM-00110 |
Issue date: | 09/09/2020 |
From: | Daniel B. Stephens & Associates, US Dept of Energy, Office of Environmental Management |
To: | Dwyer S Dwyer Engineering, Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML22336A207 | List: |
References | |
MOAB-00004-23 | |
Download: ML22336A213 (1) | |
Category:Report
MONTHYEARML24242A3212024-08-29029 August 2024
[Table view]DOE - Issue Briefing Memo, Disposition of Rail Materials from Fernald ML24183A3732024-05-31031 May 2024 DOE - Moab Umtra Project Final Remedial Action Plan and Site Design for Stabilization of Moab Title I Uranium Mill Tailings at the Crescent Junction, Utah, Disposal Site, Revision 3 ML24183A3782024-04-30030 April 2024 DOE - Addendum E, Final Remedial Action Plan DOE-EM/GJ1547 - Remedial Action Inspection Plan (Raip) ML24071A1152024-03-31031 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24183A3802024-03-31031 March 2024 DOE - Addendum G, Final Remedial Action Plan DOE-EM/GJ1547 - Evapotranspiration Cover System Post-Construction Monitoring Plan ML24183A3752024-03-31031 March 2024 DOE - Addendum B, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Specifications ML24183A3742024-03-31031 March 2024 DOE - Addendum a, Final Remedial Action Plan DOE-EM/GJ1547 -DOE Responses to NRC Comments ML24183A3762024-03-31031 March 2024 DOE - Addendum C, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Drawings ML24183A3792024-03-31031 March 2024 DOE - Addendum F, Final Remedial Action Plan DOE-EM/GJ1547 - Rock Source Data ML24183A3812024-03-31031 March 2024 DOE - Addendum H, Final Remedial Action Plan DOE-EM/GJ1547 - Field Demonstration Plan for Construction of the ET Cover Surface Admixture Layer ML24011A2862023-12-31031 December 2023 Dwyer Engineering LLC, Crescent Junction Disposal Site, Evapotranspiration Cover System Design Report ML24183A3772023-12-31031 December 2023 DOE - Addendum D, Final Remedial Action Plan DOE-EM/GJ1547 - Crescent Junction Disposal Site Evapotranspiration Cover System Design Report ML23081A0572023-03-31031 March 2023 U.S. Department of Energy, Office of Legacy Management, 2022 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML23026A3562023-01-26026 January 2023 U.S. Department of Energy, Office of Legacy Management Aerial Survey at the Grand Junction, Co, Disposal Site ML23073A3762022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix B. Photographs ML23073A3742022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Moab Umtra Project Crescent Junction Disposal Cell Interim Completion Report Addendum - L, Revision 0 ML23073A3772022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L, Configuration Management Plan for Design and Construction Design Change Control Procedure Construction Interface Document ML23073A3752022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix A. Construction Verification Data ML22336A2092022-12-0202 December 2022 DOE Moab Umtra Responses to Nuclear Regulatory Commission (NRC) Staff Comments on Crescent Junction Disposal Site Alternative Final Cover System 90 Percent Design Report ML22336A2122022-12-0202 December 2022 EPA-909-R-11-007, Closing Small Tribal Landfills and Open Dumps How to Design Environmentally Safe Covers Including Additional Design Guidance for Arid Regions ML21298A0692021-11-0202 November 2021 Enclosure 1 NRC Comments on DOE 60 Percent Design Documents ML22336A2132020-09-0909 September 2020 Laboratory Report for Dwyer Engineering LLC, Crescent Junction Project ML22336A2112013-02-28028 February 2013 LMS/GRJ/S07112, Cover Performance Enhancement Tests at the Grand Junction, Colorado, Disposal Site: Construction Documentation, Material Testing, and Instrument Calibration ML22336A2152010-06-30030 June 2010 A7. Cap Rock and Armoring Cap Rock Durability and Gradation Test Results 2024-08-29 Category:Technical MONTHYEARML24183A3732024-05-31031 May 2024
[Table view]DOE - Moab Umtra Project Final Remedial Action Plan and Site Design for Stabilization of Moab Title I Uranium Mill Tailings at the Crescent Junction, Utah, Disposal Site, Revision 3 ML24183A3782024-04-30030 April 2024 DOE - Addendum E, Final Remedial Action Plan DOE-EM/GJ1547 - Remedial Action Inspection Plan (Raip) ML24071A1152024-03-31031 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24183A3802024-03-31031 March 2024 DOE - Addendum G, Final Remedial Action Plan DOE-EM/GJ1547 - Evapotranspiration Cover System Post-Construction Monitoring Plan ML24183A3752024-03-31031 March 2024 DOE - Addendum B, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Specifications ML24183A3762024-03-31031 March 2024 DOE - Addendum C, Final Remedial Action Plan DOE-EM/GJ1547 - Final Design Drawings ML24183A3792024-03-31031 March 2024 DOE - Addendum F, Final Remedial Action Plan DOE-EM/GJ1547 - Rock Source Data ML24183A3812024-03-31031 March 2024 DOE - Addendum H, Final Remedial Action Plan DOE-EM/GJ1547 - Field Demonstration Plan for Construction of the ET Cover Surface Admixture Layer ML24183A3742024-03-31031 March 2024 DOE - Addendum a, Final Remedial Action Plan DOE-EM/GJ1547 -DOE Responses to NRC Comments ML24011A2862023-12-31031 December 2023 Dwyer Engineering LLC, Crescent Junction Disposal Site, Evapotranspiration Cover System Design Report ML24183A3772023-12-31031 December 2023 DOE - Addendum D, Final Remedial Action Plan DOE-EM/GJ1547 - Crescent Junction Disposal Site Evapotranspiration Cover System Design Report ML23081A0572023-03-31031 March 2023 U.S. Department of Energy, Office of Legacy Management, 2022 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML23073A3762022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix B. Photographs ML23073A3742022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Moab Umtra Project Crescent Junction Disposal Cell Interim Completion Report Addendum - L, Revision 0 ML23073A3772022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L, Configuration Management Plan for Design and Construction Design Change Control Procedure Construction Interface Document ML23073A3752022-12-31031 December 2022 Us Dept. of Energy, Office of Environmental Management, Cj Interim Completion Report – Addendum L Appendix A. Construction Verification Data ML22336A2092022-12-0202 December 2022 DOE Moab Umtra Responses to Nuclear Regulatory Commission (NRC) Staff Comments on Crescent Junction Disposal Site Alternative Final Cover System 90 Percent Design Report ML22336A2122022-12-0202 December 2022 EPA-909-R-11-007, Closing Small Tribal Landfills and Open Dumps How to Design Environmentally Safe Covers Including Additional Design Guidance for Arid Regions ML21298A0692021-11-0202 November 2021 Enclosure 1 NRC Comments on DOE 60 Percent Design Documents ML22336A2132020-09-0909 September 2020 Laboratory Report for Dwyer Engineering LLC, Crescent Junction Project ML22336A2112013-02-28028 February 2013 LMS/GRJ/S07112, Cover Performance Enhancement Tests at the Grand Junction, Colorado, Disposal Site: Construction Documentation, Material Testing, and Instrument Calibration ML22336A2152010-06-30030 June 2010 A7. Cap Rock and Armoring Cap Rock Durability and Gradation Test Results 2024-05-31 |
Retrieved from "https://kanterella.com/w/index.php?title=ML22336A213&oldid=3716867"